Loading organization details...
Loading organization details...
FACILITY RENTAL TO NON-PROFITS
Source: IRS Form 990 (Tax Year 2024)
Source: IRS e-Filed Form 990 (from the IRS e-File system), Tax Year 2023
Total Revenue
▼$217.4K
Program Spending
68%
of total expenses go to program services
Total Contributions
$0
Total Expenses
▼$273.3K
Total Assets
$2.2M
Total Liabilities
▼$71.9K
Net Assets
$2.1M
Officer Compensation
→$74.9K
Other Salaries
$107K
Investment Income
$7,711
Fundraising
▼N/A
Source: USAspending.gov · Searched by organization name
Total Federal Funding (partial)
$2.4B
Awards Found
50+
Additional awards may exist. View all on USAspending.gov →
Environmental Protection Agency
$95.3M
DESCRIPTION:THIS AGREEMENT PROVIDES A CAPITALIZATION GRANT, FUNDED BY THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58), FOR THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF) PROGRAM. FUNDS WILL BE USED FOR DWSRF-ELIGIBLE LEAD SERVICE LINE REPLACEMENT PROJECTS AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES. THE AWARD FURTHERS THE PUBLIC HEALTH PROTECTION OBJECTIVES OF THE SAFE DRINKING WATER ACT (SDWA). ACTIVITIES:THE RECIPIENT OF THESE FUNDS WILL PROVIDE LOW INTEREST RATE FINANCING TO ELIGIBLE PUBLIC WATER SYSTEMS FOR THE COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE DRINKING WATER IMPROVEMENT PROJECTS. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC SETASIDES, INCLUDING BUT NOT LIMITED TO PROVIDING TECHNICAL ASSISTANCE TO SMALL SYSTEMS, FOR OPERATOR CERTIFICATION ACTIVITIES, AND SOURCE WATER PROTECTION ACTIVITIES. SUBRECIPIENT:OF THIS GRANT AMOUNT, THE MINNESOTA PUBLIC FACILITIES AUTHORITY (PFA) WILL UTILIZE $9,640,700 FOR LOCAL ASSISTANCE SET-ASIDE (DG) ACTIVITIES ($6,096,400 FFY25 DWSRF IIJA LSLR ALLOTMENT + $939,100 FFY23 1ST REALLOTMENT + $2,419,300 FFY24 1ST REALLOTMENT + $185,900 FFY22 3RD REALLOTMENT ESTIMATE = $9,640,700 TOTAL), $3,856,280 FOR ADMINISTRATION SET-ASIDE (DD) ACTIVITIES ($2,438,560 FFY25 DWSRF IIJA ALLOTMENT + $375,640 FFY23 1ST REALLOTMENT + $967,720 FFY24 1ST REALLOTMENT + $74,360 FFY22 3RD REALLOTMENT ESTIMATE = $3,856,280 TOTAL), $1,928,140 FOR SMALL SYSTEMS SET-ASIDE (DE) ACTIVITIES ($1,219,280 FFY25 DWSRF IIJA LSLR ALLOTMENT + $187,820 FFY23 1ST REALLOTMENT + $483,860 FFY24 1ST REALLOTMENT + $37,180 FFY22 3RD REALLOTMENT ESTIMATE = $1,928,140 TOTAL), AND $80,981,880 AS LOANS (DA) ($51,209,760 FFY25 DWSRF IIJA ALLOTMENT + $7,888,440 FFY23 1ST REALLOTMENT + $20,322,120 FFY24 1ST REALLOTMENT + $1,561,560 FFY22 3RD REALLOTMENT ESTIMATE = $80,981,880 TOTAL) AS PER MINNESOTA'S INTENDED USE PLAN. ASSISTANCE PROVIDED IN THE FORM OF LOANS WITHIN THE DWSRF PROGRAM IS EXEMPT FROM 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUBAWARDS AS PROVIDED IN 2 CFR 1500.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE FINANCING, PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE LEAD SERVICE LINE PROJECTS AND ASSOCIATED ACTIVITIES. DELIVERABLES WILL ALSO BE USED TO INCREASE THE LEAD SERVICE LINE-RELATED TECHNICAL, MANAGERIAL, AND FINANCIAL CAPACITY OF PUBLIC WATER SYSTEMS. THE EXPECTED OUTCOME IS PUBLIC HEALTH PROTECTION. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE.
Environmental Protection Agency
$88.4M
DESCRIPTION:THIS AGREEMENT PROVIDES A CAPITALIZATION GRANT, FUNDED BY THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58), FOR THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF) PROGRAM. FUNDS WILL BE USED FOR DWSRF-ELIGIBLE LEAD SERVICE LINE REPLACEMENT PROJECTS AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES. THE AWARD FURTHERS THE PUBLIC HEALTH PROTECTION OBJECTIVES OF THE SAFE DRINKING WATER ACT (SDWA).ACTIVITIES:THE RECIPIENT OF THESE FUNDS WILL PROVIDE LOW-INTEREST RATE FINANCING TO ELIGIBLE PUBLIC WATER SYSTEMS FOR THE COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE DRINKING WATER IMPROVEMENT PROJECTS. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC SET-ASIDES. FUNDS WILL BE USED FOR DWSRF-ELIGIBLE LEAD SERVICE LINE REPLACEMENT PROJECTS AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES.SUBRECIPIENT:DRINKING WATER STATE REVOLVING FUND PROGRAM IS EXEMPT FROM 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUBAWARDS AS PROVIDED IN 2 CFR 1500. PROGRAM PROVIDES ASSISTANCE IN THE FORM OF LOANS.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE FINANCING, PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE LEAD SERVICE LINE PROJECTS AND ASSOCIATED ACTIVITIES. DELIVERABLES WILL ALSO BE USED TO INCREASE THE LEAD SERVICE LINE-RELATED TECHNICAL, MANAGERIAL, AND FINANCIAL CAPACITY OF PUBLIC WATER SYSTEMS. THE EXPECTED OUTCOME IS PUBLIC HEALTH PROTECTION. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE.
Department of Transportation
$84.2M
PROJECT TITLE: STERLING HWY MP 8-25 SUNRISE INN TO SKILAK LAKE RD STG 3&4 :::: PROJECT DESCRIPTION: THIS IS STAGES 3 & 4 AND THE MAIN CONSTRUCTION PHASE OF THE NEW HIGHWAY ALIGNMENT EAST ANDWEST OF JUNEAU CREEK CONNECTING BACK TO THE EXISTING STERLING HIGHWAY. WORK INCLUDES RECONSTRUCTION AND NEW CONSTRUCTION AND GRADING, ROADSIDE HARDWARE, DRAINAGE, STRUCTURES, AND ANCILLARY WORK. THIS PROJECT IMPLEMENTS SECTION 1303 OF THE MOVING AHEAD FOR PROGRESS IN THE 21ST CENTURY ACT (MAP-21) AUTHORIZING THE USE OF THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) CONTRACTING METHOD. DESIGN WAS COMPLETED UNDER PARENT PROJECT, 0212015/53014 STERLING HIGHWAY MILEPOST 44.5 TO 58 (MILEPOINT 7.6 TO 2), SUNRISE INN TO SKILAK LAKE ROAD RECONSTRUCTION.
Environmental Protection Agency
$82.6M
THIS AGREEMENT PROVIDES FUNDING UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA) TO THE STATE OF MINNESOTA TO CAPITALIZE ITS REVOLVIN
Department of Agriculture
$80M
SANTA CLARA VALLEY WATER DISTRICT WILL IMPLEMENT A FLOOD CONTROL MANAGEMENT SYSTEM FOR UPPER LLAGAS CREEK FOR PHASE 2B IN SANTA CLARA COUNTY, CALIFORNIA.
