Loading organization details...
Loading organization details...
Source: USAspending.gov · Searched by organization name
VA/DoD Awards
$15.6M
VA/DoD Award Count
5
Funding from the Department of Veterans Affairs and/or Department of Defense.
Total Federal Funding (partial)
$7.5B
Awards Found
150+
Additional awards may exist. View all on USAspending.gov →
Department of Transportation
$3.8B
THE PURPOSE OF THIS AWARD IS TO FUND A FY 2022-2023 FEDERAL STATE PARTNERSHIP NORTHEAST CORRIDOR PROGRAM GRANT FOR THE HUDSON TUNNEL PROJECT (THE PROJECT OR HTP) TO HELP ACHIEVE THE GOALS IDENTIFIED IN THE NOTICE OF FUNDING OPPORTUNITY FOR PROJECTS LOCATED ON THE NORTHEAST CORRIDOR FOR THE FEDERAL-STATE PARTNERSHIP FOR INTERCITY PASSENGER RAIL GRANTS PROGRAM, 87 FED. REG. 79421, DECEMBER 27, 2022 THAT SOLICITED APPLICATIONS FOR FEDERAL FINANCIAL ASSISTANCE. THE FSP-NEC PROJECT CONSISTS OF THREE ELEMENTS: 1) THE CONSTRUCTION OF A NEW HUDSON RIVER TUNNEL BETWEEN NEW YORK AND NEW JERSEY 2) THE REHABILITATION OF THE EXISTING NORTH RIVER TUNNEL UNDER THE HUDSON RIVER AND 3) LONG ISLAND RAIL ROAD (LIRR) EMERGENCY SERVICES BUILDING (ESB) UTILITY RELOCATION EARLY WORK ASSOCIATED WITH THE SEPARATELY FUNDED HUDSON YARDS CONCRETE CASING SECTION THREE (3) PROJECT. DELIVERABLES FOR THE PROJECT INCLUDE A PROJECT MANAGEMENT PLAN (PMP), FINAL DESIGN SET(S), A REAL ESTATE ACQUISITION MANAGEMENT PLAN (RAMP), CONTRACTOR PROPOSALS AND EXECUTED CONTRACTS, CONTRACTOR BUY AMERICA CERTIFICATION, AND A CONTRACTOR SAFETY PLAN.THE INTENDED BENEFICIARY AS A RESULT OF THIS PROJECT IS THE NATIONAL RAILROAD PASSENGER CORPORATION (AMTRAK).
Department of Transportation
$2.2B
APPLICATION PURPOSE: THE PURPOSE IS TO CONSTRUCT THE HUDSON TUNNEL PROJECT (HTP).; ACTIVITIES PERFORMED: THE HTP INCLUDES THREE ELEMENTS: 1) THE CONSTRUCTION OF A NEW HUDSON RIVER TUNNEL BETWEEN NEW YORK AND NEW JERSEY; 2) THE REHABILITATION OF THE EXISTING NORTH RIVER TUNNEL UNDER THE HUDSON RIVER; AND 3) LONG ISLAND RAIL ROAD (LIRR) EMERGENCY SERVICES BUILDING (ESB) UTILITY RELOCATION EARLY WORK ASSOCIATED WITH THE SEPARATELY FUNDED HUDSON YARDS CONCRETE CASING SECTION 3 PROJECT.; EXPECTED OUTCOMES: THE PURPOSE OF THE HTP IS TO PRESERVE THE CURRENT FUNCTIONALITY OF AMTRAKS NORTHEAST CORRIDOR (NEC) SERVICE AND NJ TRANSITS COMMUTER RAIL SERVICE BETWEEN NEW JERSEY AND PSNY BY REPAIRING THE DETERIORATING NORTH RIVER TUNNEL; AND TO STRENGTHEN THE NECS RESILIENCY TO SUPPORT RELIABLE SERVICE BY PROVIDING REDUNDANT CAPABILITY UNDER THE HUDSON RIVER FOR AMTRAK AND NJ TRANSIT NEC TRAINS BETWEEN NEW JERSEY AND PSNY. THESE IMPROVEMENTS MUST BE ACHIEVED WHILE MAINTAINING UNINTERRUPTED COMMUTER AND INTERCITY RAIL SERVICE AND BY OPTIMIZING THE USE OF EXISTING INFRASTRUCTURE. AT THE COMPLETION OF THE HTP THE NEC WOULD HAVE FOUR TRACKS (TWO IN THE NEW HUDSON TUNNEL AND TWO IN THE NORTH RIVER TUNNEL) BETWEEN NEW YORK AND NEW JERSEY UNDER THE HUDSON RIVER. NO CHANGES TO PSNY PLATFORMS OR PLATFORM TRACKS ARE PROPOSED AS PART OF THE HTP SINCE PSNY IS OUTSIDE OF THE HTP PROJECT AREA THEREFORE THE CURRENT OPERATIONAL CAPACITY OF PSNY WILL BE MAINTAINED AT THE LEVEL IT IS TODAY.; INTENDED BENEFICIARIES: THE HTP WILL ALLOW MULTIPLE NJ TRANSIT RAIL SERVICES THROUGHOUT THE STATE TO FEED INTO AND UTILIZE THE TUNNEL AND PSNY. THESE IMPORTANT RAIL CONNECTIONS FACILITATE THE MOVEMENT OF OVER 200000 TRAIN PASSENGERS TRIPS PER DAY BETWEEN NEW YORK AND NEW JERSEY.; SUBRECIPIENT ACTIVITIES: GDC DOES NOT HAVE ANY SUB-RECIPIENTS.
Department of Transportation
$75M
THIS AWARD UTILIZES ARP FUNDING TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS. THIS APPLICATION APPLIES FOR $75029220 IN ARP ADDITIONAL ASSISTANCE FUNDS TO SUPPORT THE PROJECTS INCLUDED BY THE FOLLOWING UZA APPORTIONMENTS:FFY21 ARP SECTION 5307 SAN FRANCISCO-OAKLAND UZA (UZA #78904): $75029220 TOTAL ELIGIBLE PROJECT COST: $75029220 GOLDEN GATE BRIDGE HIGHWAY TRANSPORTATION DISTRICT IS HEREBY SUBMITTING THIS GRANT APPLICATION IN SUPPORT OF THE FOLLOWING PROJECT:1. OPERATING ASSISTANCETHIS GRANT IS REQUESTING $75029220 OF FFY21 FEDERAL SECTION 5307 ARP FUNDS TO SUPPORT THE OPERATING ASSISTANCE FOR THE PERIOD OF JANUARY 20 2020 THROUGH JUNE 30 2026.OUR ESTIMATED OPERATING BUDGET FOR JULY 1 2021 TO JUNE 30 2022 IS $146346800. WE DEVELOPED OUR REQUEST BASED ON THE MOST RECENT YEARS NTD DATA.PURPOSE: THE PURPOSE OF THIS AWARD IS TO USE ARP FUNDS TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS.ACTIVITIES TO BE PERFORMED: ACTIVITIES INCLUDE ALL REGULAR TRANSIT OPERATIONS AND ADMINISTRATION NECESSARY TO PROVIDE TRANSIT SERVICE.EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS AWARD IS THE PROVISION OF TRANSIT SERVICE DURING THE COVID-19 PANDEMIC.INTENDED BENEFICIARIES: THIS AWARD WILL BENEFIT GOLDEN GATE TRANSIT AND GOLDEN GATE FERRY PATRONS AND ALL USERS OF THE HIGHWAY 101 CORRIDOR.SUBRECIPIENTS: THIS AWARD HAS NO SUBRECIPIENTS.THE RECIPIENT AGREES THAT IF IT RECEIVES FEDERAL FUNDING FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) OR THROUGH A PASS-THROUGH ENTITY THROUGH THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE ACT A DIFFERENT FEDERAL AGENCY OR INSURANCE PROCEEDS FOR ANY PORTION OF A PROJECT ACTIVITY APPROVED FOR FTA FUNDING UNDER THIS GRANT AGREEMENT IT WILL PROVIDE WRITTEN NOTIFICATION TO FTA AND REIMBURSE FTA FOR ANY FEDERAL SHARE THAT DUPLICATES FUNDING PROVIDED BY FEMA ANOTHER FEDERAL AGENCY OR AN INSURANCE COMPANY.PER ARP THE PROJECT IN THIS APPLICATION IS NOT REQUIRED TO BE PROGRAMMED IN THE LONG-RANGE TRANSPORTATION PLAN OR STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM.
Department of Transportation
$64.3M
APPLICATION PURPOSE: THE PURPOSE OF THIS PROJECT IS TO REHABILITATE AND REPLACE THE GANGWAYS FLOATS AND ASSOCIATED PIER SYSTEMS THAT PROVIDE PASSENGER ACCESS BETWEEN GOLDEN GATE FERRY VESSELS AND TERMINALS. THESE UPGRADES WILL IMPROVE SAFETY ACCESSIBILITY AND OPERATIONAL RELIABILITY ACROSS THE DISTRICTS FERRY NETWORK ENSURING COMPLIANCE WITH CURRENT DESIGN AND ACCESSIBILITY STANDARDS AND EXTENDING THE USEFUL LIFE OF CRITICAL FERRY TERMINAL INFRASTRUCTURE.THIS PROJECT SUPPORTS THE FEDERAL TRANSIT ADMINISTRATIONS (FTA) STATE OF GOOD REPAIR (SECTION 5337) PROGRAM GOAL OF MAINTAINING FIXED-GUIDEWAY AND FERRY SYSTEMS IN A STATE OF GOOD REPAIR AND ENSURING SAFE RELIABLE TRANSPORTATION FOR THE TRAVELING PUBLIC.; ACTIVITIES PERFORMED: THE PROJECT WILL INCLUDE THE DESIGN ENVIRONMENTAL CLEARANCE PROCUREMENT FABRICATION AND INSTALLATION OF NEW GANGWAYS FLOATS AND PIER COMPONENTS AT SELECTED DISTRICT FERRY TERMINALS. SPECIFIC ACTIVITIES INCLUDE:1.COMPLETION OF THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PROCESS AND RECEIPT OF FEDERAL ENVIRONMENTAL APPROVAL.2.FINAL DESIGN AND ENGINEERING OF REPLACEMENT GANGWAY AND FLOAT SYSTEMS.3.PROCUREMENT OF CONSTRUCTION SERVICES FABRICATION OF COMPONENTS AND ON-SITE INSTALLATION.4.TESTING AND COMMISSIONING OF UPGRADED FACILITIES TO ENSURE COMPLIANCE WITH ADA SEISMIC AND SAFETY STANDARDS.PROJECT IMPLEMENTATION WILL OCCUR FOLLOWING NEPA CLEARANCE AND FTA CONCURRENCE.; EXPECTED OUTCOMES: REPLACEMENT OF AGING GANGWAY AND FLOAT SYSTEMS WITH MODERN ADA-COMPLIANT STRUCTURES.IMPROVED PASSENGER SAFETY OPERATIONAL EFFICIENCY AND SYSTEM RELIABILITY.EXTENDED SERVICE LIFE OF FERRY TERMINAL ASSETS SUPPORTING ONGOING SYSTEM RESILIENCY.COMPLIANCE WITH FEDERAL ENVIRONMENTAL SAFETY AND ACCESSIBILITY REGULATIONS.THE PROJECT WILL MAINTAIN VITAL FERRY ACCESS INFRASTRUCTURE AND ENHANCE THE OVERALL PASSENGER EXPERIENCE THROUGH IMPROVED BOARDING SAFETY AND ACCESSIBILITY.; INTENDED BENEFICIARIES: THE INTENDED BENEFICIARIES INCLUDE FERRY PASSENGERS TRAVELING BETWEEN MARIN COUNTY AND SAN FRANCISCO PARTICULARLY DAILY COMMUTERS AND TOURISTS WHO DEPEND ON SAFE RELIABLE AND ACCESSIBLE FERRY CONNECTIONS. THE PROJECT ALSO BENEFITS THE BROADER REGIONAL TRANSPORTATION NETWORK BY MAINTAINING CRITICAL WATERBORNE TRANSIT INFRASTRUCTURE THAT SUPPORTS CONGESTION RELIEF AND ENVIRONMENTAL SUSTAINABILITY OBJECTIVES THROUGHOUT THE BAY AREA.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS FOR THIS PROJECT. ALL ACTIVITIES WILL BE CARRIED OUT DIRECTLY BY THE GOLDEN GATE BRIDGE HIGHWAY TRANSPORTATION DISTRICT.
