Loading organization details...
Loading organization details...
Source: IRS Form 990 via ProPublica Nonprofit Explorer
Total Revenue
▼$74.3K
Total Contributions
N/A
Total Expenses
▼$31.4K
Total Assets
$371.8K
Total Liabilities
▼$0
Net Assets
N/A
Officer Compensation
→N/A
Other Salaries
N/A
Investment Income
▼N/A
Fundraising
▼N/A
Source: USAspending.gov · Searched by organization name
Total Federal Funding
$990.4K
Awards Found
1
| Awarding Agency | Description | Amount | Fiscal Year | Period |
|---|---|---|---|---|
| Department of the Interior | THIS PROJECT WILL PROVIDE HIGH-VALUE WETLAND HABITAT FOR MIGRATING WATERFOWL, SHOREBIRDS, AND RESIDENT BIRDS AT A SITE THAT IS BOTH ACCESSIBLE AND OPEN TO THE PUBLIC FOR BIRDWATCHING AND OTHER WILDLIFE VIEWING. IN ADDITION, CREATION OF A DEEPER WETLAND IN THE NORTH POND WILL PROVIDE MUCH NEEDED NURSERY HABITAT FOR THE COLORADO RIVERS NATIVE ENDEMIC FISH.PHASES 2 INCLUDES THE FOLLOWING TASKS: FILL THE NORTHERN PORTION OF TRAYLOR POND TO CREATE TWO ACRES OF SHALLOW WETLAND HABITAT INSTALL A PERMANENT WATER CONTROL STRUCTURE TO SEPARATE NORTHERN AND SOUTHERN PORTIONS OF TRAYLOR POND FOR WATER MANIPULATION ON THE PORTION OWNED BY GVASINSTALL A PERMANENT WATER CONTROL STRUCTURE TO SEPARATE OSPREY AND TRAYLOR PONDS TO ALLOW FOR BETTER WATER LEVEL CONTROLINSTALL WATER CONVEYANCE INFRASTRUCTURE SO THAT WATER FROM REDLANDS TAILRACE CANAL CAN BE MOVED INTO TRAYLOR AND AVOCET PONDS AS DESIREDINSTALL WATER CONVEYANCE INFRASTRUCTURE TO BRING WATER FROM REDLAND TAILRACE CANAL UNDER DIKE ROAD AND INTO NORTH POND TO AUGMENT WATER LEVELS WHEN LEVELS IN THE COLORADO RIVER ARE LOW AND CONNECTION TO THE RIVER IS LOST. PHASE 3 WILL IMPROVE NATIVE FISH HABITAT THROUGH THE FOLLOWING ACTIONS: REENGINEERING RIVERBANK CUT CONNECTING NORTH POND TO COLORADO RIVER FURTHER DOWNSTREAM TO REDUCE SEDIMENTATION AND MORE EFFECTIVELY CATCH NATIVE FISH FRY INSTALLING A WATER CONTROL STRUCTURE AT THIS NEW CUT TO CONTROL INFLOW AND OUTFLOW AS WELL AS SCREEN FISH MOVING IN AND OUT OF THE POND. | $990.4K | FY2023 | Jun 2023 – Dec 2025 |
Department of the Interior
$990.4K
THIS PROJECT WILL PROVIDE HIGH-VALUE WETLAND HABITAT FOR MIGRATING WATERFOWL, SHOREBIRDS, AND RESIDENT BIRDS AT A SITE THAT IS BOTH ACCESSIBLE AND OPEN TO THE PUBLIC FOR BIRDWATCHING AND OTHER WILDLIFE VIEWING. IN ADDITION, CREATION OF A DEEPER WETLAND IN THE NORTH POND WILL PROVIDE MUCH NEEDED NURSERY HABITAT FOR THE COLORADO RIVERS NATIVE ENDEMIC FISH.PHASES 2 INCLUDES THE FOLLOWING TASKS: FILL THE NORTHERN PORTION OF TRAYLOR POND TO CREATE TWO ACRES OF SHALLOW WETLAND HABITAT INSTALL A PERMANENT WATER CONTROL STRUCTURE TO SEPARATE NORTHERN AND SOUTHERN PORTIONS OF TRAYLOR POND FOR WATER MANIPULATION ON THE PORTION OWNED BY GVASINSTALL A PERMANENT WATER CONTROL STRUCTURE TO SEPARATE OSPREY AND TRAYLOR PONDS TO ALLOW FOR BETTER WATER LEVEL CONTROLINSTALL WATER CONVEYANCE INFRASTRUCTURE SO THAT WATER FROM REDLANDS TAILRACE CANAL CAN BE MOVED INTO TRAYLOR AND AVOCET PONDS AS DESIREDINSTALL WATER CONVEYANCE INFRASTRUCTURE TO BRING WATER FROM REDLAND TAILRACE CANAL UNDER DIKE ROAD AND INTO NORTH POND TO AUGMENT WATER LEVELS WHEN LEVELS IN THE COLORADO RIVER ARE LOW AND CONNECTION TO THE RIVER IS LOST. PHASE 3 WILL IMPROVE NATIVE FISH HABITAT THROUGH THE FOLLOWING ACTIONS: REENGINEERING RIVERBANK CUT CONNECTING NORTH POND TO COLORADO RIVER FURTHER DOWNSTREAM TO REDUCE SEDIMENTATION AND MORE EFFECTIVELY CATCH NATIVE FISH FRY INSTALLING A WATER CONTROL STRUCTURE AT THIS NEW CUT TO CONTROL INFLOW AND OUTFLOW AS WELL AS SCREEN FISH MOVING IN AND OUT OF THE POND.
