Loading organization details...
Loading organization details...
Source: IRS e-Filed Form 990 (from the IRS e-File system), Tax Year 2024
Total Revenue
▼$814.9K
Program Spending
90%
of total expenses go to program services
Total Contributions
$802.5K
Total Expenses
▼$628.2K
Total Assets
$750.5K
Total Liabilities
▼$0
Net Assets
$750.5K
Officer Compensation
→N/A
Other Salaries
N/A
Investment Income
$12.4K
Fundraising
▼N/A
Source: USAspending.gov · Searched by organization name
Total Federal Funding (partial)
$19.5B
Awards Found
200+
Additional awards may exist. View all on USAspending.gov →
| Awarding Agency | Description | Amount | Fiscal Year | Period |
|---|---|---|---|---|
| Department of Transportation | PROJECT TITLE: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B DESIGN CM/GC PROJECT :::: PROJECT DESCRIPTION: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B DESIGN CM/GC PROJECT | $400M | — | — – Mar 2032 |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 | $300M | — | — – Jun 2028 |
| Department of Transportation | IN SHA CO NR LAKEHEAD AT SACTO RVR,BR#06-0089 , REPLACE BRIDGE | $270.4M | FY2009 | Sep 2009 – Sep 2010 |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2023-24 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2023-24 | $258.9M | — | — – — |
| Department of Transportation | STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2011-16 (TC) | $254.5M | FY2015 | Jun 2015 – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2022-23 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2022-23 | $243.8M | — | — – Jun 2026 |
| Department of Transportation | SM CO NEAR PACIFIC ON RT 1 S/O LINDA MAR BLVD, CONSTRUCT TUNNELS, APPROACH RO | $236.4M | FY2012 | Mar 2012 – — |
| Department of Transportation | 06/STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2014-15 (TC) | $235.5M | FY2014 | Jun 2014 – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2021-22 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2021-22 | $225.1M | — | — – — |
| Department of Transportation | STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2017-18 (TC) | $223.4M | — | — – — |
| Department of Transportation | IN THE CITY OF LONG BEACH AT THE GERALD DESMOND BRIDGE, BRIDGE REPLACEMENT | $220M | FY2013 | Sep 2013 – — |
| Department of Transportation | PROJECT TITLE: RIVERSIDE COUNTY ON ROUTE 10 NEAR COACHELLA FROM 1.8 MILES EAST OF DILLON ROAD UNDERCROSSING TO 0.53 MILES WEST OF EAST CACTUS CITY UNDERCROSSING. RE :::: PROJECT DESCRIPTION: RIVERSIDE COUNTY ON ROUTE 10 NEAR COACHELLA FROM 1.8 MILES EAST OF DILLON ROAD UNDERCROSSING TO 0.53 MILES WEST OF EAST CACTUS CITY UNDERCROSSING. REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS (DESIGN BUILD) | $194.5M | — | — – — |
| Department of Transportation | FROM PM 0.43 S/O LA-10 TO VENTURA BL. , WIDEN FOR HOV LANE | $189.9M | FY2009 | Apr 2009 – Apr 2010 |
| Department of Transportation | STATEWIDE , STATEWIDE PRELIM ENGINEERING SYS | $189M | FY2008 | Jul 2008 – Sep 2010 |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 | $188.8M | FY2025 | Jun 2025 – Jun 2029 |
| Department of Transportation | STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2018-19 | $187.9M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS. | $184M | FY2022 | Sep 2022 – Apr 2029 |
| Department of Transportation | PROJECT TITLE: LOS ANGELES COUNTY, ROUTE 14, POSTMILE R60.7/R77.0. IN AND NEAR PALMDALE AND LANDCASTER, FROM AVENUE P-8 TO THE KERN COUNTY LINE. REPLACE DISTRESSED :::: PROJECT DESCRIPTION: ON STATE ROUTE: 14. LOS ANGELES COUNTY, ROUTE 14, POSTMILE R60.7/R77.0. IN AND NEAR PALMDALE AND LANDCASTER, FROM AVENUE P-8 TO THE KERN COUNTY LINE. REPLACE DISTRESSED LANES/SHOULDERS, COLD PLANE AND OVERLAY RAMPS, UPGRADE GUARDRAIL, DIKES, SIGN PANELS, CURB RAMPS AND TRAFFIC LOOP DETECTORS REPLACE DISTRESSED SLABS WITH PRECAST CONCRETE PANELS. PLACE A BOND BREAKER BETWEEN THE UNDERLYING BASE AND NEW SLAB PAVEMENT. COLD PLANE AND OVERLAY ALONG THE TRAVEL LANES AND SHOULDERS. REPLACE ALL AFFECTED TRAFFIC LOOP DETECTORS. RECONSTRUCT GORE AREAS AND REMOVE EXISTING CURBED NOSES WITH THE SAME STRUCTURAL SECTION AS THE ADJACENT SHOULDER PAVEMENT. UPGRADE EXISTING CURB RAMPS TO CURRENT AMERICAN WITH DISABILITIES ACT (ADA) STANDARDS AND CONSTRUCT NEW ADA ACCESS AT ALL RAMP MODIFICATIONS WHERE PEDESTRIAN ACCESS EXITS. UPGRADE METAL BEAM GUARDRAIL AND END TREATMENTS THAT ARE SHORTER THAN 27 3/4 INCHES TALL TO THE NEW MIDWEST GUARDRAIL SYSTEM. REPLACE FADED ROADSIDE SIGNS WITH NEW SIGNS WHERE NEEDED AT MAINLINE AND RAMPS. UPGRADE EXISTING HIGHWAY LIGHTING SYSTEMS AND OVERHEAD SIGN LIGHTING WITH NEW ENERGY EFFICIENT LIGHTING AND THEFT-RESISTANCE PULL BOXES TO IMPROVE SYSTEM RELIABILITY. | $180.9M | — | — – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2020-21 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2020-21 | $177.9M | — | — – — |