Department of Transportation
$59.7M
GGBHTD FFY21 5307-8 CRRSAA GRANT TRANCHE I - OPERATING ASSISTANCE
Department of Transportation
$57.7M
THIS APPLICATION UTILIZES ARP FUNDING TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS. THIS GRANT APPLIES FOR $57697418 IN ARP FUNDS TO SUPPORT THE PROJECTS INCLUDED IN THIS APPLICATION BY THE FOLLOWING UZA APPORTIONMENTS: FFY21 ARP SECTION 5307-9 SAN FRANCISCO-OAKLAND UZA (UZA #78904): $50994092FFY21 ARP SECTION 5307-9 SANTA ROSA UZA (UZA #78904): $6703326TOTAL ELIGIBLE PROJECT COST: $57697418GOLDEN GATE BRIDGE HIGHWAY TRANSPORTATION DISTRICT IS HEREBY SUBMITTING THIS GRANT APPLICATION IN SUPPORT OF THE FOLLOWING PROJECT: 1. OPERATING ASSISTANCE THIS GRANT IS REQUESTING $57697418 OF FFY21 FEDERAL SECTION 5307-9 ARP FUNDS TO SUPPORT THE OPERATING ASSISTANCE FOR THE PERIOD OF JANUARY 20 2020 THROUGH JUNE 30 2023. OUR ESTIMATED OPERATING BUDGET FOR JULY 1 2020 TO JUNE 30 2021 IS $146346700. WE DEVELOPED OUR REQUEST BASED ON THE MOST RECENT YEARS NTD DATA.PURPOSE: THE PURPOSE OF THIS AWARD IS TO USE ARP FUNDS TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS.ACTIVITIES TO BE PERFORMED: ACTIVITIES INCLUDE ALL REGULAR TRANSIT OPERATIONS AND ADMINISTRATION NECESSARY TO PROVIDE TRANSIT SERVICE.EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS AWARD IS THE PROVISION OF TRANSIT SERVICE DURING THE COVID-19 PANDEMIC.INTENDED BENEFICIARIES: THIS AWARD WILL BENEFIT GOLDEN GATE TRANSIT AND GOLDEN GATE FERRY PATRONS AND ALL USERS OF THE HIGHWAY 101 CORRIDOR.SUBRECIPIENTS: THIS AWARD HAS NO SUBRECIPIENTS.THE RECIPIENT AGREES THAT IF IT RECEIVES FEDERAL FUNDING FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) OR THROUGH A PASS-THROUGH ENTITY THROUGH THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE ACT A DIFFERENT FEDERAL AGENCY OR INSURANCE PROCEEDS FOR ANY PORTION OF A PROJECT ACTIVITY APPROVED FOR FTA FUNDING UNDER THIS GRANT AGREEMENT IT WILL PROVIDE WRITTEN NOTIFICATION TO FTA AND REIMBURSE FTA FOR ANY FEDERAL SHARE THAT DUPLICATES FUNDING PROVIDED BY FEMA ANOTHER FEDERAL AGENCY OR AN INSURANCE COMPANY.PER ARP THE PROJECT IN THIS APPLICATION IS NOT REQUIRED TO BE PROGRAMMED IN THE LONG-RANGE TRANSPORTATION PLAN OR STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM.
Department of Transportation
$43.9M
THIS AWARD UTILIZES ARP FUNDING TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS. THIS APPLICATION APPLIES FOR $43855222 IN ARP FUNDS TO SUPPORT THE PROJECTS INCLUDED BY THE FOLLOWING UZA APPORTIONMENTS: FFY21 ARP SECTION 5307-9 SAN FRANCISCO-OAKLAND UZA (UZA #78904): $42091837FFY21 ARP SECTION 5307-9 SANTA ROSA UZA (UZA #78904): $1763385TOTAL ELIGIBLE PROJECT COST: $43855222GOLDEN GATE BRIDGE HIGHWAY TRANSPORTATION DISTRICT IS HEREBY SUBMITTING THIS GRANT APPLICATION IN SUPPORT OF THE FOLLOWING PROJECT: 1. OPERATING ASSISTANCE THIS GRANT IS REQUESTING $43855222 OF FFY21 FEDERAL SECTION 5307-9 ARP FUNDS TO SUPPORT THE OPERATING ASSISTANCE FOR THE PERIOD OF JANUARY 20 2020 THROUGH JUNE 30 2024. OUR ESTIMATED OPERATING BUDGET FOR JULY 1 2021 TO JUNE 30 2022 IS $146346800. WE DEVELOPED OUR REQUEST BASED ON THE MOST RECENT YEARS NTD DATA. PURPOSE: THE PURPOSE OF THIS AWARD IS TO USE ARP FUNDS TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS. ACTIVITIES TO BE PERFORMED: ACTIVITIES INCLUDE ALL REGULAR TRANSIT OPERATIONS AND ADMINISTRATION NECESSARY TO PROVIDE TRANSIT SERVICE. EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS AWARD IS THE PROVISION OF TRANSIT SERVICE DURING THE COVID-19 PANDEMIC. INTENDED BENEFICIARIES: THIS AWARD WILL BENEFIT GOLDEN GATE TRANSIT AND GOLDEN GATE FERRY PATRONS AND ALL USERS OF THE HIGHWAY 101 CORRIDOR. SUBRECIPIENTS: THIS AWARD HAS NO SUBRECIPIENTS.THE RECIPIENT AGREES THAT IF IT RECEIVES FEDERAL FUNDING FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) OR THROUGH A PASS-THROUGH ENTITY THROUGH THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE ACT A DIFFERENT FEDERAL AGENCY OR INSURANCE PROCEEDS FOR ANY PORTION OF A PROJECT ACTIVITY APPROVED FOR FTA FUNDING UNDER THIS GRANT AGREEMENT IT WILL PROVIDE WRITTEN NOTIFICATION TO FTA AND REIMBURSE FTA FOR ANY FEDERAL SHARE THAT DUPLICATES FUNDING PROVIDED BY FEMA ANOTHER FEDERAL AGENCY OR AN INSURANCE COMPANY.PER ARP THE PROJECT IN THIS APPLICATION IS NOT REQUIRED TO BE PROGRAMMED IN THE LONG-RANGE TRANSPORTATION PLAN OR STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM.
Department of Transportation
$30.2M
GGBHTD FFY20 5307-6 CARES ACT GRANT - OPERATING ASSISTANCE
Department of Transportation
$25M
APPLICATION PURPOSE: TONNELLE AVENUE BRIDGE PROJECT WILL CONVERT A PORTION OF TONNELLE AVENUE INTO A NEW ROADWAY BRIDGE.; ACTIVITIES PERFORMED: TONNELLE AVENUE WILL INCLUDE THE FOLLOWING ELEMENTS:CONSTRUCTION: TONNELLE AVENUE IS DESIGNED TO OCCUR IN THREE PHASES SO THAT TRAFFIC FLOW IN BOTH DIRECTIONS CAN BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. THE WEST SECTION OF THE BRIDGE (ALONG SOUTHBOUND TONNELLE AVENUE) IS PLANNED TO BE CONSTRUCTED FIRST FOLLOWED BY THE CENTER SECTION THEN THE EAST. TONNELLE AVENUE WILL PROVIDE ACCESS FOR CONSTRUCTION VEHICLES TO TRAVEL BETWEEN STAGING AREAS UTILIZED FOR THE HTP.PROFESSIONAL SERVICES: PROFESSIONAL SERVICES INCLUDE CONSTRUCTION MANAGEMENT PROJECT ADMINISTRATION INCLUDING STAFF COSTS PROGRAMMATIC COSTS AND OTHER THIRD-PARTY CONTRACTS. ADMINISTRATIVE SERVICES: ADMINISTRATIVE SERVICES WILL INCLUDE LEGAL PAYMENTS ASSOCIATED WITH NOISE MITIGATION MEASURES.; EXPECTED OUTCOMES: UPON COMPLETION THE TONNELLE AVENUE BRIDGE PROJECT WILL RESULT IN A NEW ROADWAY BRIDGE CARRYING TONNELLE AVENUE OVER A NEW RAILROAD RIGHT-OF-WAY FOR THE NEW HUDSON RIVER TUNNEL.; INTENDED BENEFICIARIES: THE HTP INCLUDES EFFORTS TO IMPROVE RACIAL EQUITY AND REDUCE BARRIERS TO OPPORTUNITY. THE TONNELLE AVENUE PROJECT AREA IS LOCATED WITHIN A FEDERALLY DESIGNATED OPPORTUNITY ZONE. IN AUGUST 2023 GDC ESTABLISHED A TWENTY-FOUR (24) HOUR HOTLINE AND A DEDICATED EMAIL TO MANAGE QUESTIONS AND INQUIRIES FROM THE COMMUNITY. A COMMUNITY LIAISON IS MONITORING THE HOTLINE AND EMAIL. ON AN AS-NEEDED BASIS GDC HAS DEVELOPED CONSTRUCTION FLYERS THAT DETAIL TRAFFIC UPDATES WHICH ARE SHARED WITH LOCAL ELECTED OFFICIALS. DURING CONSTRUCTION A COMMUNITY TRAILER WILL BE ESTABLISHED.; SUBRECIPIENT ACTIVITIES: GDC DOES NOT HAVE ANY SUBRECIPIENTS.
Department of Transportation
$21.4M
GGBHTD FFY20 5307-6 CARES ACT GRANT TRANCHE II - OPERATING ASSISTANCE
Department of Transportation
$19.9M
PURPOSE: RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 6,600 FEET OF EXISTING CONCRETE RUNWAY 12R/30L THAT HAS REACHED THE END OF ITS USEFUL LIFE. . THIS GRANT FUNDS A PORTION OF THE FINAL PHASE, WHICH CONSISTS OF RECONSTRUCTION OF 3,645 FEET. THIS GRANT IS ASSOCIATED WITH AN AIRPORT INFRASTRUCTURE GRANT THAT FUNDS THE REMAINING ELIGIBLE PORTION OF THE PROJECT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Health and Human Services
$19.3M
HEAD START AND EARLY HEAD START
Department of Transportation
$18M
APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE FEDERAL FINANCIAL ASSISTANCE TO ACQUIRE ONE LOW EMISSION FERRY REPLACING A DIESEL FERRY TO SUPPORT THE DISTRICTS COMPLIANCE WITH THE CALIFORNIA AIR RESOURCE BOARD (CARB) COMMERCIAL HARBOR CRAFT REGULATIONS PLAN FOR AN ALTERNATIVE CONTROL OF EMISSIONS (ACE) STANDARD AND TO REPLACE MAJOR FERRY COMPONENTS ON GOLDEN GATE FERRY VESSELS TO ENSURE PASSENGER SAFETY AND OVERALL STATE OF GOOD REPAIR REQUIREMENTS ARE MET.; ACTIVITIES PERFORMED: 1.THE DEL NORTE II FERRY REPLACEMENT INVOLVES BUILDING ONE NEW LOW-EMISSION REPLACEMENT FERRY VESSEL.2.FERRY MAJOR COMPONENT REHABILITATION INVOLVES THE REPLACEMENT OF MAJOR FERRY COMPONENTS SUCH AS NAVIGATION SYSTEMS HULL INTERIOR LIFESAVING EQUIPMENT PROPULSION AND OTHER FERRY COMPONENTS.; EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS PROJECT WILL REDUCE CARBON EMISSIONS AND IMPROVE STATE OF GOOD REPAIR AND SAFETY FOR GOLDEN GATE FERRY VESSELS.; INTENDED BENEFICIARIES: BENEFICIARIES OF THE PROJECTS IN THIS GRANT APPLICATION INCLUDE ALL COMMUTERS TRAVELING BETWEEN SAN FRANCISCO AND MARIN COUNTY CALIFORNIA VIA THE US 101 HIGHWAY CORRIDOR.; SUBRECIPIENT ACTIVITIES: THERE IS NO SUBRECIPIENT ACTIVITY ASSOCIATED WITH THESE PROJECTS.