Department of Transportation
$68.8M
PURPOSE: RECONSTRUCT TAXIWAY LIGHTING; SHIFT TAXIWAY; REHABILITATE TAXIWAY; EXTEND/EXPAND TAXIWAY; REHABILITATE RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXTENDS EXISTING TAXIWAY D BY AN ADDITIONAL 1,050 FEET IN LENGTH TO BRING THE AIRPORT INTO CONFORMITY WITH CURRENT STANDARDS. THIS PROJECT RECONSTRUCTS EXISTING TAXIWAY C LIGHTING THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT REHABILITATES 1,058 FEET OF EXISTING PAVED TAXIWAY E TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE PAVEMENT AND EXTEND ITS USEFUL LIFE. THIS PROJECT REHABILITATES 1,822 FEET OF EXISTING PAVED TAXIWAY C TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE PAVEMENT TO EXTEND ITS USEFUL LIFE. THIS PROJECT REHABILITATES 150 FEET OF EXISTING PAVED RUNWAY 08 TO MAINTAIN THE STRUCTURAL INTEGRITY TO EXTEND ITS USEFUL LIFE. THIS PROJECT REHABILITATES 5,400 FEET OF EXISTING PAVED RUNWAY 11/29 TO MAINTAIN THE STRUCTURAL INTEGRITY, MINIMIZE FOREIGN OBJECT DEBRIS, AND EXTEND ITS USEFUL LIFE. THIS PROJECT REHABILITATES 5,400 FEET OF EXISTING PAVED RUNWAY 11/29 TO MAINTAIN THE STRUCTURAL INTEGRITY, MINIMIZE FOREIGN OBJECT DEBRIS, AND EXTEND ITS USEFUL LIFE. THIS PROJECT SHIFTS EXISTING TAXIWAY D BY 8 FEET TO ENHANCE SAFETY. THIS GRANT FUNDS PHASE 1, WHICH CONSISTS OF RECONSTRUCTION OF THE RUNWAY EDGE LIGHTING. THIS GRANT FUNDS PHASE 1, WHICH CONSISTS OF REHABILITATION OF THE TAXIWAY E PAVEMENT. THIS GRANT FUNDS PHASE 2, WHICH CONSISTS OF RECONSTRUCTION OF THE TAXIWAY EDGE LIGHTING. THIS GRANT FUNDS PHASE 2, WHICH CONSISTS OF THE REHABILITATION OF THE RUNWAY PAVEMENT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH KODIAK, ALASKA.
Department of Transportation
$68.1M
PROJECT TITLE: STERLING HIGHWAY MILEPOST 44.5 TO 58 (MILEPOINT 7.6 TO 22), SUNRISE INN TO SKILAK LAKE ROAD, RECONSTRUCTION :::: PROJECT DESCRIPTION: RECONSTRUCTION, BRIDGE WORK, ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS, INTERSECTION IMPROVEMENTS, ADA IMPROVEMENTS, AND UTILITIES.
Department of Transportation
$64.6M
PROJECT TITLE: PARKS HIGHWAY MP 319-322 RECONSTRUCTION :::: PROJECT DESCRIPTION: RECONSTRUCT THE PARKS HIGHWAY FROM MILEPOST 319 TO MILEPOST 322. PROJECT WILL INCLUDE DRAINAGE IMPROVEMENTS, ROADSIDE HARDWARE, AND UTILITIES.
Department of Transportation
$64.3M
SEWARD HWY: MP 75-90 ROAD AND BRIDGE REHABILITATION, PHASE 1
Department of Transportation
$57M
PROJECT TITLE: DALTON HWY MP 289-305 REHABILITATION :::: PROJECT DESCRIPTION: REV 8/2017REHABILITATE AND WIDEN THE DALTON HIGHWAY BETWEEN MILEPOSTS 289 AND 305. PROJECT WORK WILL INCLUDE MINOR REALIGNMENTS, GRADE RAISES, TURNOUTS, ROADSIDE HARDWARE AND DRAINAGE IMPROVEMENTS.
Department of Transportation
$54.6M
PURPOSE: RECONSTRUCT TAXIWAY LIGHTING; RECONSTRUCT RUNWAY LIGHTING; INSTALL AIRPORT BEACON; REHABILITATE TAXIWAY; REHABILITATE APRON; CONSTRUCT/EXTEND/IMPROVE SAFETY AREA; REHABILITATE RUNWAY; INSTALL MISCELLANEOUS NAVAIDS. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXTENDS THE RUNWAY 17/35 SAFETY AREA 450 FEET TO MEET FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. THIS IMPROVEMENT WILL ENHANCE SAFETY AT THE AIRPORT. . THIS PROJECT EXTENDS THE RUNWAY 6/24 SAFETY AREA 35 FEET TO MEET FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. THIS IMPROVEMENT WILL ENHANCE SAFETY AT THE AIRPORT. . THIS PROJECT INSTALLS A NEW ROTATING BEACON TO IMPROVE SAFETY AND PROVIDE PILOTS WITH CRITICAL AIRFIELD INFORMATION. THIS PROJECT RECONSTRUCTS THE EXISTING RUNWAY 17/35 LIGHTING SYSTEM THAT HAS REACHED THE END OF ITS USEFUL LIFE AND REQUIRES RECONSTRUCTION TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. THIS PROJECT RECONSTRUCTS THE EXISTING RUNWAY 6/24 LIGHTING SYSTEM THAT HAS REACHED THE END OF ITS USEFUL LIFE AND REQUIRES RECONSTRUCTION TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. THIS PROJECT RECONSTRUCTS THE EXISTING TAXIWAY A AND B LIGHTING SYSTEM THAT HAS REACHED THE END OF ITS USEFUL LIFE AND REQUIRES RECONSTRUCTION TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. . THIS PROJECT REHABILITATES 1,520 FEET OF RUNWAY 6/24 TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE GRAVEL SURFACE. THIS PROJECT REHABILITATES 2,000 FEET OF THE EXISTING TAXIWAY A AND B GRAVEL SURFACE TO EXTEND ITS USEFUL LIFE. THIS PROJECT REHABILITATES 36,769 SQUARE YARDS OF THE EXISTING GENERAL AVIATION APRON TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE GRAVEL SURFACE. . THIS PROJECT REHABILITATES 6,000 FEET OF RUNWAY 17/35 TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE GRAVEL SURFACE. THIS PROJECT REPLACES THE AIRPORT'S WIND CONE AND SEGMENTED CIRCLE THAT HAS REACHED THE END OF ITS USEFUL LIFE AND NO LONGER MEETS FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. . NON-14 CFR PART 139 CERTIFICATED AIRPORTS WERE NOT SUBJECTED TO THE RUNWAY SAFETY AREA DEADLINE OF DECEMBER 31, 2015 AND SOME AIRPORTS, INCLUDING THIS ONE, CONTINUE TO PURSUE FURTHER IMPROVEMENTS AS THEY BECOME FEASIBLE. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SAINT MARY'S, ALASKA.
Department of Transportation
$54.3M
PROJECT TITLE: GLENN HWY: S INNER SPRINGER LP TO W ARCTIC AVE :::: PROJECT DESCRIPTION: THIS PROJECT WILL RECONSTRUCT, WIDEN, AND ADD FRONTAGE ROADS TO THE GLENN HIGHWAY. IT ALSO INCLUDES ROADSIDE HARDWARE, UTILITIES, AND DRAINAGE, INTERSECTION, AND ADA IMPROVEMENTS. THIS PROJECT WILL CONSTRUCT THE FIRST PHASE OF THE GLENN HWY: MP 34-42 PARKS TO OLD GLENN PROJECT.