| Department of Transportation | LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE, SCHYULER HEIM BRIDGE REPLACEMENT (TC) | $177.1M | FY2011 | Sep 2011 – — |
| Department of Transportation | PROJECT TITLE: ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HI :::: PROJECT DESCRIPTION: ON STATE ROUTE: 405. ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HIGHWAY WORKER SAFETY, UPGRADE SAFETY DEVICES, AND UPGRADE TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS. THIS IS A DESIGN-BUILD PROJECT. | $175.4M | — | — – Jan 2029 |
| Department of Transportation | IN AND THROUGH BAKERSFIELD FROM I-5 TO SR 58 AT COTTONWOOD - CENTENNIAL CORRIDOR, R/W AQUISITION (TC) | $165M | FY2014 | Feb 2014 – — |
| Department of Transportation | STATEWIDE , STATEWIDE PRELIM ENGINEERING SYS | $163.3M | FY2008 | Jul 2008 – Jun 2010 |
| Department of Transportation | RTE 5/10 SEPERATION TO 0.2 KM EAST OF RTE 605 , AC PAVEMENT, SHOULDERS, & RAMPS | $159.3M | FY2009 | Feb 2009 – May 2010 |
| Department of Transportation | PROJECT TITLE: IN SISKIYOU COUNTY AT AND NEAR DUNSMUIR FROM CENTRAL DUNSMUIR UNDERCROSSING TO BLACK BUTTE OVERHEAD. PAVEMENT REHABILITATION AND DECK REPLACEMENT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN SISKIYOU COUNTY AT AND NEAR DUNSMUIR FROM CENTRAL DUNSMUIR UNDERCROSSING TO BLACK BUTTE OVERHEAD. PAVEMENT REHABILITATION AND DECK REPLACEMENT | $151.4M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN RIVERSIDE AND SAN BERNARDINO COUNTIES FROM 1.2 MILE SOUTH OF CANTU-GALLEANO RANCH RD OVERCROSSING IN EASTVALE TO 1.0 MILE NORTH OF BASELINE AVE OV :::: PROJECT DESCRIPTION: ON STATE ROUTE: 15. IN RIVERSIDE AND SAN BERNARDINO COUNTIES FROM 1.2 MILE SOUTH OF CANTU-GALLEANO RANCH RD OVERCROSSING IN EASTVALE TO 1.0 MILE NORTH OF BASELINE AVE OVERCROSSING IN FONTANA ADD ONE TO TWO EXPRESS LANES IN EACH DIRECTION BETWEEN CANTU-GALLEANO RANCH ROAD AND FOOTHILL BOULEVARD, ONE AUXILIARY LANE IN EACH DIRECTION BETWEEN SR-60 AND I-10 | $148.7M | — | — – — |
| Department of Transportation | RT. 10 : FROM CITRUS AVE. TO RT. 57, CONSTRUCT HOV LANE IN BOTH DIRECTIONS | $148.6M | FY2015 | Aug 2015 – — |
| Department of Transportation | PROJECT TITLE: IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS | $134.9M | — | — – — |
| Department of Transportation | PROJECT TITLE: PLACER COUNTY ABOUT 9.4 MILES NORTH OF COLFAX FROM 0.5 MILES WEST OF MONTE VISTA OVERCROSSING TO 0.3 MILES EAST OF DRUM FOREBAY OVERCROSSING RDWY EXC :::: PROJECT DESCRIPTION: ON STATE ROUTE: 80. PLACER COUNTY ABOUT 9.4 MILES NORTH OF COLFAX FROM 0.5 MILES WEST OF MONTE VISTA OVERCROSSING TO 0.3 MILES EAST OF DRUM FOREBAY OVERCROSSING RDWY EXC,HMA,JPCP, ALT PIPELINER, STEEL SOLDIER PILE, MOD LTG SYSTEM. | $134.9M | — | — – Dec 2029 |
| Department of Transportation | STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2013-14 | $134.1M | FY2013 | Jun 2013 – — |
| Department of Transportation | PROJECT TITLE: YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 50. YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE BEND) CRCP, HMA (TYPE A), RDWY EXC, CLASS 2 AB, FIVER OPTIC CABLE SYSTEMS. | $130.2M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN HESPERIA AND VICTORVILLE FROM OAK HILL RD OC TO 0.1 MILE S/O BEAR VALLEY RD OC REHABILITATE EXISTING MAINLINE AND RAMP PAVEMENT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 15. IN HESPERIA AND VICTORVILLE FROM OAK HILL RD OC TO 0.1 MILE S/O BEAR VALLEY RD OC REHABILITATE EXISTING MAINLINE AND RAMP PAVEMENT | $125.1M | — | — – — |
| Department of Transportation | LA CO, IN LONG BEACH, CARSON, CPMT, PMT, LYNW , PAVING_REHABILITATION | $124.6M | FY2008 | Sep 2008 – Sep 2010 |
| Department of Transportation | ON STATE ROUTE 58 IN SAN BERNARDINO COUNTY A HENKLEY ***, RECONSTRUCTION (2 LANE TO 4 LANE EXPRESSWAY) (TC) | $123M | FY2014 | Aug 2014 – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2019-20 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2019-20 | $123M | — | — – — |
| Department of Transportation | STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2016-17 (TC) | $122.2M | — | — – — |
| Department of Transportation | SF ON RTE 101 FROM PM 8.8-9.2, DOYLE DR REPL , REPLACE/REHABILITATE ROADWAY | $122.1M | FY2010 | Dec 2009 – Dec 2010 |
| Department of Transportation | IN SAN BERNARDINO COUNTY NEAR DEVORE ON INTERSTATE ROUTE 15 ***, I-15 CAJON PASS DESIGN BUILD REHAB PROJEC (TC) | $122M | FY2013 | Sep 2013 – — |
| Department of Transportation | PROJECT TITLE: MOUNT VERNON AVENUE OVERHEAD AT THE BURLINGTON NORTHERN SANTA FE RAILROAD YARD FROM KING STREET TO 5TH STREET, BR. NO. 54C-0066 BRIDGE REPLACEMENT :::: PROJECT DESCRIPTION: MOUNT VERNON AVENUE OVERHEAD AT THE BURLINGTON NORTHERN SANTA FE RAILROAD YARD FROM KING STREET TO 5TH STREET, BR. NO. 54C-0066 BRIDGE REPLACEMENT | $119.4M | — | — – — |