Department of Transportation
$17.9M
PURPOSE: RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 6,600 FEET OF EXISTING CONCRETE RUNWAY 12R/30L THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS GRANT FUNDS A PORTION OF PHASE 1, WHICH CONSISTS OF RECONSTRUCTION OF 2,955 FEET. THIS GRANT IS ASSOCIATED WITH A BIPARTISAN INFRASTRUCTURE LAW AIRPORT GRANT THAT FUNDS THE REMAINING ELIGIBLE PORTION OF THE PROJECT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Transportation
$14.4M
PURPOSE: TERMINAL (PFC ONLY: GATES AND RELATED AREAS). ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL BUILDING AN ADDITIONAL 21,000 SQUARE FEET TO INCLUDE FIVE GATES AND RELATED AREAS UNDER THE EXPANDED ELIGIBILITY OF THE BIPARTISAN INFRASTRUCTURE LAW. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Health and Human Services
$14.1M
HOPE IN APPALACHIA (PROJECT HOPE)
Department of Health and Human Services
$12.7M
HEAD START AND EARLY HEAD START
Department of Transportation
$11.7M
PURPOSE: CONSTRUCT CONTRACT TOWER. THIS GRANT INCLUDES FUNDING BY THE AMERICAN RESCUE PLAN ACT OF 2021 TO INCREASE THE FEDERAL SHARE TO 100 PERCENT FOR THE AIRPORT IMPROVEMENT PROGRAM (AIP). ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONSTRUCTS A REPLACEMENT SPONSOR-OWNED AIR TRAFFIC CONTROL TOWER APPROVED FOR ACCEPTANCE IN THE FEDERAL CONTRACT TOWER PROGRAM. THIS GRANT FUNDS THE FINAL PHASE, WHICH CONSISTS OF CONSTRUCTION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Transportation
$9.9M
PURPOSE: RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 9,300 FEET OF THE EXISTING RUNWAY 12C/30C PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS GRANT FUNDS THE FIRST PHASE, WHICH CONSISTS OF CONSTRUCTION OF THE SOUTHERN 3,000 FEET OF RUNWAY 12C/30C. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Education
$9.9M
HIGHER EDUCATION HIGHER EMERGENCY RELIEF GRANT - INSTITUTIONAL PORTION
Department of Education
$9.7M
GATEWAY TECHNICAL COLLEGE EMERGENCY RELIEF FUNDING
Department of Health and Human Services
$9.5M
GATEWAY HEALTH PROFESSIONS OPPORTUNITIES PROGRAM
Department of Housing and Urban Development
$9.4M
SUPPORTIVE HOUSING FOR THE ELDERLY
Department of State
$8.8M
THE FUELING AI INNOVATION AND ADOPTION PROGRAM (FAIIA) ADDRESSES FOUNDATIONAL BARRIERS TO AI DEPLOYMENT AND ADOPTION ABROAD. FAIIA PROMOTES THE U.S. APPROACH TO AI INNOVATION, COMPETITION, APPLICATION, AND GOVERNANCE.
Department of Transportation
$8.2M
PURPOSE: AMERICAN RESCUE PLAN ACT AWARDED AS ECONOMIC ASSISTANCE TO ELIGIBLE U.S. AIRPORTS AND ELIGIBLE CONCESSIONS AT THOSE AIRPORTS TO PREVENT, PREPARE FOR, AND RESPOND TO THE COVID-19 PANDEMIC. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS GRANT PROVIDES ECONOMIC RELIEF FUNDS FOR COSTS RELATED TO OPERATIONS, PERSONNEL, CLEANING, SANITIZATION, JANITORIAL SERVICES, DEBT SERVICE PAYMENTS, AND COMBATING THE SPREAD OF PATHOGENS AT THE AIRPORT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Education
$8.1M
EMERGENCY FINANCIAL AID GRANT TO STUDENTS UNDER THE CORONAVIRUS AID, RELIEF, AND ECONOMIC SECURITY (CARES) ACT
Department of Transportation
$8.1M
FY15 AND FY19 PASSENGER FERRY GRANT PROGRAM
Department of Health and Human Services
$8M
GATEWAY'S HEALTH PROFESSION OPPORTUNITY PROJECT
Department of Health and Human Services
$7.8M
EARLY HEAD START EXPANSION
Department of Housing and Urban Development
$7.8M
ECONOMIC DEVELOPMENT INITIATIVE, COMMUNITY PROJECT FUNDING, AND MISCELLANEOUS GRANTS
Department of Education
$7.7M
GATEWAY INSTITUTIONAL EMERGENCY RELIEF FUND
Department of Commerce
$7.6M
THIS EDA INVESTMENT WILL CONSTRUCT A NEW WASTEWATER COLLECTION AND TREATMENT SYSTEM IN COOKE CITY, ADJACENT TO YELLOWSTONE NATIONAL PARK IN MONTANA, A REMOTE AREA IMPACTED BY RECENT NATURAL DISASTERS. COOKE CITY SEWER DISTRICT IS ADDRESSING THE LOCAL NEED FOR WASTEWATER MANAGEMENT WITH THIS PROJECT, WHICH WILL REPLACE A FAILING DRAINFIELD SYSTEM. THE NEW SYSTEM WILL RESULT IN TRANSFORMATIVE ECONOMIC AND ENVIRONMENTAL IMPACTS FOR THE SMALL COMMUNITY AND DOZENS OF BUSINESSES THAT SERVE HUNDREDS OF THOUSANDS OF TOURISTS EACH YEAR. TOURISM REVENUE DECREASED SIGNIFICANTLY DURING 2022 FLOODING. THE SYSTEM WILL GIVE THE COMMUNITY THE CERTAINTY FOR ESTABLISHED BUSINESSES TO STAY OPEN, OFFER TOURISTS MORE AMENITIES, AND RETAIN JOBS WHILE POSITIONING COOKE CITY TO HAVE ADEQUATE WASTEWATER MANAGEMENT FOR FUTURE GROWTH AND RESILIENCE TO FUTURE NATURAL DISASTERS. THIS PROJECT WAS MADE POSSIBLE BY THE REGIONAL PLANNING EFFORTS LED BY THE NORTHERN ROCKY MOUNTAIN ECONOMIC DEVELOPMENT DISTRICT (NRMEDD). EDA FUNDS NRMEDD TO BRING TOGETHER THE PUBLIC AND PRIVATE SECTORS TO CREATE AN ECONOMIC DEVELOPMENT ROADMAP TO STRENGTHEN THE REGIONAL ECONOMY, SUPPORT PRIVATE CAPITAL INVESTMENT AND CREATE JOBS.
Department of Transportation
$7.1M
APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE FEDERAL FINANCIAL ASSISTANCE FOR THE REHABILITATION OF GOLDEN GATES FERRY FIXED GUIDEWAYS AND VESSELS.; ACTIVITIES PERFORMED: ACTIVITIES TO BE PERFORMED INCLUDE:1. FERRY MAJOR COMPONENTS REHAB INVOLVES REHABILITATING AND REPLACING MAJOR FERRY COMPONENTS INCLUDING NAVIGATION SYSTEMS ONBOARD MONITORING AND ALARM SYSTEMS INTERIOR COMPONENTS BOARDING APPARATUS HULL LIFESAVING EQUIPMENT PROPULSION SYSTEMS AND OTHER FERRY COMPONENTS.2. FERRY CHANNEL AND BERTH DREDGING PROJECT INVOLVES DREDGING THE NAVIGATION CHANNEL AND BERTH AT LARKSPUR FERRY TERMINAL TO MAINTAIN THEM AT SAFE OPERATIONAL DEPTHS TO FACILITATE THE CONTINUATION OF THE FERRY SERVICE.; EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS PROJECT WILL BE AN IMPROVED STATE OF GOOD REPAIR FOR GOLDEN GATE FERRY VESSELS AND FACILITIES.; INTENDED BENEFICIARIES: BENEFICIARIES OF THE PROJECTS IN THIS GRANT APPLICATION INCLUDE ALL COMMUTERS TRAVELING BETWEEN SAN FRANCISCO AND MARIN COUNTY CALIFORNIA VIA THE US 101 HIGHWAY CORRIDOR.; SUBRECIPIENT ACTIVITIES: THERE IS NO SUBRECIPIENT ACTIVITY ASSOCIATED WITH THESE PROJECTS.
Department of Health and Human Services
$7.1M
AMERICAN RESCUE PLAN ACT FUNDING FOR HEALTH CENTERS
Department of Transportation
$6.9M
APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE FEDERAL FINANCIAL ASSISTANCE TO DESIGN INFRASTRUCTURE TO SUPPORT TRANSITIONING TO ZERO EMISSION BUSES (ZEB) TO INSTALL SECURITY AND SAFETY SYSTEMS ON BUSES TO REPLACE GOLDEN GATES FERRY VESSELS IN COMPLIANCE WITH THE CALIFORNIA AIR RESOURCES BOARD LOW-EMISSION STANDARDS AND TO DREDGE CHANNELS AND BERTHS FOR SAFE FERRY PASSAGE.; ACTIVITIES PERFORMED: 1.ZERO EMISSION BUS INFRASTRUCTURE DESIGN INVOLVES DESIGNING INFRASTRUCTURE NECESSARY TO SUPPORT ZERO EMISSION BUSES.2.TRANSIT ENHANCEMENTS WILL INSTALL SAFETY AND SECURITY SYSTEMS PROTECTING DRIVERS AND PASSENGERS.3.FERRY VESSEL REPLACEMENT INVOLVES REPLACING EXISTING FERRY VESSELS WITH LOW EMISSION VESSELS IN COMPLIANCE WITH CALIFORNIA AIR RESOURCES BOARD REGULATIONS. 4.FERRY CHANNEL AND BERTH DREDGING INVOLVES DREDGING THE NAVIGATION CHANNEL AND BERTH AT LARKSPUR FERRY TERMINAL TO MAINTAIN THEM AT SAFE OPERATIONAL DEPTHS TO FACILITATE THE CONTINUATION OF THE FERRY SERVICE.; EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS PROJECT WILL BE AN IMPROVED STATE OF GOOD REPAIR AND SAFETY FOR GOLDEN GATE FERRY VESSELS AND REDUCE CARBON EMISSIONS.; INTENDED BENEFICIARIES: BENEFICIARIES OF THE PROJECTS IN THIS GRANT APPLICATION INCLUDE ALL COMMUTERS TRAVELING BETWEEN SAN FRANCISCO AND MARIN COUNTY CALIFORNIA VIA THE US 101 HIGHWAY CORRIDOR.; SUBRECIPIENT ACTIVITIES: THERE IS NO SUBRECIPIENT ACTIVITY ASSOCIATED WITH THESE PROJECTS.