Department of Transportation
$53.2M
PROJECT TITLE: GLENN HWY: PARKS HWY TO S. INNER SPRINGER LP. (PHASE II) :::: PROJECT DESCRIPTION: THIS PROJECT WILL CONSTRUCT, WIDEN, AND ADD FRONTAGE ROADS TO THE GLENN HIGHWAY. IT ALSO INCLUDES ROADSIDE HARDWARE, UTILITIES, AND DRAINAGE, INTERSECTION, AND ADA IMPROVEMENTS. THIS PROJECT WILL CONSTRUCT THE SECOND PHASE OF THE GLENN HWY: MP 34-42 PARKS TO OLD GLENN PROJECT.
Department of Transportation
$46.3M
PURPOSE: RECONSTRUCT RUNWAY LIGHTING; RECONSTRUCT ACCESS ROAD; REHABILITATE APRON; REHABILITATE RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 5,300 FEET OF EXISTING AIRPORT ACCESS ROAD THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RECONSTRUCTS EXISTING RUNWAY 12/30 LIGHTING THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RECONSTRUCTS EXISTING RUNWAY 3/21 LIGHTING THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT REHABILITATES 2,660 FEET OF EXISTING GRAVEL RUNWAY 12/30 TO MAINTAIN THE STRUCTURAL INTEGRITY TO EXTEND ITS USEFUL LIFE. THIS PROJECT REHABILITATES 3,320 FEET OF EXISTING GRAVEL RUNWAY 3/21 TO MAINTAIN THE STRUCTURAL INTEGRITY TO EXTEND ITS USEFUL LIFE. THIS PROJECT REHABILITATES 9,900 SQUARE YARDS OF EXISTING MAIN APRON PAVEMENT TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE PAVEMENT. THIS GRANT FUNDS PHASE 1, WHICH CONSISTS OF 5,300 FEET OF EMBANKMENT RECONSTRUCTION. THIS GRANT FUNDS PHASE 1, WHICH CONSISTS OF RUNWAY 12/30 EMBANKMENT STABILIZATION AND REPAIR. THIS GRANT FUNDS PHASE 1, WHICH CONSISTS OF RUNWAY 3/21 EMBANKMENT STABILIZATION AND REPAIR. THIS GRANT FUNDS PHASE 1, WHICH CONSISTS OF APRON EMBANKMENT STABILIZATION AND REPAIR. THIS GRANT FUNDS PHASE 1, WHICH CONSISTS OF CONTRACTOR MOBILIZATION AND MATERIAL PROCUREMENT. THIS GRANT FUNDS PHASE 1, WHICH CONSISTS OF CONTRACTOR MOBILIZATION AND MATERIAL PROCUREMENT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH DEERING, ALASKA.
Department of Transportation
$45.6M
PURPOSE: CONSTRUCT NEW AIRPORT. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONSTRUCTS A NEW COMMERCIAL SERVICE AIRPORT THAT MEETS CURRENT FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. THIS PROJECT CONSTRUCTS A NEW REPLACEMENT COMMERCIAL SERVICE AIRPORT THAT MEETS CURRENT FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. THIS GRANT FUNDS PHASE 2 WHICH CONSISTS OF CONTRACTOR EQUIPMENT/MATERIAL MOBILIZATION. THIS GRANT FUNDS PHASE 1, WHICH CONSISTS OF DESIGN, MOBILIZATION, AND SITE PREPARATION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH NOATAK, ALASKA.
Environmental Protection Agency
$45.3M
DESCRIPTION:THIS AGREEMENT FUNDS A CAPITALIZATION GRANT, FUNDED BY THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58), FOR THE RECIPIENT'S CLEAN WATER STATE REVOLVING FUND PROGRAM. ACTIVITIES:THE RECIPIENTS OF THESE FUNDS PROVIDE LOW INTEREST FINANCING TO NUMEROUS SUBRECIPIENTS. SUBRECIPIENT:OF THIS GRANT AMOUNT, MINNESOTA PUBLIC FACILITIES AUTHORITY (PFA) WILL UTILIZE $45,279,000 AS LOANS (DA) AS PER MINNESOTA'S INTENDED USE PLAN. ASSISTANCE PROVIDED IN THE FORM OF LOANS WITHIN THE CLEAN WATER STATE REVOLVING FUND PROGRAM IS EXEMPT FROM 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUBAWARDS AS PROVIDED IN 2 CFR 1500. OF THIS LOAN FUNDING AMOUNT, PFA WILL UTILIZE $1,811,160 FOR PROGRAM ADMINISTRATION AND $905,580 FOR THE TECHNICAL ASSISTANCE SERVICES OUTLINED IN THE ATTACHED MINNESOTA POLLUTION CONTROL AGENCY (MPCA) TECHNICAL ASSISTANCE WORKPLAN AND INTENDED USE PLAN. THESE SERVICES WILL INCLUDE ACTIVITIES SUCH AS, BUT NOT LIMITED TO, CONTRACTED TECHNICAL AND ASSET MANAGEMENT ASSISTANCE, AND MPCA OUTREACH AND ASSISTANCE.OUTCOMES:ANTICIPATED DELIVERABLES INCLUDE FINANCING PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE WATER QUALITY IMPROVEMENT AND PROTECTION PROJECTS. THE EXPECTED OUTCOMES ARE TO IMPROVE AND PROTECT WATER QUALITY AND PUBLIC HEALTH. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE.
Department of Transportation
$44.5M
PROJECT TITLE: KENAI SPUR RD REHAB: SPORTS LAKE RD TO SWIRES RD PH 2 AK106 AK134 :::: PROJECT DESCRIPTION: THIS SECOND PHASE OF THE KENAI SPUR HIGHWAY PROJECT WILL CONSTRUCT A 5-LANE HIGHWAY BETWEEN SPORTS LAKE ROAD AND ROBIN DRIVE, AND INSTALL CONTINUOUS LIGHTING BETWEEN DELTA AVENUE AND DOLLY VARDEN STREET. THIS REHABILITATION MAY INCLUDE ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS, INTERSECTION IMPROVEMENTS, ADA IMPROVEMENTS, AND UTILITIES.
Department of Transportation
$43.9M
PURPOSE: INSTALL WILDLIFE PERIMETER FENCING; CONSTRUCT AIRPORT DRAINAGE/EROSION CONTROL. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONSTRUCTS NEW DRAINAGE CULVERTS AND INFIELD FILL TO MITIGATE PONDING TO BRING THE AIRPORT INTO CONFORMITY WITH CURRENT STANDARDS. THIS PROJECT INSTALLS 20,000 FEET OF WILDLIFE FENCING AND 9 GATES TO ENHANCE SAFETY. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH DEADHORSE, ALASKA.