| Department of Transportation | IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PARK PRESIDIO P3, DEPT DIRECTED CHANGES& SUPPT(TC) | $119.1M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN SAN BERNARDINO FROM 0.4 MI W/O KERN CO LINE TO 7.5 MI E/O JCT 395 (KRAMER) CONSTRUCT 4-LANE DIVIDED EXPW ON NEW ALIGNMENT; SR 08/USR 395 IC & RR O :::: PROJECT DESCRIPTION: ON STATE ROUTE: 58. IN SAN BERNARDINO FROM 0.4 MI W/O KERN CO LINE TO 7.5 MI E/O JCT 395 (KRAMER) CONSTRUCT 4-LANE DIVIDED EXPW ON NEW ALIGNMENT; SR 08/USR 395 IC & RR OH BR(TC) | $117.7M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE. CONSTRUCT 4 LANE E :::: PROJECT DESCRIPTION: ON STATE ROUTE: 395. IN INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE. CONSTRUCT 4 LANE EXPRESSWAY. | $117.2M | — | — – — |
| Department of Transportation | STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2016-17 (TC) | $116M | — | — – — |
| Department of Transportation | IN AND NEAR GLENDALE & LA CANADA FLINTRIDGE FR DUNSMORE TO HAMPTON RD/FOOTHILL, PAVEMENT PRESERVATION (TC) | $115.9M | FY2014 | May 2014 – — |
| Department of Transportation | PROJECT TITLE: IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 11 AT 1.9 MILES EAST OF SANYO AVENUE UNDERCROSSING.PM 2.700/2.700 UNDERGROUND UTILITIES AND GRADING WORK :::: PROJECT DESCRIPTION: IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 11 AT 1.9 MILES EAST OF SANYO AVENUE UNDERCROSSING.PM 2.700/2.700 UNDERGROUND UTILITIES AND GRADING WORK PACKAGE. FINE GRADING (INCLUDING IMPORTED BORROW), INSTALLATION OF SITE PERIMETER SECURITY FENCE, INSTALLATION OF WET AND DRY UTILITIES PIPE/CONDUITS, AND PROCUREMENT OF LONG LEAD ITEMS SUCH AS BORDER FENCE, HIGH MAST SITE LIGHTING, AND INSPECTION BOOTHS. | $114M | FY2025 | Sep 2025 – Aug 2028 |
| Department of Transportation | PROJECT TITLE: IN SAN JOAQUIN COUNTY, IN AND NEAR STOCKTON, FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE. REHABILITATE ROADWAY, UPGRAD :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN SAN JOAQUIN COUNTY, IN AND NEAR STOCKTON, FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE. REHABILITATE ROADWAY, UPGRADE LIGHTING, GUARDRAIL AND BRIDGE RAILING, INSTALL TRANSPORTATION MANAGEMENT SYSTEMS (TMS) ELEMENTS, REPLACE SIGNS, REHABILITATE DRAINAGE SYSTEMS, ENHANCE HIGHWAY WORKER SAFETY, AND UPGRADE FACILITIES TO AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS. | $111.8M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN SAN DIEGO COUNTY ON ROUTE 78 FROM ROUTE 78/5 SEPARATION TO 0.3 MILE EAST OF ESCONDIDO BOULEVARD UNDERCROSSING REHABILITATE PAVEMENT, UPGRADE FACIL :::: PROJECT DESCRIPTION: ON STATE ROUTE: 78. IN SAN DIEGO COUNTY ON ROUTE 78 FROM ROUTE 78/5 SEPARATION TO 0.3 MILE EAST OF ESCONDIDO BOULEVARD UNDERCROSSING REHABILITATE PAVEMENT, UPGRADE FACILITIES TO AMERICANS WITH DISABILITIES ACT(ADA) STANDARDS, UPGRADE BRIDGE RAIL AND TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS REPLACE DAMAGED SIGN PANELS, MAKE OPERATIONAL IMPROVEMENTS TO REDUCE DELAY AND INSTALL FIBER OPTICS NETWORK. | $111.3M | FY2025 | Feb 2025 – Oct 2028 |
| Department of Transportation | PROJECT TITLE: IN LOS ANGELES CONUTY ON ROUTE 60 FROM 0.5 MILE WEST OF 60/710 SEPARATION TO ROUTE 60/605 SEPARATION AND ON ROUTE 710 FROM 0.5 MILE SOUTH OF 710/60 :::: PROJECT DESCRIPTION: ON STATE ROUTE: 60, 710. IN LOS ANGELES CONUTY ON ROUTE 60 FROM 0.5 MILE WEST OF 60/710 SEPARATION TO ROUTE 60/605 SEPARATION AND ON ROUTE 710 FROM 0.5 MILE SOUTH OF 710/60 SEPARATION. REHABILITATE PAVEMENT. FULL-DEPTH LANE REPLACMENT STRATEGY ON THE TWO OUTER PCC LANES, INSIDE AC LANE NEXT TO MEDIANSHOULDER, AND AUXILIARY LANES AT I-710/SR-60 INTERCHANGE. REPLACING DISTRESSED SLABS ON THE TOW INNER PCC LANES ON THE MAINLINE AND ON CONNECTORS AT I-710 AND SR-60 INTERCHANGE. COLD PLANNING/OVERLAYING AUXILIARY LANES AND SELECTED RAMPS AND SHOULDERS, REMOVING AND REPLACING APPROACH/DEPARTURE SLABS AND UPGRADING SAFETY FEATURES TO CURRENT STANDARDS. | $110.1M | — | — – — |
| Department of Transportation | STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2017-18 (TC) | $106.6M | — | — – — |
| Department of Transportation | STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2011-16 (TC) | $105.5M | FY2015 | Jun 2015 – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2019-20 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2019-20 | $105.2M | — | — – — |
| Department of Transportation | STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2017-18 (TC) | $105.1M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, IN :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, INCORPORATING AN ADDITIONAL NORTHBOUND TRUCK CLIMBING LANE FROM SR-14 TO CALGROVE BOULEVARD AND AN ADDITIONAL SOUTHBOUND TRUCK CLIMBING LANE FROM PICO CANYON ROAD/LYONS AVENUE TO SR-14. INCLUDES CONSTRUCTION OF ITS HUB ON ROUTE 5, PM 41.4 TO 43.8. EXTEND HOV LANES, ADD TRUCK CLIMBING LANES AND CONSTRUCT ITS HUB. | $104.3M | — | — – Sep 2027 |