Department of Transportation
$6.2M
GOLDEN GATE BRIDGE HIGHWAY TRANSPORTATION DISTRICT IS HEREBY SUBMITTING THIS GRANT APPLICATION IN THE AMOUNT OF $6171332 ($5350000 IN 5337 FIXED GUIDEWAY FUNDS AND $821332 IN 5307 FUNDS). THIS GRANT SUPPORTS THE FOLLOWING PROJECTS:1. FERRY MAJOR COMPONENTS REHAB - TIP ID: MRN150014$277332 IN 5307 FUNDING FROM THE SFO UZA (FY 21 ADA SET-ASIDE) FERRY MAJOR COMPONENTS REHAB INVOLVES REHABILITATION AND REPLACEMENT OF MAJOR FERRY COMPONENTS INCLUDING NAVIGATION SYSTEMS ONBOARD MONITORING AND ALARM SYSTEMS INTERIOR COMPONENTS BOARDING APPARATUS HULL LIFESAVING EQUIPMENT PROPULSION SYSTEMS AND OTHER FERRY COMPONENTS. 2. FERRY MAJOR COMPONENTS REHAB - TIP ID: MRN150014$4670000 IN 5337 FUNDING FROM THE SFO UZA (FY 21)FERRY MAJOR COMPONENTS REHAB INVOLVES REHABILITATION AND REPLACEMENT OF MAJOR FERRY COMPONENTS INCLUDING NAVIGATION SYSTEMS ONBOARD MONITORING AND ALARM SYSTEMS INTERIOR COMPONENTS BOARDING APPARATUS HULL LIFESAVING EQUIPMENT PROPULSION SYSTEMS AND OTHER FERRY COMPONENTS. 3. FERRY CHANNEL AND BERTH DREDGING TIP ID: MRN990017$640000 IN 5337 FUNDING FROM THE SFO UZA (FY 21)THIS PROJECT INVOLVES DREDGING THE NAVIGATION CHANNEL AND BERTH AT LARKSPUR FERRY TERMINAL TO MAINTAIN THEM AT SAFE OPERATIONAL DEPTHS TO FACILITATE CONTINUATION OF THE FERRY SERVICE.4. TRANSIT SYSTEM ENHANCEMENTS TIP ID: MRN130015$544000 IN 5307 FUNDING FROM THE SFO UZA (FY 21)TICKETING SYSTEM AND TICKET VENDING MACHINE (TVM) REPLACEMENT AND TECHNOLOGY ENHANCEMENTS TO IMPROVE FARE COLLECTION.5. GANGWAYS PIERS - TIP ID: MRN030010$40000 IN 5337 FUNDING FROM THE SFO UZA (FY 21)THE GANGWAYS PIERS PROJECT WILL INCLUDE REHABILITATING AND REPLACING THE FLOATS AND GANGWAY SYSTEMS THAT ALLOW PASSENGERS TO GET FROM THE VESSELS TO THE TERMINALS (EXTENSION OF THE FIXED GUIDEWAY IN THE MARINE ENVIRONMENT). THIS PROJECT WILL ALSO REPLACE EXISTING PASSENGER LOADING FACILITIES (RAMPS) FLOATING BARGES PIERS AND HYDRAULIC SYSTEMS. ALL PROJECTS FUNDED WITH 5337 FUNDS ARE INCLUDED IN THE INVESTMENT PRIORITIZATION SECTION OF GGBHTDS TAM PLAN.
Department of Education
$6.1M
CARES ACT HIGHER EDUCATION EMERGENCY RELIEF FUND- IHES
Department of Transportation
$6M
PURPOSE: EXPAND TERMINAL BUILDING. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT INSTALLS 4 ADDITIONAL TERMINAL GATES TO INCREASE THE AIRPORT'S CAPACITY TO MEET THE OPERATIONAL NEEDS OF THE AIRPORT. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Housing and Urban Development
$5.6M
GREEN AND RESILIENT RETROFIT PROGRAM
Department of Commerce
$5.6M
SOUTH BALTIMORE GATEWAY PARTNERSHIP WILL BE AWARDED $5,619,858 TO RESTORE MARSH HABITAT IN AN URBAN ECOSYSTEM IN BALTIMORE CITY. THE PROJECT IS PART OF A LARGER INITIATIVE CALLED REIMAGINE MIDDLE BRANCH A COMMUNITY-LED INITIATIVE TO RECONNECT SOUTH BALTIMORE RESIDENTS TO THE NEARBY RIVER. THE NATURE-BASED INFRASTRUCTURE IS EXPECTED TO REDUCE EROSION AND FLOODING. THE RESTORED MARSHES WILL BE DESIGNED TO CONTINUOUSLY ADAPT TO RISING SEA LEVELS. THE PROJECT WILL ALSO ENHANCE PUBLIC ACCESS TO THE RIVER AND CONNECT TO EXISTING REGIONAL TRAIL NETWORKS.
Department of Transportation
$5.3M
GOLDEN GATE BRIDGE HIGHWAY TRANSPORTATION DISTRICT IS HEREBY SUBMITTING THIS GRANT APPLICATION IN THE AMOUNT OF $5350000 IN 5337 FIXED GUIDEWAY FUNDS. THE SOURCE OF THE $1337500 LOCAL MATCH IS GOLDEN GATE BRIDGE TOLL REVENUES. THIS GRANT SUPPORTS THE FOLLOWING PROJECTS:1. FERRY CHANNEL AND BERTH DREDGING TIP ID: MRN990017$5350000 IN 5337 FUNDING FROM THE SFO UZA (FY 22)THIS PROJECT INVOLVES DREDGING THE NAVIGATION CHANNEL AND BERTH AT LARKSPUR FERRY TERMINAL TO MAINTAIN THEM AT SAFE OPERATIONAL DEPTHS TO FACILITATE CONTINUATION OF THE FERRY SERVICE.OPURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE FEDERAL ASSISTANCE FOR THE REHABILITATION OF GOLDEN GATE FERRY FIXED GUIDEWAYS.OACTIVITIES TO BE PERFORMED: GGBHTD WILL DREDGE THE NAVIGATION CHANNEL AND BERTH AT LARKSPUR FERRY TERMINAL TO MAINTAIN THEM AT SAFE OPERATIONAL DEPTHS TO FACILITATE CONTINUATION OF THE FERRY SERVICE. OEXPECTED OUTCOMES: THE OUTCOME OF THIS PROJECT WILL BE IMPROVED STATE OF GOOD REPAIR FOR FERRY FIXED GUIDEWAYS.OINTENDED BENEFICIARIES: BENEFICIARIES OF THIS PROJECT INCLUDE ALL PEOPLE TRAVELING BETWEEN SAN FRANCISCO AND MARIN COUNTY CALIFORNIA VIA THE US 101 CORRIDOR.OSUBRECIPIENTS: THIS AWARD HAS NO SUBRECIPIENTS.ALL PROJECTS FUNDED WITH 5337 FUNDS ARE INCLUDED IN THE INVESTMENT PRIORITIZATION SECTION OF GGBHTDS TAM PLAN.
Department of Transportation
$5.1M
APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE FINANCIAL ASSISTANCE TO PURCHASE ONE NEW FERRY VESSEL FOR GOLDEN GATES FERRY FLEET TO PROVIDE SERVICE SYSTEMWIDE.; ACTIVITIES PERFORMED: GGBHTD WILL ACQUIRE A NEW FERRY VESSEL ADDING TO ITS CURRENT 7-VESSEL FLEET TO ENSURE UNINTERRUPTED SERVICE WHILE VESSELS ROTATE IN AND OUT OF DRYDOCKING.; EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS PROJECT WILL BE IMPROVED STATE OF GOOD REPAIR FOR FERRY VESSELS.; INTENDED BENEFICIARIES: BENEFICIARIES OF THIS PROJECT INCLUDE ALL PEOPLE TRAVELING BETWEEN SAN FRANCISCO AND MARIN COUNTIES CALIFORNIA VIA THE US 101 HIGHWAY CORRIDOR.; SUBRECIPIENT ACTIVITIES: THERE IS NO SUBRECIPIENT ACTIVITY ASSOCIATED WITH THIS PROJECT.
Department of Transportation
$4.9M
APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE FEDERAL FINANCIAL ASSISTANCE TO ACQUIRE FIVE ZERO EMISSION BUSES REPLACING DIESEL BUSES TO SUPPORT THE GOLDEN GATE BRIDGE HIGHWAY AND TRANSPORTATION DISTRICT (DISTRICT)S TRANSITION TO ZERO EMISSION BUSES (ZEB) AND TO REPLACE MAJOR FERRY COMPONENTS ON GOLDEN GATE FERRY VESSELS TO ENSURE PASSENGER SAFETY AND OVERALL STATE OF GOOD REPAIR REQUIREMENTS ARE MET.; ACTIVITIES PERFORMED: 1.ZERO EMISSION BUS REPLACEMENT INVOLVES THE PURCHASE OF FIVE (5) ZEBS TO REPLACE FIVE (5) DIESEL BUSES.2.FERRY MAJOR COMPONENT REHABILITATION INVOLVES THE REPLACEMENT OF MAJOR FERRY COMPONENTS SUCH AS NAVIGATION SYSTEMS DRY-DOCK HULL INTERIOR LIFESAVING EQUIPMENT PROPULSION AND OTHER FERRY COMPONENTS.; EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS PROJECT WILL BE AN IMPROVED STATE OF GOOD REPAIR AND SAFETY FOR GOLDEN GATE FERRY VESSELS AND REDUCE CARBON EMISSIONS FOR GOLDEN GATE TRANSIT BUSES.; INTENDED BENEFICIARIES: BENEFICIARIES OF THE PROJECTS IN THIS GRANT APPLICATION INCLUDE ALL COMMUTERS TRAVELING BETWEEN SAN FRANCISCO AND MARIN COUNTY CALIFORNIA VIA THE US 101 HIGHWAY CORRIDOR.; SUBRECIPIENT ACTIVITIES: THERE IS NO SUBRECIPIENT ACTIVITY ASSOCIATED WITH THESE PROJECTS.
Department of Health and Human Services
$4.8M
NEW PATHWAYS FOR FATHERS AND FAMILIES PROGRAM
Department of Housing and Urban Development
$4.8M
COMMUNITY DEVELOPMENT BLOCK GRANTS/ENTITLEMENT GRANTS
Department of Housing and Urban Development
$4.7M
REG INTEGRATED PLANNING GRNTS
Department of Education
$4.7M
CARES ACT HIGHER EDUCATION EMERGENCY RELIEF FUND
Department of Transportation
$4.5M
PURPOSE: REALIGN TAXIWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT REALIGNS EXISTING PAVED TAXIWAY G BY 45 DEGREES TO BRING THE AIRPORT INTO CONFORMITY WITH CURRENT STANDARDS. THIS GRANT FUNDS A PORTION OF PHASE 1, WHICH CONSISTS OF DESIGN AND CONSTRUCTION. THIS GRANT IS ASSOCIATED WITH AN AIRPORT IMPROVEMENT PROGRAM GRANT THAT FUNDS THE REMAINING ELIGIBLE PORTION OF THE PROJECT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Education
$4.5M
HIGHER EDUCATION EMERGENCY RELIEF FUND PROJECT: COLGATE UNIVERSITY
Department of Veterans Affairs
$4.5M
VA IS PROVIDING PER DIEM FUNDING TO ASSIST WITH THE OPERATIONAL COSTS ASSOCIATED WITH TRANSITIONAL HOUSING BEDS FOR HOMELESS VETERANS.