Environmental Protection Agency
$43.3M
DESCRIPTION:SECTION 1452 OF THE SAFE DRINKING WATER ACT (SDWA) AUTHORIZES THE STATE TO UTILIZE FUNDS TO FURTHER THE HEALTH PROTECTION OBJECTIVES OF SDWA. THIS AGREEMENT WILL PROVIDE FUNDS TO CAPITALIZE THE RECIPIENT'S DWSRF WITH AN EMPHASIS ON LEAD SERVICE LINE REPLACEMENT AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES. AS PART OF THIS AGREEMENT, THE STATE ENSURES COMPLIANCE WITH FEDERAL AND STATE REGULATIONS, WHICH ARE DESIGNED TO PROTECT PUBLIC HEALTH.ACTIVITIES:SECTION 1452 OF THE SAFE DRINKING WATER ACT (SDWA) AUTHORIZES THE STATE TO UTILIZE FUNDS TO FURTHER THE HEALTH PROTECTION OBJECTIVES OF SDWA. THIS AGREEMENT WILL PROVIDE FUNDS TO CAPITALIZE THE RECIPIENT'S DWSRF WITH AN EMPHASIS ON LEAD SERVICE LINE REPLACEMENT AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES. AS PART OF THIS AGREEMENT, THE STATE ENSURES COMPLIANCE WITH FEDERAL AND STATE REGULATIONS, WHICH ARE DESIGNED TO PROTECT PUBLIC HEALTH.SUBRECIPIENT:DRINKING WATER STATE REVOLVING FUND PROGRAM IS EXEMPT FROM 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUBAWARDS AS PROVIDED IN 2 CFR 1500. PROGRAM PROVIDES ASSISTANCE IN THE FORM OF LOANS. MINNESOTA PUBLIC FACILITIES WILL FUND $36,351,840 TOWARD LOANS IN THEIR INTENDED USE PLAN (SITE PROJECT CODE DA), $1,731,040 FOR THE ADMINISTRATION SET-ASIDE (SITE PROJECT CODE DD), $865,520 FOR THE SMALL SYSTEMS TECHNICAL ASSISTANCE SET-ASIDE (SITE PROJECT CODE DE), AND $4,327,600 FOR THE LOCAL ASSISTANCE SET-ASIDE (SITE PROJECT CODE DG).OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S DWSRF WITH PRIMARY PURPOSE TO REDUCE LEAD IN DRINKING WATER BY FUNDING PROJECTS EMPHASIZING THE IDENTIFICATION AND REMOVAL OF LEAD SERVICE LINES. THE FUND MAY ALSO BE USED TO INCREASE TECHNICAL, FINANCIAL AND MANAGERIAL CAPACITY OF PUBLIC WATER SYSTEMS, AND PROVIDE ASSURANCE OF A CLEANER AND SAFER POTABLE WATER SUPPLY BY FUNDING IMPROVEMENTS TO MULTIPLE WATER INFRASTRUCTURE PROJECTS. THESE PUBLIC HEALTH BENEFITS WILL BE STATEWIDE.
Department of Transportation
$42.1M
PURPOSE: AMERICAN RESCUE PLAN ACT AWARDED AS ECONOMIC ASSISTANCE TO ELIGIBLE U.S. AIRPORTS AND ELIGIBLE CONCESSIONS AT THOSE AIRPORTS TO PREVENT, PREPARE FOR, AND RESPOND TO THE COVID-19 PANDEMIC. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS GRANT PROVIDES ECONOMIC RELIEF FUNDS FOR COSTS RELATED TO OPERATIONS, PERSONNEL, CLEANING, SANITIZATION, JANITORIAL SERVICES, DEBT SERVICE PAYMENTS, AND COMBATING THE SPREAD OF PATHOGENS AT THE AIRPORT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH ANCHORAGE, ALASKA.
Environmental Protection Agency
$41.8M
DESCRIPTION:THIS AGREEMENT FUNDS A CAPITALIZATION GRANT, FUNDED BY THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58), FOR THE RECIPIENT'S CLEAN WATER STATE REVOLVING FUND PROGRAM. ACTIVITIES:THE RECIPIENT OF THESE FUNDS PROVIDE LOW INTEREST FINANCING TO NUMEROUS SUBRECIPIENTS. SUBRECIPIENT:THE CLEAN WATER SRF PROGRAM IS EXEMPT FROM THE 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUB-AWARDS AS PROVIDED IN 2 CFR 1500. THE PROGRAM PROVIDES ASSISTANCE IN THE FORM OF LOANS. OF THIS GRANT AMOUNT, MINNESOTA PUBLIC FACILITIES AUTHORITY WILL FUND $40,963,627 IN LOANS AND $835,373 FOR TECHNICAL ASSISTANCE SERVICES AS OUTLINED IN THE ATTACHED MINNESOTA POLLUTION CONTROL AGENCY TECHNICAL ASSISTANCE WORKPLAN. THE TECHNICAL ASSISTANCE SERVICES WILL INCLUDE ACTIVITIES SUCH AS, BUT NOT LIMITED TO, ASSET MANAGEMENT ASSISTANCE, POLLUTANT SAMPLING, GIS SERVICES, TRAINING, AND OUTREACH.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE FINANCING, PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE WATER QUALITY IMPROVEMENT AND PROTECTION PROJECTS. THE EXPECTED OUTCOMES ARE TO IMPROVE AND PROTECT WATER QUALITY AND PUBLIC HEALTH. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE.
Environmental Protection Agency
$41.6M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE MINNESOTA PUBLIC FACILITIES AUTHORITY (MPFA). SAFE DRINKING WATER ACT (SDWA): SECTION 1452 AND INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) PL 117-58 AUTHORIZES THE STATE TO UTILIZE FUNDS TO FURTHER THE HEALTH PROTECTION OBJECTIVES OF SDWA. THIS AGREEMENT WILL PROVIDE FUNDS TO CAPITALIZE THE RECIPIENT'S DWSRF WITH AN EMPHASIS ON LEAD SERVICE LINE REPLACEMENT AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES. AS PART OF THIS AGREEMENT, THE STATE ENSURES COMPLIANCE WITH FEDERAL AND STATE REGULATIONS, WHICH ARE DESIGNED TO PROTECT PUBLIC HEALTH. THIS DWSRF BIL LEAD SERVICE LINE REPLACEMENT GRANT TOTALS $41,578,000. THIS INCLUDES $37,896,000 OF THE ORIGINAL ALLOCATION AND $3,682,000 OF REALLOTTED FY22 DWSRF BIL LEAD SERVICE LINE REPLACEMENT FUNDS.ACTIVITIES:THE STATE HAS SUBMITTED AN INTENDED USE PLAN (IUP) AS PART OF THE APPLICATION PACKAGE FOR THIS CAPITALIZATION GRANT. THIS AGREEMENT WILL PROVIDE FUNDS TO CAPITALIZE THE RECIPIENT'S DWSRF WITH AN EMPHASIS ON LEAD SERVICE LINE REPLACEMENT AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES. THIS IUP CONTAINS A LIST OF THE CAPITAL PROJECTS THAT MAY RECEIVE FUNDING FROM THIS GRANT AND A DESCRIPTION OF THE ELIGIBLE ACTIVITIES FUNDED BY THE SET-ASIDES. SUBRECIPIENT:DRINKING WATER STATE REVOLVING FUND PROGRAM IS EXEMPT FROM 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUBAWARDS AS PROVIDED IN 2 CFR 1500. PROGRAM PROVIDES ASSISTANCE IN THE FORM OF LOANS.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S DWSRF WITH AN EMPHASIS ON LEAD SERVICE LINE REPLACEMENT AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES. THE FUND CAN BE USED TO DEVELOP OR UPDATE LEAD SERVICE LINE INVENTORIES AND PROVIDE TECHNICAL ASSISTANCE TO SMALL WATER SYSTEMS UNDERTAKING LEAD SERVICE LINE INVENTORIES OR CONSTRUCTION PROJECTS. THESE PUBLIC HEALTH BENEFITS WILL BE STATEWIDE.
Department of Transportation
$41.5M
PURPOSE: RECONSTRUCT RUNWAY LIGHTING; REHABILITATE APRON; RECONSTRUCT TAXIWAY; RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 200 FEET OF THE EXISTING TAXIWAY PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RECONSTRUCTS 4,000 FEET OF RUNWAY 1/19 TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE PAVEMENT AND TO MINIMIZE FOREIGN OBJECT DEBRIS. THIS PROJECT RECONSTRUCTS THE EXISTING RUNWAY 1/19 LIGHTING SYSTEM THAT HAS REACHED THE END OF ITS USEFUL LIFE AND REQUIRES RECONSTRUCTION TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. THIS PROJECT REHABILITATES 13,333 SQUARE YARDS OF THE EXISTING MAIN APRON PAVEMENT TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE PAVEMENT AND TO MINIMIZE FOREIGN OBJECT DEBRIS. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH POINT HOPE, ALASKA.