| Department of Transportation | PROJECT TITLE: IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR :::: PROJECT DESCRIPTION: IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR GENERAL PURPOSE AND TWO EXPRESS LANES IN EACH DIRECTION WITH AUXILIARY LANES, WIDENING UNDER CROSSINGS, AND RECONSTRUCTION OF RAMPS AND LANE TRANSITIONS. (I-10 DESIGN BUILD CONTRACT 1). | $104.3M | — | — – Feb 2027 |
| Department of Transportation | GARVEE DEBT SER ($783,683,245.45) 2004A BONDS, 8 PROJECTS (SEE SEQ 7 SCOMMENT | $103.6M | FY2011 | Aug 2011 – — |
| Department of Transportation | IN SD CO IN SD ON RTE 5 AND 805 , DIRECT ACCESS RAMP & HOV LANES | $103.6M | FY2010 | Feb 2010 – Aug 2011 |
| Department of Transportation | PROJECT TITLE: IN SAN LUIS OBISPO COUNTY NEAR SHANDON FROM 0.2 MILE EAST OF SHANDON SAFETY ROADSIDEREST AREA TO 0.1 MILE WEST OF DAVIS ROAD CONVERT TO A FOUR LANE E :::: PROJECT DESCRIPTION: ON STATE ROUTE: 46. IN SAN LUIS OBISPO COUNTY NEAR SHANDON FROM 0.2 MILE EAST OF SHANDON SAFETY ROADSIDEREST AREA TO 0.1 MILE WEST OF DAVIS ROAD CONVERT TO A FOUR LANE EXPRESSWAY | $103.6M | — | — – — |
| Department of Transportation | IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS ALONG 1-5 FROM LOMAS SANTA FE DR. TO 0.5 MILE SOUTH OF PALOMAR AIRPORT RD. TO REPLACE THE SAN ELIJO LAGOON B | $103.2M | — | — – Jan 2027 |
| Department of Transportation | SM CO NEAR PACIFIC ON RT 1 S/O LINDA MAR BLVD , CONSTRUCT TUNNELS, APPROACH ROADS A | $102.9M | FY2009 | Dec 2008 – Dec 2009 |
| Department of Transportation | PROJECT TITLE: CONST BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERC :::: PROJECT DESCRIPTION: CONST BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 | $101.1M | — | — – — |
| Department of Transportation | I-5 CARPOOL LANE-ORANGE COUNTY LINE TO I-605 (SEGMENT 2) IN LA MIRADA WIDEN HOV LOCATION DETAILS SEGMENT 2.: IN LA MIRADA FROM ARTESIA BL TO NOR | $100.1M | — | — – — |
| Department of Transportation | CA - STATEWIDE ROLLING STOCK ACQUISITION | $100M | FY2011 | Apr 2011 – Dec 2026 |
| Department of Transportation | PROJECT TITLE: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B1 - CONSTRUCTION :::: PROJECT DESCRIPTION: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B1 - CONSTRUCTION | $100M | FY2019 | Mar 2019 – Mar 2032 |
| Department of Transportation | PROJECT TITLE: IN LOS ANGELES COUNT ON ROUTE 605 FROM TELEGRAPH ROAD TO ROUTE 10 (POSTMILES R10.2 TO 20.2). REHABILITATE ROADWAY, APPLY HIGH FRICTION SURFACE TREAT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 605. IN LOS ANGELES COUNT ON ROUTE 605 FROM TELEGRAPH ROAD TO ROUTE 10 (POSTMILES R10.2 TO 20.2). REHABILITATE ROADWAY, APPLY HIGH FRICTION SURFACE TREATMENT (HFST), UPGRADE FACILITIES TO AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS, UPGRADE GUARDRAIL, UPGRADE SIGNS, ENHANCE HIGHWAY WORKER SAFETY, AND REHABILITATE LANDSCAPING PAVEMENT REHABILITATION ON ROUTE 605 FROM TELEGRAPH ROAD TO ROUTE 10 | $100M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN LOS ANGELES COUNTY. ROUTE 57/60 CONFLUENCE CHOKEPOINT RELIEF PROGRAM. RECONSTRUCT GRAND AVENUE OVERCROSSING. RECONSTRUCT NORTHBOUND SR-57 CONNECTO :::: PROJECT DESCRIPTION: IN LOS ANGELES COUNTY. ROUTE 57/60 CONFLUENCE CHOKEPOINT RELIEF PROGRAM. RECONSTRUCT GRAND AVENUE OVERCROSSING. RECONSTRUCT NORTHBOUND SR-57 CONNECTOR TO EASTBOUND SR-60. CONSTRUCT EASTBOUND SR-60 BYPASS OFF-RAMP TO GRAND AVENUE. CONSTRUCT SOUTHBOUND INTERCHANGE MODIFICATIONS, INCLUDING AUXILIARY LANES AND THREE NEW BRIDGES | $99M | — | — – — |
| Department of Transportation | STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2018-19 | $97.4M | — | — – — |
| Department of Transportation | PROJECT TITLE: (MCP CC3) MID COUNTY PARKWAY CONSTRUCTION CONTRACT #3MCP ALIGNMENT BETWEEN APPROX. ONE MILE EAST OF RIDER STREET TO WARREN ROAD ALONG RAMONA EXPRESSW :::: PROJECT DESCRIPTION: (MCP CC3) MID COUNTY PARKWAY CONSTRUCTION CONTRACT #3MCP ALIGNMENT BETWEEN APPROX. ONE MILE EAST OF RIDER STREET TO WARREN ROAD ALONG RAMONA EXPRESSWAY CONSTRUCT 2 ADDITIONAL LANES, MEDIAN BARRIERS, NEW BRIDGE OVER THE SAN JACINTO RIVER & TRAFFIC SIGNAL | $96.9M | — | — – Dec 2029 |
| Department of Transportation | RTE 24 - ALA 5.3/6.2(PM) AND CC 0.01/1.3(PM) , CONSTRUCT NEW 2-LANE BORE | $96.2M | FY2009 | May 2009 – May 2010 |
| Department of Transportation | RTE 24 - ALA 5.3/6.2(PM) AND CC 0.01/1.3(PM) , CONSTRUCT NEW 2-LANE BORE | $96.2M | FY2009 | May 2009 – May 2010 |
| Department of Transportation | IN L.A. COUNTY ON RTE. 05 FROM VISTA DEL LAGO TO KERN COUNTY LINE, REHABILITATE ROADWAY AND WIDEN MEDIAN SHLDRS (TC) | $95.2M | FY2011 | Aug 2011 – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2023-24 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2023-24 | $94.9M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN THE CITIES OF SAN DIEGO, CHULA VISTA, AND NATIONAL CITY FROM CAMINO DE LA PLAZA TO 0.3 MILE SOUTH OF VIA DE LA VALLE. SD-005-R0.3/R36, REHABILITAT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN THE CITIES OF SAN DIEGO, CHULA VISTA, AND NATIONAL CITY FROM CAMINO DE LA PLAZA TO 0.3 MILE SOUTH OF VIA DE LA VALLE. SD-005-R0.3/R36, REHABILITATE PAVEMENT, DRAINAGE, AND SIGNS, UPGRADE TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS, AND UPGRADE FACILITIES TO AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS. | $94.5M | FY2025 | Nov 2024 – Dec 2028 |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2021-22 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2021-22 | $93.6M | — | — – — |