Department of Transportation
$4.4M
PURPOSE: RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 9,300 FEET OF THE EXISTING RUNWAY 12C/30C PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS GRANT FUNDS THE SECOND PHASE, WHICH CONSISTS OF RECONSTRUCTION OF THE NORTHERN 2,000 FEET OF THE RUNWAY. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Transportation
$4.3M
PURPOSE: REHABILITATE RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT REHABILITATES 5,700 FEET OF EXISTING PAVED RUNWAY 12C/30C TO MAINTAIN THE STRUCTURAL INTEGRITY AND MINIMIZE FOREIGN OBJECT DEBRIS TO EXTEND ITS USEFUL LIFE. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Transportation
$4.1M
PURPOSE: RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 6,600 FEET OF EXISTING CONCRETE RUNWAY 12R/30L THAT HAS REACHED THE END OF ITS USEFUL LIFE. . THIS GRANT FUNDS A PORTION OF PHASE 2, WHICH CONSISTS OF RECONSTRUCTION OF 3,645 FEET. . THIS GRANT IS ASSOCIATED WITH AN AIRPORT IMPROVEMENT PROGRAM GRANT THAT FUNDS THE REMAINING ELIGIBLE PORTION OF THE PROJECT. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Education
$4M
CARES ACT HIGHER EDUCATION EMERGENCY RELIEF FUND - IHES - INSTITUTIONAL SHARE
Department of Transportation
$4M
PURPOSE: REALIGN TAXIWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT REALIGNS EXISTING PAVED TAXIWAY G BY 45 DEGREES TO BRING THE AIRPORT INTO CONFORMITY WITH CURRENT STANDARDS. THIS GRANT FUNDS A PORTION OF THE TOTAL PROJECT. THIS GRANT IS ASSOCIATED WITH AN AIRPORT INFRASTRUCTURE GRANT THAT FUNDS THE REMAINING ELIGIBLE PORTION OF THE PROJECT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Health and Human Services
$4M
CCBHC IMPROVEMENT AND ADVANCEMENT (CCBHC IA) - GATEWAY COMMUNITY SERVICES, INC. (GATEWAY) IS A LICENSED, CARF ACCREDITED, AND SAMHSA APPROVED CCBHC IN JACKSONVILLE, FLORIDA THAT PROVIDES COMPREHENSIVE SUBSTANCE USE, MENTAL HEALTH, AND INTEGRATED PRIMARY CARE SERVICES. DUVAL COUNTY AND THE CITY OF JACKSONVILLE HAVE HAD A CONSOLIDATED GOVERNMENT SINCE 1968 – PRESENTING A UNIQUE ASSET FOR IMPLEMENTING LOCAL, COMPREHENSIVE PROGRAMS. THE CCBHC IMPROVEMENT AND ADVANCEMENT PROGRAM WILL MAINLY BE IMPLEMENTED IN DUVAL COUNTY AND OPERATE OUT OF GATEWAY’S MAIN CAMPUS AT 555 STOCKTON ST. THE IDENTIFIED POPULATIONS OF FOCUS INCLUDE LOW-INCOME INDIVIDUALS AND FAMILIES WITH SEVERE MENTAL ILLNESS, SEVERE SUBSTANCE USE DISORDERS, MENTAL HEALTH AND PRIMARY CARE HEALTH NEEDS. THROUGH EVALUATION OF THE CURRENT CCBHC PROGRAM LAUNCHED IN 2021 THROUGH FUNDING FROM SAMHSA THROUGH FOA SM-20-012, GATEWAY HAS IDENTIFIED THE FOLLOWING SERVICE GAPS IN THE AREA: 1) LACK OF INTEGRATED CARE COORDINATION BETWEEN PARTNERS LEADING TO BARRIERS TO FOLLOW-UP CARE AND DECREASES IN PATIENT ENGAGEMENT; AND 2) NEED FOR ADDITIONAL MENTAL HEALTH SERVICES FOR ADOLESCENTS WITH SERIOUS EMOTIONAL DISTURBANCES. THE GROWING NUMBER OF INDIVIDUALS NEEDING BOTH MENTAL HEALTH AND SUBSTANCE USE TREATMENT HIGHLIGHTS THE NEED FOR INTEGRATED CARE IN THE COMMUNITY. EXPANDING EVIDENCE-BASED PREVENTION POLICIES, PROGRAMS, AND PRACTICES THAT AIM TO REDUCE RISK FACTORS AND STRENGTHEN PROTECTIVE FACTORS RELATED TO YOUTH ARE CRITICALLY NEEDED THE PROGRAM EXPECTS TO SERVE 1,425 OVER THE FOUR-YEAR PERIOD, SERVING 450 INDIVIDUALS IN YEAR 1 AND 325 INDIVIDUALS EACH IN YEAR 2, YEAR 3 AND YEAR 4. THE OVERALL GOAL OF THE PROGRAM IS TO IMPROVE AND ADVANCE ACCESS TO AND AVAILABILITY OF HIGH-QUALITY SERVICES THAT ARE RESPONSIVE TO THE NEEDS OF THE COMMUNITY.
Department of Health and Human Services
$4M
CERTIFIED COMMUNITY BEHAVIORAL HEALTH CLINIC - GATEWAY HEALTHCARE PROPOSES TO IMPLEMENT A CERTIFIED COMMUNITY BEHAVIORAL HEALTH CLINIC (CCBHC) SERVING PAWTUCKET AND CENTRAL FALLS, RHODE ISLAND TO INCREASE ACCESS TO PERSON- AND FAMILY-CENTERED INTEGRATED BEHAVIORAL HEALTH SERVICES, PARTICULARLY FOR COMMUNITIES FACING HEALTH DISPARITIES AND THOSE OF COLOR. THE PROJECT ANTICIPATES SERVING 1,450 UNDUPLICATED ADULTS, ADOLESCENTS AND CHILDREN. THE POPULATIONS OF FOCUS ARE: 1) INDIVIDUALS WITH SERIOUS MENTAL ILLNESS (SMI); 2) INDIVIDUALS WITH SUBSTANCE USE DISORDERS (SUD); 3) CHILDREN AND ADOLESCENTS WITH SERIOUS EMOTIONAL DISTURBANCES (SED) EXPERIENCING TRAUMA AND/OR EATING DISORDERS; 4) YOUNG ADULTS WITH EMERGING PSYCHOSIS, AND 5) INDIVIDUALS EXPERIENCING A BEHAVIORAL HEALTH CRISIS. THE PROJECT HAS FOUR PRIMARY GOALS: 1) TO ESTABLISH A FULLY OPERATIONAL CCBHC, PROVIDING THE COMPLETE SCOPE OF CCBCH SERVICES TO ALL INDIVIDUALS ELIGIBLE; 2) TO IMPLEMENT EVIDENCE-BASED PRACTICES (EBPS) APPROPRIATE AND SPECIFIC TO EACH POPULATION SERVED; 3) TO ESTABLISH PARTNERSHIPS WITH ADDITIONAL COMMUNITY PROVIDERS AND ORGANIZATIONS TO IMPROVE ACCESSIBILITY OF SERVICES AND CARE COORDINATION FOR CLIENTS AND REDUCE HEALTH DISPARITIES OF RACIAL, ETHNIC, LGBTQ, AND HOMELESS POPULATIONS; AND, 4) TO IMPLEMENT INFRASTRUCTURE ENHANCEMENTS TO IMPROVE THE OVERALL QUALITY AND COORDINATION OF CARE. KEY MEASURABLE OBJECTIVES INCLUDE: 1) IMPLEMENTATION OF SIX EBPS WITH CLIENTS: MOTIVATIONAL INTERVIEWING (MI), SKILLS-BASED COGNITIVE BEHAVIOR THERAPY (CBT), COORDINATED SPECIALTY CARE (CSC), COLLABORATIVE ASSESSMENT & MANAGEMENT OF SUICIDALITY (CAMS), FAMILY-BASED THERAPY (FBT) AND TRAUMA FOCUSED-COGNITIVE BEHAVIOR THERAPY (TF-CBT); 2) ESTABLISHMENT OF FORMAL MULTIDISCIPLINARY CARE COORDINATION AGREEMENTS NECESSARY FOR PROJECT SUCCESS; AND 3) TRAINING OF THE WORKFORCE IN THE EBPS RELATED TO THE POPULATION EACH SERVES, WITH BI-ANNUAL MONITORING TO MAINTAIN 90% FIDELITY AND AT LEAST 45 COMPLETING TRAINING IN MI AND CBT; 20 IN CAMS, 6 IN CSC, 5 IN FBT, AND 6 IN TF-CBT. STRATEGIES AND INTERVENTIONS TO MEET THESE GOALS AND OBJECTIVES INCLUDE: 1) PROVIDING THE CORE CCBHC SERVICES: CRISIS MENTAL HEALTH SERVICES; SCREENING AND ASSESSMENTS; PATIENT-CENTERED TREATMENT PLANNING; OUTPATIENT MENTAL HEALTH AND SUBSTANCE USE SERVICES; OUTPATIENT CLINIC PRIMARY CARE SCREENING; CASE MANAGEMENT; PSYCHIATRIC REHABILITATION SERVICES; PEER SUPPORT, COUNSELOR SERVICES, AND FAMILY SUPPORTS; AND COMMUNITY-BASED MENTAL HEALTH FOR MEMBERS OF THE ARMED FORCES. 2) EXPANDING THE NUMBER OF CLINICIANS IN THE STATE WITH BOTH EXPERTISE AND TRAINING IN EVIDENCE-BASED PROGRAMS FOR INDIVIDUALS WITH SMI, SUD, SED AND OTHER BEHAVIORAL HEALTH CRISES. 3) STRENGTHENING CARE COORDINATION AMONG ORGANIZATIONS THAT SUPPORT SPECIFIC POPULATIONS, SUCH AS LATINX, IMMIGRANTS OR MILITARY; PRIMARY CARE PROVIDERS AND FQHCS; EMERGENCY DEPARTMENTS; SCHOOLS; AND HOUSING AGENCIES TO SUPPORT THE OVERALL WELL-BEING OF INDIVIDUALS WITH BEHAVIORAL HEALTH AND/OR SUBSTANCE USE DISORDERS. OVER THE COURSE OF THE PROJECT, 1,450 INDIVIDUALS WILL BE SERVED THROUGH THE CCBHC, AS FOLLOWS: YEAR 1: 320; YEAR 2: 355; YEAR 3: 385; AND YEAR 4: 390.