Department of Transportation
$40.7M
PURPOSE: STRENGTHEN RUNWAY; RECONSTRUCT TAXIWAY; ACQUIRE SNOW REMOVAL EQUIPMENT; ACQUIRE OR REHABILITATE EMERGENCY GENERATOR; REHABILITATE TAXIWAY; RECONSTRUCT AIRFIELD GUIDANCE SIGNS; RECONSTRUCT OR REPLACE AIRPORT LIGHTING VAULT. THIS GRANT INCLUDES FUNDING BY THE AMERICAN RESCUE PLAN ACT OF 2021 TO INCREASE THE FEDERAL SHARE TO 100 PERCENT FOR THE AIRPORT IMPROVEMENT PROGRAM (AIP). ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT ACQUIRES A REPLACEMENT EMERGENCY GENERATOR TO ENSURE ELECTRICAL SERVICE TO THE AIRFIELD IN THE EVENT OF A POWER OUTAGE. THIS PROJECT ACQUIRES REPLACEMENT SNOW REMOVAL DOZER EQUIPMENT TO KEEP THE AIRPORT SERVICEABLE DURING SNOW PERIODS AND AID IN THE EFFICIENCY AND SAFETY OF OPERATIONS. THIS PROJECT RECONSTRUCTS 37 OF THE EXISTING AIRFIELD GUIDANCE SIGN FIXTURES TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. THIS PROJECT RECONSTRUCTS PAVEMENT FOR 379 FEET OF TAXIWAY A, 6,507 FEET OF TAXIWAY C, 547 FEET OF TAXIWAY D, AND 480 FEET OF TAXIWAY G TO ACCOMMODATE LARGER AIRCRAFT. THIS PROJECT RECONSTRUCTS THE EXISTING AIRPORT LIGHTING VAULT THAT HAS MET ITS USEFUL LIFE. THIS PROJECT REHABILITATES 275 FEET OF THE EXISTING TAXIWAY B TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE PAVEMENT AND TO MINIMIZE FOREIGN OBJECT DEBRIS. THIS PROJECT STRENGTHENS 5,120 FEET OF RUNWAY 1L/19R TO ACCOMMODATE A LARGER AIRCRAFT AND TO MEET FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH BETHEL, ALASKA.
Department of Transportation
$40.3M
PURPOSE: RECONSTRUCT RUNWAY LIGHTING; RECONSTRUCT TAXIWAY LIGHTING; REHABILITATE TAXIWAY; REHABILITATE APRON; RECONSTRUCT AIRPORT BEACON; CONSTRUCT/EXTEND/IMPROVE SAFETY AREA; REHABILITATE RUNWAY; EXPAND APRON. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONSTRUCTS THE RUNWAY 1/19 SAFETY AREA TO MEET STANDARDS AND ENHANCE THE SAFETY OF OPERATIONS AT THE AIRPORT. . THIS PROJECT EXPANDS THE EXISTING GENERAL AVIATION APRON AN ADDITIONAL 1,350 SQUARE YARDS TO MEET FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. THIS PROJECT RECONSTRUCTS THE TAXIWAY A LIGHTING SYSTEM THAT HAS REACHED THE END OF ITS USEFUL LIFE AND REQUIRES RECONSTRUCTION TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. . THIS PROJECT RECONSTRUCTS THE EXISTING RUNWAY 1/19 LIGHTING SYSTEM THAT HAS REACHED THE END OF ITS USEFUL LIFE AND REQUIRES RECONSTRUCTION TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. THIS PROJECT RECONSTRUCTS THE EXISTING AIRPORT ROTATING BEACON THAT HAS REACHED THE END OF ITS USEFUL LIFE. . THIS PROJECT REHABILITATES 2,400 FEET OF RUNWAY 1/19 TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE GRAVEL SURFACE. THIS PROJECT REHABILITATES 250 FEET OF THE EXISTING TAXIWAY A GRAVEL SURFACE THAT REQUIRES REHABILITATION TO ENSURE SAFE AIRFIELD OPERATIONS. THIS PROJECT REHABILITATES 3,184 SQUARE YARDS OF THE EXISTING MAIN APRON GRAVEL SURFACE TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE APRON AND TO MINIMIZE FOREIGN OBJECT DEBRIS. . NON-14 CFR PART 139 CERTIFICATED AIRPORTS WERE NOT SUBJECT TO THE RUNWAY SAFETY AREA DEADLINE OF DECEMBER 31, 2015 AND SOME AIRPORTS, INCLUDING THIS ONE, CONTINUE TO PURSUE FURTHER IMPROVEMENTS AS THEY BECOME FEASIBLE. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH KONGIGANAK, ALASKA.
Department of Transportation
$40.2M
PURPOSE: RECONSTRUCT RUNWAY LIGHTING; RECONSTRUCT TAXIWAY LIGHTING; REHABILITATE ACCESS ROAD; REHABILITATE APRON; REHABILITATE TAXIWAY; RECONSTRUCT AIRPORT BEACON; CONSTRUCT/EXTEND/IMPROVE SAFETY AREA; CONSTRUCT/REHABILITATE/MODIFY/EXPAND SNOW REMOVAL EQUIPMENT BUILDING; REHABILITATE RUNWAY; INSTALL MISCELLANEOUS NAVAIDS. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONSTRUCTS A 2,400 SQUARE FOOT SNOW REMOVAL EQUIPMENT BUILDING TO EXTEND THE LIFE OF THE EQUIPMENT BY PROTECTING IT FROM ADVERSE WEATHER CONDITIONS. . THIS PROJECT EXTENDS THE RUNWAY 6/24 SAFETY AREA TO 3,600 FEET TO MEET FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. THIS IMPROVEMENT WILL ENHANCE SAFETY AT THE AIRPORT. . THIS PROJECT RECONSTRUCTS THE TAXIWAY A LIGHTING SYSTEM THAT HAS REACHED THE END OF ITS USEFUL LIFE AND REQUIRES RECONSTRUCTION TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. . THIS PROJECT RECONSTRUCTS THE EXISTING RUNWAY 6/24 LIGHTING SYSTEM THAT HAS REACHED THE END OF ITS USEFUL LIFE AND REQUIRES RECONSTRUCTION TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. THIS PROJECT RECONSTRUCTS THE EXISTING AIRPORT ROTATING BEACON THAT HAS REACHED THE END OF ITS USEFUL LIFE. . THIS PROJECT REHABILITATES 10,325 FEET OF THE EXISTING AIRPORT ACCESS ROAD TO EXTEND ITS USEFUL LIFE. . THIS PROJECT REHABILITATES 203 FEET OF THE EXISTING TAXIWAY A GRAVEL SURFACE TO EXTEND ITS USEFUL LIFE. THIS PROJECT REHABILITATES 3,000 FEET OF RUNWAY 6/24 TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE GRAVEL SURFACE. THIS PROJECT REHABILITATES 7,400 SQUARE YARDS OF THE EXISTING MAIN APRON TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE GRAVEL SURFACE. . THIS PROJECT REPLACES THE AIRPORT'S WIND CONE AND SEGMENTED CIRCLE THAT HAVE REACHED THE END OF THEIR USEFUL LIVES AND NO LONGER MEET FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. . NON-14 CFR PART 139 CERTIFICATED AIRPORTS WERE NOT SUBJECTED TO THE RUNWAY SAFETY AREA DEADLINE OF DECEMBER 31, 2015 AND SOME AIRPORTS, INCLUDING THIS ONE, CONTINUE TO PURSUE FURTHER IMPROVEMENTS AS THEY BECOME FEASIBLE. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MEKORYUK, ALASKA.