Source: Federal Audit Clearinghouse (fac.gov)
No federal single audit records found for this organization.
Single audits are required for entities expending $750,000+ in federal awards annually.
Source: IRS e-Filed Form 990
No officer or director compensation data available for this organization.
This data is sourced from IRS Form 990, Part VII. It may not be available if the organization files Form 990-N (e-Postcard) or has not yet been enriched.
Source: IRS Publication 78, Auto-Revocation List & e-Postcard Data
Tax-deductible contributions: Yes
Deductibility code: PC
990-N (e-Postcard) Filing History
This organization files simplified Form 990-N (annual gross receipts ≤ $50,000).
Sources: IRS e-Filed Form 990 (XML) & ProPublica Nonprofit Explorer
Scroll →
| Year | Revenue | Contributions | Expenses | Assets | Net Assets |
|---|---|---|---|---|---|
| 2024 | $74.3K | — | $31.4K | $371.8K | — |
| 2023 | $42.9K | — | $54.4K | $323.8K | — |
| 2022 | $32.7K | — | $33.3K | $347.1K | — |
| 2021 | $51.1K | — | $120.9K | $337.7K | — |
Sources: ProPublica Nonprofit Explorer & IRS e-File Index
| Tax Year | Form Type | Source | Documents |
|---|---|---|---|
| 2025 | 990-EZ | IRS e-File | PDF not yet published by IRSView Filing → |
| 2024 | 990-EZ | DataIRS e-File | PDF not yet published by IRSView Filing → |
| 2023 | 990-EZ | DataIRS e-File |
Financial data: IRS Form 990 via ProPublica Nonprofit Explorer (Tax Year 2024)
Federal grants: USAspending.gov (live)
Organization info: IRS Business Master File · ProPublica Nonprofit Explorer
Tax-deductibility: IRS Publication 78
| 2020 | $44.4K | — | $29.2K | $403.1K | — |
| 2019 | $30.1K | — | $32.1K | $377.6K | — |
| 2018 | $56.7K | — | $40.7K | $386.4K | — |
| 2017 | $33.5K | — | $23.6K | $365.6K | — |
| 2016 | $22.7K | — | $27.3K | $353K | — |
| 2015 | $3,747 | — | $6,678 | $363.6K | — |
| 2014 | $32.3K | — | $20K | $366.6K | — |
| 2013 | $26.1K | — | $29.2K | $356.3K | — |
| 2012 | $23K | — | $31.2K | $359K | — |
| 2022 | 990-EZ | Data |
| 2021 | 990-EZ | Data | PDF not yet published by IRS |
| 2020 | 990-EZ | Data |
| 2019 | 990-EZ | Data |
| 2018 | 990-EZ | Data |
| 2017 | 990-EZ | Data |
| 2016 | 990-EZ | Data |
| 2015 | 990-EZ | Data |
| 2014 | 990-EZ | Data |
| 2013 | 990-EZ | Data |
| 2012 | 990-EZ | Data |
| 2011 | 990-EZ | — |
| 2010 | 990-EZ | — |
| 2009 | 990-EZ | — |
| 2008 | 990 | — |
| 2007 | 990 | — |
| 2006 | 990 | — |
| 2005 | 990 | — |
| 2004 | 990-EZ | — |
| 2003 | 990-EZ | — |