Department of Health and Human Services
$3.9M
KETCHIKAN GATEWAY BOROUGH SCHOOL DISTRICT TRAUMA-INFORMED, CULTURALLY RESPONSIVE SUPPORT SERVICES FOR STUDENTS - STUDENTS IN THE KETCHIKAN GATEWAY BOROUGH SCHOOL DISTRICT (KGBSD) EXPERIENCE TRAUMA AT EXTREMELY HIGH RATES DUE TO REGION SPECIFIC SOCIAL, ECONOMIC, AND CULTURAL CONDITIONS. CHILD SEXUAL ABUSE, CHILD ABUSE AND NEGLECT, EXPOSURE TO DOMESTIC VIOLENCE, INTERGENERATIONAL TRAUMA, AND BULLYING ARE ALL CONCERNS WITHIN THE KGBSD. A DEDICATED FOCUS ON TRAUMA-INFORMED CAPACITY BUILDING DISTRICT WIDE IS NEEDED TO ASSURE THE SUCCESSFUL SUPPORT OF STUDENTS IN THE SCHOOL SYSTEM AND BUILD CAPACITY TO PREVENT TRAUMA AND PROMOTE HEALING IN THE COMMUNITY. THE PROPOSED PROJECT WOULD ALLOW THE SCHOOL DISTRICT TO COLLABORATE WITH PARTNER WOMEN IN SAFE HOMES (WISH): 1. INCREASE THE ACCESSIBILITY OF TRAUMA-INFORMED MENTAL HEALTH SERVICES AND STUDENT SUPPORT; 2. EXPAND THE CAPACITY OF THE KGBSD TO FULLY INTEGRATE TRAUMA-INFORMED POLICIES AND PRACTICES THROUGH STAFF TRAINING; 3. OPERATIONALIZE THE USE OF A COMMON FRAMEWORK FOR TRAUMA-ENGAGED SCHOOLS; AND 4. INCREASE ADMINISTRATIVE OVERSIGHT TO ASSURE COMPLIANCE WITH BEST PRACTICES FOR TRAUMA-INFORMED AND CULTURALLY RESPONSIVE SCHOOL SYSTEMS. THE KGBSD AND WISH HAVE HISTORICALLY PARTNERED TO PROVIDE TRAUMA-INFORMED AND CULTURALLY RESPONSIVE SERVICES FOR STUDENTS AND TRAINING TO EDUCATOR. KGBSD AND WISH CURRENTLY PARTNER TO PROVIDE MENTAL HEALTH SUPPORT SERVICES AVAILABLE TO STUDENTS WHO HAVE EXPERIENCED DOMESTIC VIOLENCE. THE PROPOSED PROGRAM WOULD GREATLY EXPAND THE NUMBER OF STUDENTS ABLE TO ACCESS MENTAL HEALTH SERVICES, AND EXPAND THE CAPACITY OF THE DISTRICT TO PROVIDE SOCIAL WORK SERVICES, EDUCATOR TRAINING, AND FULLY-REALIZE BEING A TRAUMA-ENGAGED SCHOOL DISTRICT. GOALS FOR THE PROGRAM ARE TO 1. EXPAND THE KETCHIKAN GATEWAY BOROUGH SCHOOL DISTRICT’S RELATIONSHIP WITH ORGANIZATIONAL PARTNER WISH AND OTHER LOCAL MENTAL HEALTH SERVICE PROVIDERS AND SERVICE AGENCIES BETTER IDENTIFY, REFER, AND PROVIDE SERVICES TO STUDENTS IMPACTED BY TRAUMA AND THEIR FAMILIES; 2. INCREASE THE CAPACITY OF THE SCHOOL DISTRICT TO IDENTIFY STUDENTS IMPACTED BY TRAUMA AND MENTAL HEALTH STRUGGLES AND PROVIDE THEM WITH ACCESS TO COMPREHENSIVE, LOW BARRIER SUPPORTS AND SERVICES TO IMPROVE THEIR SOCIAL, EMOTIONAL, AND ACADEMIC OUTCOMES OVER THE LIFESPAN; 3. OPERATIONALIZE A DISTRICT WIDE ADMINISTRATIVE PLAN BASED ON THE ALASKA DEPARTMENT OF EDUCATION AND EARLY DEVELOPMENT’S TRANSFORMING SCHOOLS: A FRAMEWORK FOR TRAUMA-ENGAGED PRACTICE IN ALASKA, AND 4. IMPLEMENT A COMPREHENSIVE TRAINING AND OVERSIGHT PLAN. THE PROGRAM WILL UTILIZE TRANSFORMING SCHOOLS: A FRAMEWORK FOR TRAUMA-ENGAGED PRACTICE IN ALASKA (TSF), DEVELOPED BY THE ALASKA DEPARTMENT OF EDUCATION AND EARLY DEVELOPMENT IN 2019. THE EVIDENCE-BASED FRAMEWORK IS A ROADMAP FOR EFFECTIVELY INTEGRATING COMPONENTS TO FULLY-REALIZE BECOMING A TRAUMA-INFORMED SCHOOL SYSTEM THROUGH IMPROVEMENTS IN THE DOMAINS OF: 1. DECONSTRUCTING TRAUMA; 2. RELATIONSHIP BUILDING; 3. POLICY CONSIDERATIONS; 4. PLANNING AND COORDINATION OF SCHOOLWIDE EFFORTS; 5. PLANNING AND COORDINATION OF SCHOOLWIDE EFFORTS; 6. PROFESSIONAL LEARNING; 7. SCHOOLWIDE PRACTICES AND CLIMATE; 7. SKILLS INSTRUCTION; 8. SUPPORT SERVICES; 9. CULTURAL INTEGRATION AND COMMUNITY CO-CREATION; 10. FAMILY PARTNERSHIP; AND 11. SELF-CARE FOR STAFF. THE PROPOSED PROJECT INCLUDES SPECIFIC ACTIVITIES AT THE DIRECT SERVICE, ADMINISTRATIVE, AND SCHOOL-POLICY LEVELS TO ASSURE FULL REALIZATION OF A TRAUMA-ENGAGED SCHOOL, AS DESCRIBED IN THE IMPLEMENTATION PLAN. THE RESULT OF IMPLEMENTING TSF IS A SCHOOL-DISTRICT THAT BUILDS ON EXISTING EFFORTS TO FULLY INTEGRATE TRAUMA-INFORMED AND CULTURALLY RESPONSIVE PRACTICES IN ALL ASPECTS OF OPERATIONS. THE PROGRAM WILL HIRE A PROGRAM DIRECTOR, EVALUATOR, THREE SCHOOL SOCIAL WORKERS AND THREE SCHOOL-BASED MENTAL HEALTH COUNSELORS TO CARRY OUT PROGRAM SERVICES INCLUDING STUDENT SUPPORT SERVICES, SCHOOL STAFF TRAINING AND DEVELOPMENT, ENHANCE COMMUNITY PARTNERSHIPS, AND ENGAGE KGBSD FAMILIES IN ACTIVITIES THAT SUPPORT STUDENT HEALTH, WELLNESS, AND ACHIEVEMENT.
Department of Education
$3.7M
HIGHER EDUCATION EMERGENCY RELIEF FUND PROJECT: COLGATE UNIVERSITY
Department of Transportation
$3.7M
PURPOSE: IMPROVE/MODIFY/REHABILITATE TERMINAL BUILDING. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT IMPROVES THE EXISTING TERMINAL BUILDING PASSENGER AREAS TO INCREASE PASSENGER CAPACITY. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Education
$3.6M
PROJECT R.A.V.E. (RURAL ALASKA VILLAGE ENTREPRENEURS)WILL DEVELOP HIGH SKILLED EMPLOYEES FOR HIGH PAYING JOBS THAT EXIST IN VILLAGE ALASKA.
Department of Veterans Affairs
$3.1M
VA IS PROVIDING PER DIEM FUNDING TO ASSIST WITH THE OPERATIONAL COSTS ASSOCIATED WITH TRANSITIONAL HOUSING BEDS FOR HOMELESS VETERANS.
Department of Veterans Affairs
$3.1M
VA IS PROVIDING PER DIEM FUNDING TO ASSIST WITH THE OPERATIONAL COSTS ASSOCIATED WITH TRANSITIONAL HOUSING BEDS FOR HOMELESS VETERANS.
Department of Commerce
$3M
THIS EDA INVESTMENT SUPPORTS THE MOUNTAIN GATEWAY COMMUNITY COLLEGE REAL ESTATE FOUNDATION WITH RENOVATING A WORKFORCE DEVELOPMENT CENTER TO SERVICE A COMMUNITY IMPACTED BY THE DECLINING USE OF COAL IN CLIFTON FORGE, VIRGINA. THE PROJECT WILL SUPPORT THE ESTABLISHMENT OF A MANUFACTURING TRAINING CENTER TO MEET LOCAL EMPLOYERS' EXISTING AND FUTURE WORKFORCE NEEDS, AS WELL AS AN ENTREPRENEURIAL INNOVATION LABORATORY. ONCE COMPLETED, THE PROJECT WILL HELP THE REGION CREATE NEW JOB OPPORTUNITIES TO BOOST ECONOMIC DEVELOPMENT, DIVERSIFY THE LOCAL ECONOMY, AND ADVANCE ECONOMIC RESILIENCY.
National Science Foundation
$3M
THE GOLDEN GATE BRIDGE AS AN INFORMAL SCIENCE EDUCATION RESOURCE
Department of Health and Human Services
$2.9M
GATEWAY COMMUNITY SERVICE ORGANIZATION PATHWAYS TO RESPONSIBLE FATHERHOOD PROGRAM
Department of the Interior
$2.9M
FEE MANAGEMENT AGREEMENT GGNPC MUIR WOODS GOGA
Department of Labor
$2.7M
TRADE ADJUSTMENT ASSISTANCE COMMUNITY COLLEGE AND CAREER TRAINING
Department of Health and Human Services
$2.6M
DEVELOPMENT OF HIGH-THROUGHPUT COMMERCIALLY VIABLE CELL-CT INSTRUMENT WITH INIT
Department of Veterans Affairs
$2.6M
VA IS PROVIDING PER DIEM FUNDING TO ASSIST WITH THE OPERATIONAL COSTS ASSOCIATED WITH TRANSITIONAL HOUSING BEDS FOR HOMELESS VETERANS.
Department of Health and Human Services
$2.6M
GATEWAY CCBHC EXPANSION GRANT - THE PROPOSED PROJECT WILL BE TARGETING VULNERABLE, LOW-INCOME INDIVIDUALS AND FAMILIES WITH SEVERE MENTAL ILLNESS, SEVERE SUBSTANCE USE DISORDERS AND CO-OCCURRING DISORDERS, AND WITH PRIMARY HEALTH NEEDS IN THE GREATER JACKSONVILLE, FLORIDA AREA. BY BECOMING A CERTIFIED COMMUNITY BEHAVIORAL HEALTH CLINIC, GATEWAY WILL INCREASE ACCESS TO BEHAVIORAL AND PRIMARY HEALTH CARE TO IMPROVE THE QUALITY OF COMMUNITY MENTAL AND SUBSTANCE USE DISORDER TREATMENT SERVICES. THESE SERVICES WILL PRIMARILY BE PROVIDED IN DUVAL COUNTY, FLORIDA AT 555 STOCKTON STREET, JACKSONVILLE, FLORIDA 32204 WHILE SOME MENTAL HEALTH AND PRIMARY HEALTH SERVICES WILL BE PROVIDED AT DESIGNATED COLLABORATING ORGANIZATIONS IN THE COUNTY. TRANSPORTATION WILL BE PROVIDED TO AND FROM THESE SERVICE LOCATIONS TO DECREASE THE BARRIER OF ACCESS AND TRANSPORTATION. THE PRIMARY PURPOSE OF THIS PROJECT IS TO ENHANCE ACCESS TO INTEGRATED BEHAVIORAL AND PRIMARY HEALTH SERVICES TO THOSE WITH THE MOST SEVERE MENTAL ILLNESS, SEVERE SUBSTANCE USE DISORDERS AND CO-OCCURRING PRIMARY HEALTH DISORDERS WHO ARE IN NEED OF TREATMENT AND RECOVERY SERVICES IN JACKSONVILLE, FLORIDA. GATEWAY CURRENTLY SERVES AROUND 300 PATIENTS A YEAR THROUGH ITS OUTPATIENT PROGRAM. AS A CCBHC AND WITH ITS DCOS, GATEWAY EXPECTS TO SERVE AN ADDITIONAL 600-900 PATIENTS’ A YEAR TOTALING 1200 – 1600 PATIENTS OVER THE ENTIRE PROJECT PERIOD. THIS EXPANSION GRANT WILL ALLOW GATEWAY TO PROVIDE ADDITIONAL OUTPATIENT BEHAVIORAL HEALTH SERVICES ONSITE AND PROVIDE PHYSICAL HEALTH SERVICES IN PARTNERSHIP WITH AN FQHC. THE PROPOSED PROJECT ALIGNS EXISTING EFFORTS TO EFFICIENTLY AND EFFECTIVELY USE RESOURCES TO SERVE THE MOST VULNERABLE INDIVIDUALS IN OUR AREA.