| Department of Transportation | 06/STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2014-15 (TC) | $92M | FY2014 | Jun 2014 – — |
| Department of Transportation | KERN COUNTY IN BAKERSFIELD FROM BEARDSLEY CANAL BRIDGE TO RTE 46/99 SEPARATION, REPL #2 & #3 LANES W/CRCP & PLACE 10' JPCP OS (TC) | $91.6M | FY2011 | Aug 2011 – — |
| Department of Transportation | PROJECT TITLE: IN BELL, VERNON, COMMERCE AND EAST LOS ANGELES, FROM 0.2 MILES SOUTH OF SLAUSON AVENUE OVERCROSSING TO 0.1 MILES NORTH OF 3RD STREET OVERCROSSING, . :::: PROJECT DESCRIPTION: ON STATE ROUTE: 710. IN BELL, VERNON, COMMERCE AND EAST LOS ANGELES, FROM 0.2 MILES SOUTH OF SLAUSON AVENUE OVERCROSSING TO 0.1 MILES NORTH OF 3RD STREET OVERCROSSING, . REHABILITATE ROADWAY INCLUDING WIDENING MEDIAN, TRAVEL LANES, AND SHOULDERS TO MEET CURRENT STANDARDS. REHABILITATE EXISTING PAVEMENT. UPGRADE TRAVEL LANES AND SHOULDERS AND MEDIA BARRIERS TO CURRENT STANDARDS. (TC) | $91.4M | — | — – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 | $90.6M | — | — – — |
| Department of Transportation | PROJECT TITLE: RIVERSIDE COUNTY FROM PENNSYLVANIA AVENUE UNDERCROSSING TO ROUTE 10/111 SEPARATION PAVEMENT REPLACEMENT, OVERLAY, CONCRETE SLAB, CURB RAMPS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. RIVERSIDE COUNTY FROM PENNSYLVANIA AVENUE UNDERCROSSING TO ROUTE 10/111 SEPARATION PAVEMENT REPLACEMENT, OVERLAY, CONCRETE SLAB, CURB RAMPS | $90.2M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS | $90.1M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN PLUMAS COUNTY AT AND NEAR CROMBERG FROM GILL RANCH ROAD TO 0.2 MILE WEST OF BIG GRIZZLY CREEK BRIDGE. 3R ROADWAY REHABILITATION :::: PROJECT DESCRIPTION: ON STATE ROUTE: 70. IN PLUMAS COUNTY AT AND NEAR CROMBERG FROM GILL RANCH ROAD TO 0.2 MILE WEST OF BIG GRIZZLY CREEK BRIDGE. 3R ROADWAY REHABILITATION | $89.9M | — | — – — |
| Department of Transportation | GERALD DESMOND BRIDGE BR# 53C0065, BRIDGE REPLACEMENT | $88.5M | FY2011 | Sep 2011 – — |
| Department of Transportation | PROJECT TITLE: SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 WIDEN 2-LANE HIGHWAY TO 4-LANE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 156. SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 WIDEN 2-LANE HIGHWAY TO 4-LANE CONTROLLED ACCESS HIGHWAY | $88.5M | — | — – Mar 2031 |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2020-21 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2020-21 | $88.5M | — | — – — |
| Department of Transportation | I-215 CORRIDOR NORTH, SEGMENTS 1 AND 2 , HOV AND MIXED FLOW LANES | $88.4M | FY2009 | May 2009 – May 2010 |
| Department of Transportation | PROJECT TITLE: IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.3 MILE SOUTH OF SMITH RIVER BRIDGE TO 0.4 MILE NORTH OF SMITH RIVER BRIDGE REPLACE BRIDGE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 101. IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.3 MILE SOUTH OF SMITH RIVER BRIDGE TO 0.4 MILE NORTH OF SMITH RIVER BRIDGE REPLACE BRIDGE | $87.8M | — | — – — |
| Department of Transportation | PROJECT TITLE: GLENN COUNTY AT BUTTE CITY FROM ROUTE 45 TO 0.1 MILE EAST OF MCDOUGAL STREET REPLACE BRIDGE 11-0017 & VIADUCT APPROACH, RECONSTRUCT ROADWAY :::: PROJECT DESCRIPTION: ON STATE ROUTE: 162. GLENN COUNTY AT BUTTE CITY FROM ROUTE 45 TO 0.1 MILE EAST OF MCDOUGAL STREET REPLACE BRIDGE 11-0017 & VIADUCT APPROACH, RECONSTRUCT ROADWAY | $86.2M | — | — – — |
| Department of Transportation | PROJECT TITLE: YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 50. YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE BEND) CRCP, HMA (TYPE A), RDWY EXC, CLASS 2 AB, FIVER OPTIC CABLE SYSTEMS. | $86M | — | — – Jun 2029 |
| Department of Transportation | IN LMRD FR ARTESIA BL / COYOTE CK OC, ROADWAY WIDENING (TC) | $86M | FY2013 | Apr 2013 – — |
| Department of Transportation | PROJECT TITLE: I-80 AND US 50 IN SOLANO, YOLO, AND SACRAMENTO COUNTIES ON I-80 FROM THE I-80/KIDWELL ROAD INTERCHANGE IN SOLANO COUNTY, THROUGH YOLO COUNTY, TO THE :::: PROJECT DESCRIPTION: I-80 AND US 50 IN SOLANO, YOLO, AND SACRAMENTO COUNTIES ON I-80 FROM THE I-80/KIDWELL ROAD INTERCHANGE IN SOLANO COUNTY, THROUGH YOLO COUNTY, TO THE I-80/US 50 INTERCHANGE: CONSTRUCT IMPROVEMENTS CONSISTING OF MANAGED LANES IN EACH DIRECTION, PEDESTRIAN/BICYCLE IMPROVEMENTS, AND INTELLIGENT TRANSPORTATION SYSTEM (ITS) ELEMENTS (TC). | $85.9M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN SAN DIEGO COUNTY IN SAN DIEGO FROM ROUTE 805/15 SEPARATION TO 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION. UPGRADE TMS ELEMENTS, CONCRETE PAVEMENT R :::: PROJECT DESCRIPTION: ON STATE ROUTE: 805. IN SAN DIEGO COUNTY IN SAN DIEGO FROM ROUTE 805/15 SEPARATION TO 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION. UPGRADE TMS ELEMENTS, CONCRETE PAVEMENT REHAB, DRAINAGE AND SIGNS | $85.8M | FY2024 | Apr 2024 – Jun 2029 |