Department of Transportation
$39.9M
PURPOSE: CONSTRUCT SERVICE ROAD; RECONSTRUCT TAXIWAY LIGHTING; RECONSTRUCT RUNWAY LIGHTING; REMOVE TAXIWAY; CONSTRUCT TAXIWAY; REHABILITATE TAXIWAY; REHABILITATE APRON; INSTALL TAXIWAY LIGHTING; EXPAND APRON; REHABILITATE RUNWAY; INSTALL MISCELLANEOUS NAVAIDS; OBSTRUCTION MARKING/LIGHTING/REMOVAL [NON-HAZARD]. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONSTRUCTS A 1,525 FOOT SERVICE ROAD TO ENABLE THE SAFE MOVEMENT OF VEHICLES AND GROUND SERVICE EQUIPMENT. . THIS PROJECT CONSTRUCTS A 298 FOOT TAXIWAY G TO ELIMINATE THE NEED FOR AIRCRAFT TO BACK-TAXI ON THE RUNWAY. THIS PROJECT EXPANDS THE EXISTING GENERAL AVIATION APRON AN ADDITIONAL 10,435 SQUARE YARDS TO MEET FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. THIS PROJECT INSTALLS A NEW TAXIWAY G LIGHTING SYSTEM TO ENHANCE SAFE AIRFIELD OPERATIONS DURING LOW VISIBILITY CONDITIONS. THIS PROJECT RECONSTRUCTS THE TAXIWAY A AND B LIGHTING SYSTEM THAT HAS REACHED THE END OF ITS USEFUL LIFE AND REQUIRES RECONSTRUCTION TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. . THIS PROJECT RECONSTRUCTS THE EXISTING RUNWAY 4/22 LIGHTING SYSTEM THAT HAS REACHED THE END OF ITS USEFUL LIFE AND REQUIRES RECONSTRUCTION TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. THIS PROJECT REHABILITATES 35,436 SQUARE YARDS OF THE EXISTING GENERAL AVIATION APRON PAVEMENT TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE PAVEMENT AND TO MINIMIZE FOREIGN OBJECT DEBRIS. . THIS PROJECT REHABILITATES 376 FEET OF THE EXISTING TAXIWAY A, 620 FEET OF THE EXISTING TAXIWAY B, AND 298 FEET OF THE EXISTING TAXIWAY D PAVEMENT TO EXTEND ITS USEFUL LIFE. THIS PROJECT REHABILITATES 7,301 FEET OF RUNWAY 4/22 TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE PAVEMENT AND TO MINIMIZE FOREIGN OBJECT DEBRIS. THIS PROJECT REMOVES 1,525 FEET OF TAXIWAY D FROM THE AIRFIELD TO MEET FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. . THIS PROJECT REMOVES A NON-HAZARD PART 77 OBSTRUCTION TO MEET FEDERAL AVIATION ADMINISTRATION STANDARDS. . THIS PROJECT REPLACES THE AIRPORT'S WIND CONE THAT HAS REACHED THE END OF ITS USEFUL LIFE AND NO LONGER MEETS FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. . THIS PHASE OF THE PROJECT INSTALLS A REPLACEMENT RUNWAY 4/22 PRECISION APPROACH PATH INDICATOR SYSTEM AND APPROACH LIGHTING SYSTEM THRESHOLD BAR AT THIS COMMERCIAL SERVICE AIRPORT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH HOMER, ALASKA.
Department of Transportation
$39.9M
PURPOSE: REMOVE TAXIWAY; INSTALL TAXIWAY LIGHTING; WIDEN TAXIWAY; EXTEND TAXIWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXTENDS TAXIWAY R AN ADDITIONAL 475 FEET TO MEET THE OPERATIONAL NEEDS OF THE AIRPORT. THIS PROJECT EXTENDS TAXIWAY Z AN ADDITIONAL 400 FEET TO MEET THE OPERATIONAL NEEDS OF THE AIRPORT. THIS PROJECT INSTALLS A NEW TAXIWAY E LIGHTING SYSTEM TO ENHANCE SAFE AIRFIELD OPERATIONS DURING LOW VISIBILITY CONDITIONS. THIS PROJECT INSTALLS A NEW TAXIWAY R LIGHTING SYSTEM TO ENHANCE SAFE AIRFIELD OPERATIONS DURING LOW VISIBILITY CONDITIONS. THIS PROJECT REMOVES 475 FEET OF TAXIWAY Z FROM THE AIRPORT'S AIRFIELD DUE TO GEOMETRIC IMPROVEMENTS. THIS PROJECT WIDENS TAXIWAY E AN ADDITIONAL 15 FEET DUE TO A CHANGE IN THE CRITICAL DESIGN AIRCRAFT USING THIS PORTION OF THE AIRPORT. . THIS PROJECT WIDENS TAXIWAY Z AN ADDITIONAL 25 FEET DUE TO A CHANGE IN THE CRITICAL DESIGN AIRCRAFT USING THE AIRPORT. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH ANCHORAGE, ALASKA.
Department of Transportation
$39.8M
PROJECT TITLE: AMHS FHWA OPERATING - CRRSAA FUNDING :::: PROJECT DESCRIPTION: ALASKA MARINE HIGHWAY SYSTEM OPERATING EXPENDITURES; FEDERAL RECEIPTS RECEIVED FROM THE FEDERAL HIGHWAY ADMINISTRATION AS A RESULT OF THE CORONAVIRUS RESPONSE AND RELIEF SUPPLEMENTAL APPOPRIATIONS ACT, 2021.PROJECT IS AUTHORIZED CONSISTENT WITH 2 CFR 200, SPECIAL AUTHORITY COSTS STATUTORILY ELIGIBLE FOR REIMBURSEMENT UNDER THE HIP-CRRSAA AUTHORIZED BY CONGRESS IN 12/2020. THESE FUNDS WILL SUPPORT SYSTEM OPERATIONS TO PROVIDE SAFE, SECURE, RELIABLE, AND EFFICIENT TRANSPORTATION OF PEOPLE, GOODS, AND VEHICLES THROUGHOUT ALASKA AND CONNECT THE STATE TO CANADA AND THE LOWER 48. BOTH VESSEL AND SHORESIDE OPERATING EXPENDITURES WILL BE SUPPORTED WITH THIS FUNDING.
Department of Transportation
$39.7M
PROJECT TITLE: AMHS FHWA CRRSAA FUNDING - LOST REVENUE :::: PROJECT DESCRIPTION: ALASKA MARINE HIGHWAY SYSTEM REPLACEMENT OF LOST REVENUES; FEDERAL RECEIPTS RECEIVED FROM THE FEDERAL HIGHWAY ADMINISTRATION AS A RESULT OF THE CORONAVIRUS RESPONSE AND RELIEF SUPPLEMENTAL APPROPRIATIONS ACT, 2021. PROJECT IS AUTHORIZED CONSISTENT WITH 2 CFR 200, SPECIAL AUTHORITY COSTS STATUTORILY ELIGIBLE FOR REIMBURSEMENT UNDER THE HIP-CRRSAA AUTHORIZED BY CONGRESS IN 12/2020. THESE FUNDS WILL REPLACE SYSTEM-WIDE LOST REVENUES DUE TO THE COVID-19 PANDEMIC.
Department of Transportation
$38.9M
PROJECT TITLE: RICHARDSON HIGHWAY MP 148-173 :::: PROJECT DESCRIPTION: CLARIFICATION 07/2018: RECONSTRUCT THE RICHARDSON HIGHWAY BETWEEN MP 148 AND 173, AND CONSTRUCT BRIDGE #0576. PROJECT WILL INCLUDE BRIDGE WORK, ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATIONS.