Department of Housing and Urban Development
$2.6M
HOME INVESTMENT PARTNERSHIPS PROGRAM
Department of Health and Human Services
$2.5M
HIGH IMPACT PROJECT FOR MEN (HIP MEN)
Department of Health and Human Services
$2.5M
HEALTHY, SAFE AND SOBER - THE HEALTHY, SAFE AND SOBER (HSS) PROGRAM WILL TAKE PLACE IN THE LOCALITY OF DUVAL COUNTY, FLORIDA – A RECOGNIZED AREA HARDEST HIT BY THE HIV PANDEMIC. THE PURPOSE OF THIS PROGRAM IS TO INCREASE ENGAGEMENT IN CARE FOR RACIAL AND ETHNIC UNDERREPRESENTED INDIVIDUALS WITH SUBSTANCE USE DISORDERS (SUD) AND/OR CO-OCCURRING SUBSTANCE USE AND MENTAL HEALTH DISORDERS (COD) WHO ARE AT RISK FOR, OR ARE LIVING WITH HIV/AIDS AND RECEIVE HIV/AIDS SERVICES/TREATMENT. THE IDENTIFIED POPULATIONS OF FOCUS INCLUDE RACIAL AND ETHNIC UNDERREPRESENTED INDIVIDUALS WITH A SUBSTANCE USE (SUD) OR CO-OCCURRING DISORDER (COD) WHO ARE AT RISK FOR, OR WHO ARE LIVING WITH HIV/AIDS. SPECIFICALLY, THE PROGRAM WILL TARGET YOUNG INDIVIDUALS, AGES 18-29, WHO IDENTIFY AS LGBTQ+, AND WHO MEET THE ABOVE CRITERIA. DUVAL COUNTY RANKS 5TH IN THE STATE FOR NEW HIV CASES. OF THE 6,566 LIVING WITH HIV IN 2020, ONLY 83% WERE LINKED TO CARE, 74% REMAINED IN CARE, AND 64% WERE VIRALLY SUPPRESSED. SERVICE GAPS INCLUDE THE NEED FOR CASE MANAGEMENT, CARE COORDINATION, AND TREATMENT FOR SUD/CODS TO PROMOTE TREATMENT ADHERENCE AND ACCESS TO CARE TO LOWER UNSAFE BEHAVIORS AND INCREASE THE PERCENTAGE OF INDIVIDUALS LIVING WITH HIV THAT ARE VIRALLY SUPPRESSED. THE HSS PROGRAM IS THE ONLY SUBSTANCE USE AND MENTAL HEALTH PROGRAM IN DUVAL COUNTY OFFERING COMPREHENSIVE, COORDINATED SUD/COD CARE WITH HIV PROVIDERS IN THE AREA. THE PROGRAM WILL SERVE APPROXIMATELY 205 UNDUPLICATED INDIVIDUALS THROUGHOUT THE ENTIRE GRANT WITH 35 BEING SERVED IN YEAR ONE AND FIVE AND 45 BEING SERVED IN YEARS TWO THROUGH FOUR. THE HEALTHY, SAFE AND SOBER PROGRAM IS INFORMED BY LOCAL, STATE AND NATIONAL NEEDS ASSESSMENTS, AND LOCAL, STATE AND NATIONAL LEVEL GOALS AND OBJECTIVES. THE STATEMENT OF NEED IDENTIFIES THE FOLLOWING GAPS IN SERVICE AND NEEDS FOR SERVICE ENHANCEMENT FOR THE TARGET POPULATION: 1) INCREASED TREATMENT CAPACITY FOR SUD/COD FOR INDIVIDUALS LIVING WITH OR AT RISK OF CONTRACTING HIV; 2) NEED FOR SUPPORTIVE, AFFORDABLE AND SOBER HOUSING TO INCREASE TREATMENT ADHERENCE AND VIRAL SUPPRESSION; AND 3) NEED FOR INCREASED CARE COORDINATION, CASE MANAGEMENT, AND PEER SERVICES TO COORDINATE CARE ACROSS THE NETWORK ENSURING HIGHER RATES OF ENGAGEMENT IN SERVICES AND INCREASE POSITIVE OUTCOMES. OVERARCHING GOAL: IMPROVE HIV-RELATED HEALTH OUTCOMES FOR RACIAL AND ETHNIC MINORITY COMMUNITIES WITH SUD/COD, SPECIFICALLY YOUNG LGBTQ MINORITY INDIVIDUALS ACROSS THE SEXUAL AND GENDER SPECTRUM WITHIN THE GEOGRAPHIC CATCHMENT AREA.
Department of Health and Human Services
$2.5M
READY4LIFE YOUTH GRANT - GATEWAY COMMUNITY SERVICE ORGANIZATION WILL IMPLEMENT THE READY4LIFE INITIATIVE ACROSS NINE RURAL KENTUCKY COUNTIES TO PROVIDE HIGH SCHOOL STUDENTS (GRADES 9-12) WITH ESSENTIAL EDUCATION ON THE VALUE OF MARRIAGE, RELATIONSHIP SKILLS, AND BUDGETING/FINANCIAL MANAGEMENT. THE PROGRAM WILL DELIVER 18 HOURS OF EVIDENCE-BASED CURRICULUM THROUGH REAL ESSENTIALS ADVANCE (12 HOURS) AND MONEY SMART FOR YOUNG PEOPLE (6 HOURS), COMPLEMENTED BY INDIVIDUALIZED CASE MANAGEMENT AND COMMUNITY RESOURCE CONNECTIONS. IN PARTNERSHIP WITH KENTUCKY RIVER FOOTHILLS DEVELOPMENT COUNCIL, THE PROGRAM WILL SERVE 100 YOUTH IN YEAR 1 AND 200 YOUTH ANNUALLY IN YEARS 2-5, REACHING STUDENTS IN PUBLIC, PRIVATE, AND ALTERNATIVE SCHOOLS. THIS COMPREHENSIVE APPROACH ADDRESSES THE REGION'S HIGH POVERTY, UNEMPLOYMENT, AND RELATIONSHIP INSTABILITY WHILE SUPPORTING POSITIVE SOCIOEMOTIONAL DEVELOPMENT AND SUCCESSFUL TRANSITIONS TO ADULTHOOD.
Department of Agriculture
$2.5M
PROVIDE TECHNICAL ASSISTANCE AND FINANCIAL/BUSINESS SUPPORT TO FARMERS TO INCREASE CAPITAL AND MARKET ACCESS.
Department of Education
$2.5M
RURAL ALASKA VILLAGE ENTREPRENEURS INSTRUCTIONAL INNOVATION (RAVE II)
Department of Transportation
$2.5M
APPLICATION PURPOSE: THE GOLDEN GATE FERRY (GGF) PROVIDES ESSENTIAL PUBLIC TRANSPORTATION BETWEEN MARIN COUNTY AND SAN FRANCISCO SERVING AS A KEY LINK IN THE BAY AREAS REGIONAL TRANSIT NETWORK.GGF FERRIES OFFER AN ENVIRONMENTALLY FRIENDLY ALTERNATIVE TO AUTOMOBILE TRAVEL REDUCING CONGESTION ON U.S. HIGHWAY 101 AND THE GOLDEN GATE BRIDGE. THESE SERVICES ARE FURTHER ENHANCED BY STRONG INTERMODAL CONNECTIONS TO BART SMART MUNI CALTRAIN AND REGIONAL BUS SERVICES.THE FUNDING WILL BE APPLIED TO SALARIES AND FRINGE BENEFITS FUEL MAINTENANCE AND REPAIR SUPPLIES AND OTHER OPERATIONAL NECESSITIES TO ENSURE ONGOING OPERATION OF GOLDEN GATE FERRY SERVICE.; ACTIVITIES PERFORMED: THE FERRY BOAT PROGRAM (FBP) FUNDS WILL BE USED TO SUPPORT ELIGIBLE OPERATIONAL ACTIVITIES THAT ARE ESSENTIAL TO MAINTAINING GOLDEN GATE FERRY (GGF) SERVICE BETWEEN MARIN COUNTY AND SAN FRANCISCO DURING FISCAL YEAR 2025/2026. SPECIFICALLY THE FOLLOWING ACTIVITIES WILL BE PERFORMED:DURING FY 2025/2026 THE FOLLOWING OPERATIONAL ACTIVITIES WILL BE SUPPORTED BY FBP FUNDS:STAFFING AND PERSONNELA PORTION OF SALARIES AND FRINGE BENEFITS FOR FERRY OPERATIONS STAFF INCLUDING DECKHANDS ENGINEERS TERMINAL STAFF AND SUPERVISORS WILL BE FUNDED TO MAINTAIN DAILY SERVICE RELIABILITY.FUEL PROCUREMENTTHE PROJECT WILL FUND A PORTION OF THE DIESEL FUEL COSTS REQUIRED TO OPERATE GGF VESSELS ONE OF THE MOST SIGNIFICANT ONGOING OPERATIONAL EXPENDITURES.REPAIR AND MAINTENANCE SUPPLIESFBP FUNDS WILL BE APPLIED TO ESSENTIAL REPAIR PARTS TOOLS LUBRICANTS AND SAFETY EQUIPMENT REQUIRED TO KEEP VESSELS IN A STATE OF GOOD REPAIR AND PREVENT SERVICE DISRUPTIONS.INSURANCE PERMITS AND COMPLIANCE COSTSTHE FUNDING WILL ALSO SUPPORT COMPLIANCE-RELATED OPERATIONAL COSTS INCLUDING INSURANCE PREMIUMS AND REGULATORY FEES NECESSARY TO ENSURE LAWFUL FERRY OPERATIONS.THESE ACTIVITIES ENSURE ALIGNMENT WITH FHWAS OPERATIONAL COST ELIGIBILITY GUIDELINES AND DIRECTLY SUPPORT UNINTERRUPTED SAFE AND EFFICIENT FERRY SERVICE THROUGHOUT FY 2026.; EXPECTED OUTCOMES: THIS PROJECT WILL PRODUCE SEVERAL CLEAR AND MEASURABLE OUTCOMES DURING FISCAL YEAR 2025/2026:REDUCED FY 2026 OPERATING DEFICITBY APPLYING $2495498 IN FEDERAL FUNDING THE DISTRICT WILL REDUCE THE ANTICIPATED SHORTFALL WITHIN THE $61093700 OPERATING BUDGET AND MAINTAIN FINANCIAL STABILITY.SERVICE CONTINUITYTHE FUNDING ENSURES UNINTERRUPTED FERRY SERVICE ALONG KEY ROUTES CONNECTING MARIN AND SAN FRANCISCO COUNTIES PRESERVING PUBLIC ACCESS AND RELIABILITY.MULTIMODAL CONNECTIVITYGGF PLAYS AN INTEGRAL ROLE IN THE REGIONS MULTIMODAL SYSTEM. CONTINUED SERVICE PRESERVES CONNECTIONS TO REGIONAL RAIL BUS AND FERRY SERVICES ACROSS THE BAY AREA.ENVIRONMENTAL AND CONGESTION BENEFITSSUSTAINING FERRY OPERATIONS HELPS REDUCE SINGLE-OCCUPANCY VEHICLE TRIPS SUPPORTING CLIMATE GOALS REDUCING EMISSIONS AND ALLEVIATING CONGESTION ON THE GOLDEN GATE BRIDGE AND REGIONAL FREEWAYS.POST-PANDEMIC RIDERSHIP RECOVERYTHE PROJECT HELPS ENSURE GGF REMAINS A TRUSTED AND VIABLE TRANSPORTATION OPTION AS RIDERSHIP CONTINUES TO RECOVER FROM PANDEMIC-RELATED DECLINES.; INTENDED BENEFICIARIES: THE PRIMARY BENEFICIARIES OF THIS PROJECT ARE THE PASSENGERS WHO RELY ON GOLDEN GATE FERRY (GGF) SERVICES FOR SAFE RELIABLE AND EFFICIENT TRAVEL BETWEEN MARIN COUNTY AND SAN FRANCISCO. THESE INCLUDE:COMMUTERSTHOUSANDS OF BAY AREA RESIDENTS DEPEND ON GGF FOR DAILY TRAVEL TO AND FROM EMPLOYMENT CENTERS IN DOWNTOWN SAN FRANCISCO. THE SERVICE OFFERS A CONGESTION-FREE ALTERNATIVE TO AUTOMOBILE TRAVEL ACROSS THE GOLDEN GATE BRIDGE REDUCING STRESS TIME LOST IN TRAFFIC AND THE NEED FOR EXPENSIVE PARKING IN THE CITY.TOURISTS AND VISITORSGGF ALSO SERVES THE TOURISM ECONOMY BY PROVIDING SCENIC DIRECT ACCESS BETWEEN MAJOR ATTRACTIONS IN SAN FRANCISCO AND DESTINATIONS IN MARIN COUNTY SUCH AS SAUSALITO. RELIABLE FERRY OPERATIONS ENHANCE THE VISITOR EXPERIENCE AND SUPPORT LOCAL BUSINESSES THAT DEPEND ON TOURISM.LOW- AND MODERATE-INCOME RIDERSTHE CONTINUATION OF FERRY SERVICE ENSURES THAT RESIDENTS WHO MAY NOT HAVE ACCESS TO A PRIVATE VEHICLE OR WHO FACE FINANCIAL CONSTRAINTS CONTINUE TO BENEFIT FROM PUBLIC TRANSPORTATION THAT CONNECTS THEM TO JOBS EDUCATION HEALTH CARE AND RECREATIONAL OPPORTUNITIES.REGIONAL TRANSIT USERSGGF IS AN INTEGRAL PART OF THE REGIONS INTERCONNECTED TRANSIT NETWORK. RIDERS WHO TRANSFER FROM SMART BART CALTRAIN MUNI AND GOLDEN GATE TRANSIT BUSES BENEFIT FROM PRESERVED INTERMODAL CONNECTIVITY THAT EXTENDS ACCESS ACROSS COUNTY LINES AND IMPROVES SYSTEM-WIDE MOBILITY.BAY AREA COMMUNITIES AND THE ENVIRONMENTBY REDUCING RELIANCE ON SINGLE-OCCUPANCY VEHICLES THE PROJECT BENEFITS THE BROADER PUBLIC THROUGH DECREASED ROADWAY CONGESTION REDUCED VEHICLE EMISSIONS AND IMPROVED AIR QUALITY. THESE OUTCOMES ALIGN WITH STATE AND REGIONAL CLIMATE AND TRANSPORTATION POLICY GOALS.IN SUM THIS PROJECT WILL BENEFIT A WIDE CROSS-SECTION OF THE BAY AREA POPULATION IMPROVING MOBILITY EQUITY AND ENVIRONMENTAL OUTCOMES WHILE SUSTAINING A VITAL PUBLIC SERVICE.; SUBRECIPIENT ACTIVITIES: NONE.