| Department of Transportation | ON ROUTE 15 IN SAN BERNARDINO COUNTY IN RANCHO CUCAMONGA, ***, ROADWAY REHABILITAION (TC) | $85.5M | FY2012 | Oct 2011 – — |
| Department of Transportation | PROJECT TITLE: KERN COUNTY NEAR GRAPEVINE FROM 0.3 MILE SOUTH OF GRAPEVINE CREEK BRIDGE TO 0.5 MILE NORTH OF GRAPEVINE ROAD UNDERCROSSING REHABILITATE ROADWAY IN NO :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. KERN COUNTY NEAR GRAPEVINE FROM 0.3 MILE SOUTH OF GRAPEVINE CREEK BRIDGE TO 0.5 MILE NORTH OF GRAPEVINE ROAD UNDERCROSSING REHABILITATE ROADWAY IN NORTHBOUND DIRECTION WITH CONTINUOUSLY REINFORCED CONCRETE PAVEMENT AND JOINTED PLAIN CONCRETE, REPLACE SIGNS, UPGRADE GUARDRAIL AND TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS, AND REHABILITATE DRAINAGE SYSTEMS AND LIGHTING. | $85.2M | FY2025 | Jul 2025 – Oct 2030 |
| Department of Transportation | PROJECT TITLE: IN SAN LUIS OBISPO COUNTY AT AND NEAR CHOLAME ON ROUTE 41 FROM ROUTE 41/46 SEPARATION TO 0.8 MILE NORTH OF ROUTE 41/46 SEPARATION AND ON ROUTE 46 FRO :::: PROJECT DESCRIPTION: ON STATE ROUTE: 46. IN SAN LUIS OBISPO COUNTY AT AND NEAR CHOLAME ON ROUTE 41 FROM ROUTE 41/46 SEPARATION TO 0.8 MILE NORTH OF ROUTE 41/46 SEPARATION AND ON ROUTE 46 FROM 0.8 MILE WEST OF DAVIS ROAD TO 0.5 MILE WEST OF ANTELOPE ROAD. CONVERT TO A 4-LANE EXPRESSWAY AND CONSTRUCT NEW CONNECTORS. | $85.1M | — | — – May 2030 |
| Department of Transportation | IN IMPERIAL COUNTY NEAR EL CENTRO FROM 0.5 MILE WEST OF ROUTE 8/111 SEPARATION TO 0.6 MILE WEST OF ANDERHOLT ROAD OVERCROSSING AND FROM 0.5 MILE EAST | $84.1M | — | — – — |
| Department of Transportation | IN SAN BERNARDINO COUNTY NEAR DEVORE ON INTERSTATE ROUTES 15 AND 215 *, 1-15/1-215 DEVORE INTERCHANGE IMPROVEMENT ** (TC) | $83.9M | FY2013 | Sep 2013 – — |
| Department of Transportation | PROJECT TITLE: MONTEREY COUNTY, NEAR GORDA, 0.9 MILE NORTH OF VILLA CREEK BRIDGE TO 1.7 MILES NORTH OF RAIN ROCKS SIDEHILL VIADUCT. EMERGENCY RELIEF / OPENING - REM :::: PROJECT DESCRIPTION: ON STATE ROUTE: 1. MONTEREY COUNTY, NEAR GORDA, 0.9 MILE NORTH OF VILLA CREEK BRIDGE TO 1.7 MILES NORTH OF RAIN ROCKS SIDEHILL VIADUCT. EMERGENCY RELIEF / OPENING - REMOVE SLIDE DEBRIS AND RECONSTRUCT HIGHWAY. | $83M | — | — – — |
| Department of Transportation | PROJECT TITLE: SANTA BARBARA COUNTY IN AND NEAR CARPINTERIA AND AT SUMMERLAND FROM 0.9 MILE SOUTH OF SOUTH PADARO LANE UNDERCROSSING TO 0.6 MILE NORTH OF PADARO LANE :::: PROJECT DESCRIPTION: SANTA BARBARA COUNTY IN AND NEAR CARPINTERIA AND AT SUMMERLAND FROM 0.9 MILE SOUTH OF SOUTH PADARO LANE UNDERCROSSING TO 0.6 MILE NORTH OF PADARO LANE CONSTRUCT HOV LANES AND REHABILITATE ROADWAY | $82.5M | — | — – — |
| Department of Transportation | IN STA CO IN & NEAR TURLOCK, CERES, AND MODESTO FROM SJ CO LINE TO STA CO LINE, HIGHWAY REHABILITATION (TC) | $82.2M | FY2011 | Jun 2011 – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 2025-27 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 2025-27 | $82.1M | — | — – — |
| Department of Transportation | PROJECT TITLE: MONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE CONSTRUCT CONTINUOUS REINFORCED CONCRETE P :::: PROJECT DESCRIPTION: MONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE CONSTRUCT CONTINUOUS REINFORCED CONCRETE PAVEMENT, BRIDGE REHABILITATION AND MEDIAN BARRIER. | $82M | — | — – — |
| Department of Transportation | PROJECT TITLE: PLACER AND NEVADA COUNTIES NEAR KINGVALE FROM 0.3 MILE WEST OF TROY UNDERCROSSING TO 0.2 MILE EAST OF SODA SPRINGS OVERCROSSING. RDWAY EXC, PLACE HMA :::: PROJECT DESCRIPTION: ON STATE ROUTE: 80. PLACER AND NEVADA COUNTIES NEAR KINGVALE FROM 0.3 MILE WEST OF TROY UNDERCROSSING TO 0.2 MILE EAST OF SODA SPRINGS OVERCROSSING. RDWAY EXC, PLACE HMA & JPCP, SLAB REPLACEMENT & POLYESTER CONC OVERLAY | $81.7M | — | — – Jan 2029 |
| Department of Transportation | GERALD DESMOND BRIDGE BR# 53C0065 ., BRIDGE REPLACEMENT | $81.5M | FY2011 | Apr 2011 – — |
| Department of Transportation | PROJECT TITLE: ALAMEDA AND CONTRA COSTA COUNTIES AT SUNOL AND IN SAN RAMON FROM KOOPMANN ROADUNDERCROSSING TO 0.9 MILE NORTH OF ALCOSTA BOULEVARD OVERCROSSING PRECA :::: PROJECT DESCRIPTION: ON STATE ROUTE: 680. ALAMEDA AND CONTRA COSTA COUNTIES AT SUNOL AND IN SAN RAMON FROM KOOPMANN ROADUNDERCROSSING TO 0.9 MILE NORTH OF ALCOSTA BOULEVARD OVERCROSSING PRECAST CONC PVMT, ELECTRONIC TOLL SYSTEM, JPCP, CB & STRUCTURAL CONC. (TC) | $81.1M | — | — – — |
| Department of Transportation | IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 | $79.9M | FY2016 | Jan 2016 – — |