Department of Transportation
$38.8M
PROJECT TITLE: KNIK-GOOSE BAY ROAD RECONSTRUCTION, PHASE 1 - FAIRVIEW LOOP TO CENTAUR AVENUE :::: PROJECT DESCRIPTION: PROJECT CONSISTS OF RECONSTRUCTING KNIK GOOSE BAY ROAD TO A DIVIDED 4 LANE FACILITY FROM CENTAUR AVENUE (NEAR PALMER-WASILLA HWY) TO FAIRVIEW LOOP. SCOPE INCLUDES: RECONSTRUCTION OF KGB, NEW BRIDGE OVER COTTONWOOD CREEK, ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS, INTERSECTION IMPROVEMENTS, ADA IMPROVEMENTS AND UTILITIES. THIS CHILD PROJECT WILL CONSTRUCT THE FIRST PHASE OF IMPROVEMENTS INCLUDED IN THE PARENT PROJECT: Z524640000.
Department of Transportation
$38.7M
PURPOSE: RECONSTRUCT TAXIWAY LIGHTING; REHABILITATE TAXILANE. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS THE EXISTING LIGHTING ON TAXILANES E AND M THAT HAVE REACHED THE END OF THEIR USEFUL LIVES. THIS PROJECT REHABILITATES 2,783 FEET OF THE EXISTING TAXILANE E PAVEMENT TO EXTEND ITS USEFUL LIFE. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH ANCHORAGE, ALASKA.
Environmental Protection Agency
$38.3M
DESCRIPTION:THE PURPOSE OF THIS AGREEMENT IS FOR A CAPITALIZATION GRANT, FUNDED BY THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58), WHICH PROVIDES FUNDS FOR THE RECIPIENT'S CLEAN WATER STATE REVOLVING FUND (CWSRF) PROGRAM. ACTIVITIES:THE ACTIVITIES ARE TO PROVIDE LOW INTEREST FINANCING TO NUMEROUS SUBRECIPIENTS FOR COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE WATER QUALITY IMPROVEMENT AND PROTECTION PROJECTS.SUBRECIPIENT:CLEAN WATER STATE REVOLVING FUND PROGRAM IS EXEMPT FROM 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUBAWARDS AS PROVIDED IN 2 CFR 1500. PROGRAM PROVIDES ASSISTANCE IN THE FORM OF LOANS.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S CWSRF. THE EXPECTED OUTCOMES ARE TO ESTABLISH AND MANAGE AN EFFECTIVE COMPREHENSIVE CWSRF PROGRAM AND TO MAINTAIN A SELF-SUSTAINING REVOLVING FUND TO IMPROVE AND PROTECT WATER QUALITY AND PUBLIC HEALTH FOR CITIZENS THROUGHOUT THE STATE.
Department of Transportation
$38.1M
PROJECT TITLE: HNS HWY RECONSTRUCTION MILEPOST 12.2-23.0 :::: PROJECT DESCRIPTION: PROJECT CONSISTS OF RECONSTRUCTION OF THE HAINES HIGHWAY FROM MILEPOST 12 TO MILEPOST 20. WORK INCLUDES REALIGNMENT AT SOME LOCATIONS, WIDENING OF SHOULDERS, GRADING, PAVING AND DRAINAGE IMPROVEMENTS.
Department of Transportation
$38M
PROJECT TITLE: PARKS HWY MP 315-325 RECONSTRUCTION :::: PROJECT DESCRIPTION: REV 03/2020: RECONSTRUCT THE PARKS HIGHWAY FROM MILEPOST 319 TO MILEPOST 325 (FNSB BOUNDARY), INCLUDING REPLACEMENT OF LITTLE GOLDSTREAM CREEK BRIDGE NO. 678 AT MILEPOST 315. PROJECT WILL INCLUDE BRIDGE WORK, ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS AND UTILITIES.REV 04/2018: PARKS HIGHWAY, NEAR NENANA.
Department of Transportation
$37.9M
PURPOSE: RECONSTRUCT RUNWAY LIGHTING; RECONSTRUCT TAXIWAY LIGHTING; REHABILITATE ACCESS ROAD; INSTALL WIND CONE/SEGMENTED CIRCLE; RECONSTRUCT AIRPORT ROTATING BEACON; RECONSTRUCT TAXIWAY; REHABILITATE APRON; RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT ACQUIRES AND INSTALLS A NEW WIND CONE AND SEGMENTED CIRCLE NAVIGATIONAL AIDS TO PROVIDE PILOTS WITH CRITICAL AIRFIELD INFORMATION. THIS PROJECT RECONSTRUCTS 220 FEET OF EXISTING GRAVEL TAXIWAY A PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RECONSTRUCTS 3,300 FEET OF EXISTING GRAVEL RUNWAY 04/22 THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RECONSTRUCTS EXISTING RUNWAY 04/22 LIGHTING THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RECONSTRUCTS EXISTING TAXIWAY A LIGHTING THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT REHABILITATES 11,675 SQUARE YARDS OF EXISTING MAIN APRON PAVEMENT TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE PAVEMENT. THIS PROJECT REHABILITATES 5,275 FEET OF EXISTING AIRPORT ACCESS ROAD TO EXTEND ITS USEFUL LIFE. THIS PROJECT REPLACES 1 EXISTING AIRPORT ROTATING BEACON THAT HAS REACHED THE END OF ITS USEFUL LIFE. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH TAKOTNA, ALASKA.
Environmental Protection Agency
$37.7M
DESCRIPTION:THIS AGREEMENT PROVIDES A CAPITALIZATION GRANT, FUNDED BY THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58), FOR THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF) PROGRAM. THE AWARD FURTHERS THE PUBLIC HEALTH PROTECTION OBJECTIVES OF THE SAFE DRINKING WATER ACT (SDWA). ACTIVITIES:THE RECIPIENT OF THESE FUNDS WILL PROVIDE LOW-INTEREST RATE FINANCING TO ELIGIBLE PUBLIC WATER SYSTEMS FOR THE COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE DRINKING WATER IMPROVEMENT PROJECTS. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC SET-ASIDES, INCLUDING BUT NOT LIMITED TO PROVIDING TECHNICAL ASSISTANCE TO SMALL SYSTEMS, FOR OPERATOR CERTIFICATION ACTIVITIES, AND SOURCE WATER PROTECTION ACTIVITIES. SUBRECIPIENT:OF THIS GRANT AMOUNT, THE MINNESOTA PUBLIC FACILITIES AUTHORITY (PFA) WILL UTILIZE $25,987,470 AS LOANS (DA) AS PER MINNESOTA'S INTENDED USE PLAN. ASSISTANCE PROVIDED IN THE FORM OF LOANS WITHIN THE DWSRF PROGRAM IS EXEMPT FROM 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUBAWARDS AS PROVIDED IN 2 CFR 1500. PFA WILL USE $1,506,520 IN PROGRAM ADMINISTRATION (DD) SET-ASIDE FUNDING FOR MINNESOTA DEPARTMENT OF HEALTH (MDH) AND PFA DWSRF STAFF; $3,766,300 IN PROGRAM MANAGEMENT (DF) SET-ASIDE FUNDING FOR MDH DRINKING WATER STAFF; $5,649,450 IN LOCAL ASSISTANCE (DG) SET-ASIDE FUNDING THAT INCLUDES $1,883,150 FOR A SYSTEM RELIABILITY GRANT PROGRAM AND $3,766,300 WELLHEAD PROTECTION MDH STAFF; AND $753,260 IN SMALL SYSTEMS (DE) SET-ASIDE FUNDING FOR MDH STAFF AND CONTRACTOR SUPPORT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE FINANCING, PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE PUBLIC HEALTH-RELATED PROJECTS. DELIVERABLES WILL ALSO BE USED TO INCREASE THE TECHNICAL, MANAGERIAL, AND FINANCIAL CAPACITY OF PUBLIC WATER SYSTEMS. THE EXPECTED OUTCOME IS PUBLIC HEALTH PROTECTION. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE.