Department of Health and Human Services
$2.4M
ALABAMA TRAUMA SYSTEMS TREATMENT AND TRAINING INITIATIVE (ATSTTI) - GATEWAY’S ALABAMA TRAUMA SYSTEMS TREATMENT AND TRAINING INITIATIVE (ATSTTI) WILL INCREASE ACCESS TO MENTAL HEALTH SERVICES, LEGAL ASSISTANCE, AND OTHER ESSENTIAL SUPPORT TO MORE THAN 500 FAMILIES WITH CHILDREN AND YOUTH AGES 4-21 WITH TRAUMA EXPERIENCES WHO ARE AT RISK OF OR ARE CURRENTLY PLACED IN OUT-OF-HOME CARE BY THE ALABAMA DEPARTMENT OF HUMAN RESOURCES (DHR). ATSTTI WILL TRIPLE THE NUMBER OF MULTI-DISCIPLINARY TEAMS (MDT) PROVIDING EVIDENCED-BASED TRAUMA SERVICES THERAPY (TST) WHILE EDUCATING MORE THAN 900 CRUCIAL PARTNER STAFF AND CAREGIVERS, INCLUDING EDUCATORS, FOSTER PARENTS, AND DHR PERSONNEL. ATSTTI WILL OPERATE IN THE DHR REGIONS OF JEFFERSON/SHELBY, EAST CENTRAL, NORTHEAST, NORTHWEST, SOUTHWEST, AND TUSCALOOSA HUB. ATSTTI’S OVERARCHING GOAL IS TO IMPROVE THE LIVES OF FOSTER CHILDREN BY INCREASING FAMILY PRESERVATION, DECREASING MULTIPLE FOSTER CARE PLACEMENTS, AND IMPROVING THE QUALITY OF TRANSITIONS OUT OF FOSTER CARE. BUILDING ON THE SUCCESS OF THE FIRST TST-TRAINED MDT THROUGH A PARTNERSHIP WITH THE TRAUMA SYSTEMS THERAPY TRAINING CENTER AT NEW YORK UNIVERSITY (NYU) LANGONE’S DEPARTMENT OF CHILD AND ADOLESCENT PSYCHIATRY, GATEWAY WILL EXPAND ITS TST SERVICES AND MAKE AVAILABLE NYU’S RECENTLY RELEASED CURRICULUM FOR TRAINING ADULTS IN THE TRAUMA SYSTEM, NEVER LOOK AWAY (NLA). TST AND NLA FOCUS ON ALLEVIATING TRAUMA DISTRESS IN A CHILD’S LIFE BY ESTABLISHING THE CHILD’S EXPERIENCE OF SAFETY IN THEIR ENVIRONMENT. THE GOALS AND OBJECTIVES OF THE ATSTTI ARE AS FOLLOWS: GOAL #1 – INCREASE ACCESS TO AND ENROLLMENT IN EVIDENCE-BASED, TRAUMA-INFORMED TREATMENT (TRAUMA SYSTEMS THERAPY) FOR DISPROPORTIONATELY DISADVANTAGED CHILDREN AND YOUTH. OBJECTIVE #1 – INCREASE THE NUMBER OF CHILDREN SERVED BY THE EXISTING GATEWAY TST MULTI-DISCIPLINARY TEAM BY 25% IN YEAR 1 (FROM 11 TO 14), TOGETHER WITH THEIR FAMILIES, FOR A TOTAL OF 43 ADDITIONAL PEOPLE SERVED. OBJECTIVE #2 – INCREASE THE NUMBER OF MDTS AT GATEWAYFROM ONE EXISTING TEAM TO THREE BY YEAR 3, WITH A CORRESPONDING INCREASE BY YEAR 5 IN TOTAL CHILDREN AND ADULTS SERVED FROM 23 TO 519. GOAL #2 – IMPROVE OUTCOMES IN CHILDREN SERVED THROUGH IMPLEMENTING TRAUMA SYSTEMS THERAPY WITH FIDELITY. OBJECTIVE #1 – BY THE END OF YEAR 3, ESTABLISH AND MAINTAIN EFFECTIVE IMPLEMENTATION OF TST WITH FIDELITY. OBJECTIVE #2 – CHILDREN ENROLLED IN ATSTTI WILL DEMONSTRATE IMPROVED OUTCOMES MEASURED BY DECREASED FOSTER CARE PLACEMENT DISRUPTIONS, FEWER SCHOOL SUSPENSIONS AMONG FOSTER CHILDREN, INCREASED POSITIVE DISCHARGES FROM FOSTER CARE, INCREASED REUNIFICATIONS OF CHILDREN RETURNING HOME FROM FOSTER CARE, AND 90% SUCCESS WITH CHILDREN REMAINING IN THEIR BIOLOGICAL FAMILIES (FAMILY PRESERVATION). GOAL #3 – HELP KEY ADULTS (FOSTER PARENTS, SCHOOL PERSONNEL, AND DHR STAFF) GAIN AN UNDERSTANDING OF THE PREVALENCE AND IMPACT OF TRAUMATIC EXPERIENCES ON CHILDREN’S DEVELOPMENT, REALIZE THE WAYS THEY MAY BE UNKNOWINGLY RETRAUMATIZING CHILDREN IN THE TARGET POPULATION, AND UNDERSTAND THE ROLE THEY CAN PLAY IN HELPING CHILDREN RECOVER FROM TRAUMA. OBJECTIVE #1 – FORM AN ADVISORY COUNCIL FOR ATSTTI (AAC) COMPOSED OF FOSTER PARENTS, EDUCATORS, DHR STAFF, FORMER FOSTER YOUTH, BIOLOGICAL FAMILY MEMBERS, AND COMMUNITY LEADERS. OBJECTIVE #2 – TRAIN MORE THAN 95 FOSTER PARENTS IN NYU’S NEVER LOOK AWAY CURRICULUM TO RECOGNIZE TRAUMA AND AVOID RETRAUMATIZING. OBJECTIVE #3 – TRAIN MORE THAN 200 DHR STAFF SERVING CHILDREN IN THE PROJECT IN NYU’S NEVER LOOK AWAY CURRICULUM IN RECOGNIZING TRAUMA, AVOIDING RETRAUMATIZING AND ACCESSING TRAUMA-INFORMED CARE. OBJECTIVE #4 – TRAIN MORE THAN 600 TEACHERS AND OTHER KEY SCHOOL PERSONNEL IN NYU’S NEVER LOOK AWAY CURRICULUM IN JEFFERSON, SHELBY, AND BLOUNT COUNTY SCHOOLS THROUGH ONSITE AND REMOTE TRAINING SESSIONS IN UNDERSTANDING TRAUMA, HOW TO AVOID RETRAUMATIZING, AND HOW TO ACCESS TRAUMA-INFORMED CARE.
Department of Labor
$2.3M
TRADE ADJUSTMENT ASSISTANCE COMMUNITY COLLEGE AND CAREER TRAINING
Department of Agriculture
$2.3M
EMERGENCY WATERSHED PROTECTION 2005 HURRICANE
Department of Veterans Affairs
$2.3M
VA IS PROVIDING PER DIEM FUNDING TO ASSIST WITH THE OPERATIONAL COSTS ASSOCIATED WITH TRANSITIONAL HOUSING BEDS FOR HOMELESS VETERANS.
Department of Health and Human Services
$2.3M
THE RIGHT PROJECT: RE-ENTRY INTERVENTIONS GENERATING HEALTH AND TREATMENT
Department of Education
$2.3M
STRENGTHENING INSTITUTIONS TITLE III GRANT: THE ROAD TO STUDENT SUCCESS
Department of Health and Human Services
$2.2M
TARGETING MULTIPLE SIGNALING PATHWAYS FOR TINNITUS PREVENTION AND TREATMENT
Source: Federal Audit Clearinghouse (fac.gov)
Federal audit data is temporarily unavailable.
Single audits are required for entities expending $750,000+ in federal awards annually.
Source: IRS e-Filed Form 990
No officer or director compensation data available for this organization.
This data is sourced from IRS Form 990, Part VII. It may not be available if the organization files Form 990-N (e-Postcard) or has not yet been enriched.
Source: IRS Publication 78, Auto-Revocation List & e-Postcard Data
Tax-deductible contributions: Yes
Deductibility code: PC
Organizations with annual gross receipts of $50,000 or less file the simplified Form 990-N instead of a full Form 990. These filings contain minimal financial data and are not included in ProPublica's database.
View on ProPublica Nonprofit Explorer →Federal grants: USAspending.gov (live)
Organization info: IRS Business Master File · ProPublica Nonprofit Explorer
Tax-deductibility: IRS Publication 78