| Department of Transportation | PROJECT TITLE: CONST BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERC :::: PROJECT DESCRIPTION: ON STATE ROUTE: 55. CONST BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 | $79.4M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS | $78.7M | — | — – — |
| Department of Transportation | SAN FRANCISCO - OAKLAND BAY BRIDGE REPLACE SFOBB EAST SPAN | $78.6M | FY2011 | Dec 2010 – — |
| Department of Transportation | PROJECT TITLE: I-5 NORTH COAST CORRIDOR HOV EXTENSION - PHASE 1 - ENCINITAS HOV (SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. I-5 NORTH COAST CORRIDOR HOV EXTENSION - PHASE 1 - ENCINITAS HOV (SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE NORTH OF PALOMAR AIRPORT ROAD OVERCROSSING). CONSTRUCT HOV LANES, SOUNDWALLS, CULVERT REHAB, ITS, AND BIKE TRAIL (CMGC). | $78.5M | — | — – — |
| Department of Transportation | PROJECT TITLE: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 5 SOLICITATION AS PART OF THE APPROVED FTIP INSTALLING AND OPERATING DIRECT CURRENT F :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 5 SOLICITATION AS PART OF THE APPROVED FTIP INSTALLING AND OPERATING DIRECT CURRENT FAST CHARGERS PRIMARILY SERVING MEDIUM- AND HEAVY-DUTY VEHICLES IN SPECIFIED REGIONS OF THE STATE NEAR DESIGNATED ALTERNATIVE FUEL CORRIDORS AS LISTED IN THE NEVI SOLICITATION 5 MANUAL AND IN THE FSTIP BACK-UP LIST. | $77.2M | FY2026 | Jan 2026 – Mar 2035 |
| Department of Transportation | PROJECT TITLE: IN RIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD CONSTRUCT SHOULDERS & RUMBLE STRIP :::: PROJECT DESCRIPTION: ON STATE ROUTE: 79. IN RIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD CONSTRUCT SHOULDERS & RUMBLE STRIP | $75.5M | — | — – — |
| Department of Transportation | PROJECT TITLE: ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN PRECAST CONCRETE PAVEMENT AND HMA :::: PROJECT DESCRIPTION: ON STATE ROUTE: 680. ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN PRECAST CONCRETE PAVEMENT AND HMA | $75.5M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN RIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE FROM MONTE VISTA STREET TO GRAND AVENUE WIDEN ROADWAY TO STANDARD 12' LANES, ADD 2' MEDIAN BUFFER & 4' :::: PROJECT DESCRIPTION: ON STATE ROUTE: 74. IN RIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE FROM MONTE VISTA STREET TO GRAND AVENUE WIDEN ROADWAY TO STANDARD 12' LANES, ADD 2' MEDIAN BUFFER & 4' OUTSIDE SHOULDERS, INSTALL RUMBLE STRIPS, UPGRADE GUARDRAIL & REGRADE SIDE SLOPES | $74.7M | — | — – Jul 2029 |
| Department of Transportation | IN SD 1.2 KM E/O 805/905 TO 0.8KM E/O BRI. OC , CON | $73.9M | FY2009 | Apr 2009 – Dec 2010 |
| Department of Transportation | LA CO. FR 605/60 INTERCHANGE TO DIAMOND BAR UC, REHABILITATION PAVEMENT, PAVEMENT REHABILITATION (TC) | $73.7M | FY2012 | Jul 2012 – — |
| Department of Transportation | PROJECT TITLE: ALAMEDA AND CONTRA COSTA COUNTIES IN ALBANY AND CROCKETT FROM 0.4 MILE SOUTH OF ALAMEDA COUNTY LINE TO 0.2 MILE RHMA (OGFC), LIGHTING SYSTEM, AND CON :::: PROJECT DESCRIPTION: ON STATE ROUTE: 80. ALAMEDA AND CONTRA COSTA COUNTIES IN ALBANY AND CROCKETT FROM 0.4 MILE SOUTH OF ALAMEDA COUNTY LINE TO 0.2 MILE RHMA (OGFC), LIGHTING SYSTEM, AND CONCRETE BARRIER | $73.6M | — | — – Jul 2027 |
| Department of Transportation | ROUTE 10: PUENTE TO CITRUS, HOV LANES FROM 8 TO 10 LANES AND SOUNDWALLS(TC) | $73.5M | FY2013 | Sep 2013 – — |
| Department of Transportation | IN SAN BERNARDINO FROM 0.4 MI W/O KERN CO LINE TO 7.5 MI E/O JCT 395 (KRAMER) CONSTRUCT 4-LANE DIVIDED EXPW ON NEW ALIGNMENT; SR 08/USR 395 IC & RR O | $72.9M | — | — – — |
| Department of Transportation | IN BKERSFIELS SR58:FROM W/O SR99 TO COTTONWOOD RD. & SR99: WILSON RD TO MING AVE, OPERATIONAL INPROVEMENT/ INCLUDES AUXILLARY LANE | $72.6M | FY2014 | Jul 2014 – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 | $72.3M | — | — – Jun 2028 |
| Department of Transportation | PROJECT TITLE: SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD REPLACE BRIDGE DECK, WIDEN CAL EXPO :::: PROJECT DESCRIPTION: ON STATE ROUTE: 51. SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD REPLACE BRIDGE DECK, WIDEN CAL EXPO UC, INSTALL BIKE PATH ON BRIDGE. | $72M | — | — – — |
| Department of Transportation | SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595 THIS | $71.9M | — | — – — |
| Department of Transportation | GARVEE DEBT SER ($783,683,245.45) 2004A BONDS , 8 PROJECTS (SEE SEQ 7 SCOMMENT) *** | $71.8M | FY2008 | Sep 2008 – Sep 2009 |
| Department of Transportation | PROJECT TITLE: I-15 FROM CAJALCO ROAD IN THE CITY OF CORONA TO STATE ROUTE 74 IN THE CITY OF LAKE ELSINORE EXTEND TOLL EXPRESS LANES SOUTH IN EACH TRAVEL DIRECTION :::: PROJECT DESCRIPTION: I-15 FROM CAJALCO ROAD IN THE CITY OF CORONA TO STATE ROUTE 74 IN THE CITY OF LAKE ELSINORE EXTEND TOLL EXPRESS LANES SOUTH IN EACH TRAVEL DIRECTION (TC) | $71.8M | — | — – Sep 2028 |