Environmental Protection Agency
$37.4M
THIS AGREEMENT PROVIDES FUNDING UNDER THE CLEAN WATER ACT TO THE STATE OF MINNESOTA TO CAPITALIZE ITS REVOLVING LOAN FUND FOR THE FINANCING FOR THE C
Department of Transportation
$36.1M
PROJECT TITLE: RICHARDSON HIGHWAY MILEPOST 346 CHENA BRIDGE REPLACEMENT :::: PROJECT DESCRIPTION: REVISED 07/2023 :REPLACE THE NORTHBOUND CHENA FLOOD CONTROL BRIDGE #1364 AND THE SOUTHBOUND CHENA FLOOD CONTROL BRIDGE #1866 ON THE RICHARDSON HIGHWAY AT MP 346. PROJECT WILL INCLUDE DRAINAGE IMPROVEMENTS, ROADSIDE HARDWARE, AND UTILITIES.
Department of Transportation
$36.1M
SEWARD HIGHWAY: DOWLING TO TUDOR RECONSTRUCTION; 05/2011 REVISE SCOPE: REMOVE BRIDGES OVER DOWLING RD & INT AIRPORT RD
Department of Transportation
$35.6M
PROJECT TITLE: STERLING HWY MILEPOST 45-60: JUNEAU CREEK BRIDGE :::: PROJECT DESCRIPTION: THIS PROJECTWILL CONSTRUCT THE JUNEAU CREEK BRIDGE, BRIDGE NO. 1818, AND ASSOCIATEDFEATURES, ON THE STERLING HWY. MILEPOST 45-60 PROJECT'S NEW ALIGNMENT. THIS ISSTAGE 2 OF THE PROJECT AND IS A CHILD PROJECT OF THE OVERALL PARENT PROJECTEFFORT. THIS PROJECT IMPLEMENTS SECTION 1303 OF THEMOVING AHEAD FOR PROGRESS IN THE 21ST CENTURY ACT (MAP-21) AUTHORIZING THE USEOF THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) CONTRACTING METHOD.DESIGN WAS COMPLETED UNDER PARENT PROJECT, 0212015/53014 STERLING HIGHWAYMILEPOST 44.5 TO 58 (MILEPOINT 7.6 TO 22), SUNRISE INN TO SKILAK LAKE ROADRECONSTRUCTION.
Department of Transportation
$35.4M
PROJECT TITLE: DALTON HWY MP 362-414 RECONSTRUCTION (MP 362-414 CONST) :::: PROJECT DESCRIPTION: CLARIFICATION 02/2019: RECONSTRUCTION INCLUDING WIDENING, SPOT REPAIR, AND RESURFACING OF 52 MILES OF THE DALTON HIGHWAY NEAR DEADHORSE. WORK INCLUDES ROADSIDE HARDWARE AND DRAINAGE IMPROVEMENTS.
Source: Federal Audit Clearinghouse (fac.gov)
Federal audit data is temporarily unavailable.
Single audits are required for entities expending $750,000+ in federal awards annually.
Tax Year 2024 · Source: IRS e-Filed Form 990
Individuals serving as officers, directors, or trustees of the organization.
| Name | Title | Hrs/Wk | Compensation | Related Orgs | Other |
|---|
Source: IRS Publication 78, Auto-Revocation List & e-Postcard Data
Tax-deductible contributions: Yes
Deductibility code: PC
Sources: IRS e-Filed Form 990 (XML) & ProPublica Nonprofit Explorer
Scroll →
| Year | Revenue | Contributions | Expenses | Assets | Net Assets |
|---|---|---|---|---|---|
| 2024 | $217.4K | $0 | $273.3K | $2.2M | $2.1M |
| 2023IRS e-File | $217.4K | $0 | $273.3K | $2.2M | $2.1M |
| 2022 | $536.9K | $0 | $278.1K | $2.2M | $2.1M |
| 2021 | $265.3K | $25K | $243.8K |
Sources: ProPublica Nonprofit Explorer & IRS e-File Index
Financial data: IRS e-Filed Form 990 (Tax Year 2023)
Leadership & compensation: IRS e-Filed Form 990, Part VII (Tax Year 2024)
Federal grants: USAspending.gov (live)
Organization info: IRS Business Master File
Tax-deductibility: IRS Publication 78
| Total |
|---|
| Curt Paterson | Board Member | 1 | $250 | $0 | $0 | $250 |
Curt Paterson
Board Member
$250
Hrs/Wk
1
Compensation
$250
Related Orgs
$0
Other
$0
Members of the governing board. Board members often serve without compensation.
| Name | Title | Hrs/Wk | Compensation | Related Orgs | Other | Total |
|---|---|---|---|---|---|---|
| Benjamin Willey | Secretary/tr | 1 | $2,850 | $0 | $0 | $2,850 |
| Doug Plourde | Vice Preside | 1 | $2,650 | $0 | $0 | $2,650 |
| Joey Bard | Board Member | 1 | $1,250 | $0 | $0 | $1,250 |
| Nathan Grass | Former Sec/t | 2 | $4,050 | $0 | $0 | $4,050 |
| Todd Pelletier | President | 1 | $2,650 | $0 | $0 | $2,650 |
Benjamin Willey
Secretary/tr
$2,850
Hrs/Wk
1
Compensation
$2,850
Related Orgs
$0
Other
$0
Doug Plourde
Vice Preside
$2,650
Hrs/Wk
1
Compensation
$2,650
Related Orgs
$0
Other
$0
Joey Bard
Board Member
$1,250
Hrs/Wk
1
Compensation
$1,250
Related Orgs
$0
Other
$0
| $2.7M |
| $1.9M |
| 2020 | $260.3K | $0 | $225.9K | $2.7M | $1.8M |
| 2019 | $262K | $0 | $216.5K | $2.8M | $1.8M |
| 2018 | $274.9K | $50K | $205.3K | $2.8M | $1.8M |
| 2017 | $21.8K | $0 | $196.6K | $2.8M | $1.7M |
| 2016 | $291.7K | $27K | $190.7K | $3.1M | $1.9M |
| 2015 | $248.7K | $0 | $209.7K | $3.1M | $1.8M |
| 2014 | $268.6K | $0 | $255.6K | $3.2M | $1.8M |
| 2013 | $238.1K | $0 | $197K | $3.4M | $1.8M |
| 2012 | $226.8K | $0 | $222.5K | $3.5M | $1.8M |
| 2011 | $142.1K | $0 | $174.9K | $3.6M | $1.7M |
| 2022 | 990 | DataIRS e-File |
| 2021 | 990 | Data |
| 2020 | 990 | Data |
| 2019 | 990 | Data |
| 2018 | 990 | Data |
| 2017 | 990 | Data |
| 2016 | 990 | Data |
| 2015 | 990 | Data |
| 2014 | 990 | Data |
| 2013 | 990 | Data |
| 2012 | 990 | Data |
| 2011 | 990 | Data |
| 2010 | 990 | — |
| 2009 | 990 | — |
| 2008 | 990 | — |
| 2007 | 990 | — |
| 2006 | 990 | — |
| 2005 | 990 | — |
| 2004 | 990 | — |
| 2003 | 990 | — |
| 2002 | 990 | — |
| 2001 | 990 | — |
Nathan Grass
Former Sec/t
$4,050
Hrs/Wk
2
Compensation
$4,050
Related Orgs
$0
Other
$0
Todd Pelletier
President
$2,650
Hrs/Wk
1
Compensation
$2,650
Related Orgs
$0
Other
$0