| Department of Transportation | PROJECT TITLE: FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING. RECONSTRUCT CONCRETE PA :::: PROJECT DESCRIPTION: ON STATE ROUTE: 99. FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING. RECONSTRUCT CONCRETE PAVEMENT AND OTHER REHABILITATION IMPROVEMENTS. | $71.5M | — | — – — |
| Department of Transportation | GARVEE DEBT SER ($783,683,245.45) 2004A BONDS, 8 PROJECTS (SEE SEQ 7 SCOMMENT | $71.3M | FY2013 | Sep 2013 – — |
| Department of Transportation | GARVEE DEBT SER ($783,683,245.45) 2004A BONDS, 8 PROJECTS (SEE SEQ 7 SCOMMENT | $71.2M | FY2014 | Sep 2014 – — |
| Department of Transportation | IN LA FR RTE 10 / RTE 101 , WIDEN FOR HOV LANE | $71M | FY2008 | Jul 2008 – Sep 2009 |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2022-23 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2022-23 | $70.9M | — | — – Jun 2026 |
| Department of Transportation | STATEWIDE, STATEWIDE PRELIMINARY ENG SVCS | $69.9M | FY2011 | Jun 2011 – — |
| Department of Transportation | NEAR DESERT CENTER FROM 1.9 MI E/O CACTUS CITY REST AREA TO 0.4 MI E/O STATE RTE 177 JCT REHABILITATE PAVEMENT (TC) | $69.9M | FY2016 | Mar 2016 – — |
| Department of Transportation | IN AND NEAR SACRAMENTO FROM SAN JOAQUIN COUNTY LINE TO FLORIN ROAD OVERCROSSING, PAVEMENT REHABILITATION - (TC) | $69.8M | FY2010 | Jul 2010 – — |
| Department of Transportation | CONSOLIDATED PLANNING GRANT | $69.7M | FY2010 | Sep 2010 – — |
| Department of Transportation | PROJECT TITLE: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 4 SOLICITATION AS PART OF THE APPROVED FTIP. INSTALLING AND OPERATING DIRECT CURRENT :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 4 SOLICITATION AS PART OF THE APPROVED FTIP. INSTALLING AND OPERATING DIRECT CURRENT FAST CHARGERS PRIMARILY SERVING MEDIUM- AND HEAVY-DUTY VEHICLES IN SPECIFIED REGIONS OF THE STATE NEAR DESIGNATED ALTERNATIVE FUEL CORRIDORS AS LISTED IN THE NEVI SOLICITATION 4 MANUAL AND IN THE FSTIP BACK-UP LIST. | $69.5M | FY2026 | Dec 2025 – Mar 2035 |
| Department of Transportation | NORTH OAKLAND AERIAL STRUCTURES , SEISMIC RETROFIT | $69.2M | FY2008 | Jul 2008 – Jul 2009 |
| Department of Transportation | PROJECT TITLE: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 6 SOLICITATION AS PART OF THE APPROVED FTIP. INSTALLING AND OPERATING DIRECT CURRENT :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 6 SOLICITATION AS PART OF THE APPROVED FTIP. INSTALLING AND OPERATING DIRECT CURRENT FAST CHARGERS NEAR ALTERNATIVE FUEL CORRIDORS AS SPECIFIED IN THE NEVI SOLICITATION 6 MANUAL AND IN THE FSTIP BACK-UP LIST. | $68.6M | FY2026 | Dec 2025 – Mar 2035 |
| Department of Transportation | STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2016-17 (TC) | $67.7M | — | — – — |
| Department of Transportation | IN SHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING. WIDENING TO 6 LANES, BRIDGE REP | $67.7M | — | — – — |
| Department of Transportation | PROJECT TITLE: SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD REPLACE BRIDGE DECK, WIDEN CAL EXPO :::: PROJECT DESCRIPTION: ON STATE ROUTE: 51. SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD REPLACE BRIDGE DECK, WIDEN CAL EXPO UC, INSTALL BIKE PATH ON BRIDGE. | $67.5M | — | — – — |
| Department of Transportation | CA - STATEWIDE ROLLING STOCK ACQUISITION | $66.8M | FY2011 | Aug 2011 – Dec 2017 |
| Department of Transportation | PROJECT TITLE: STATEWIDE - OWP 25/26 - CPG CONSOLIDATED PLANNING GRANT (CPG) PROJECT FOR OVERALL WORK PROGRAMS FOR FISCAL YEAR 2025/2026 (TC) :::: PROJECT DESCRIPTION: STATEWIDE - OWP 25/26 - CPG CONSOLIDATED PLANNING GRANT (CPG) PROJECT FOR OVERALL WORK PROGRAMS FOR FISCAL YEAR 2025/2026 (TC) | $66.5M | — | — – Jul 2029 |
| Department of Transportation | PROJECT TITLE: IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM LOMAS SANTA FE DRIVE UNDERCROSSING TO 0.2 MILE NORTH OF OCEANSIDE BOULEVARD UNDERCROSSING I-5 NORTH COA :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM LOMAS SANTA FE DRIVE UNDERCROSSING TO 0.2 MILE NORTH OF OCEANSIDE BOULEVARD UNDERCROSSING I-5 NORTH COAST CORRIDOR HOV EXTENSION, PHASE 1, CARLSBAD SEG, PACKAGE 3. CONSTRUCT COMMUNITY ENHANCEMENTS; PLANT ESTABLISHMENT. CONSTRUCT SB AUX LANE. | $66.4M | — | — – — |
| Department of Transportation | IN THE CITY OF LONG BEACH AT THE GERALD DESMOND BRIDGE, BRIDGE REPLACEMENT | $66.4M | FY2013 | Sep 2013 – — |
| Department of Transportation | PROJECT TITLE: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 3 SOLICITATION INSTALLING AND OPERATING DIRECT CURRENT FAST CHARGERS ALONG SPECIFIED :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 3 SOLICITATION INSTALLING AND OPERATING DIRECT CURRENT FAST CHARGERS ALONG SPECIFIED CORRIDOR SEGMENTS OF ALTERNATIVE FUEL CORRIDORS LISTED IN THE NEVI SOLICITATION 3 MANUAL AND IN THE FSTIP BACK-UP LIST. | $65.9M | FY2026 | Dec 2025 – Mar 2035 |
| Department of Transportation | IN SISKIYOU COUNTY IN AND NEAR DUNSMUIR FROM SACRAMENTO RIVER BRIDGE TO 0.6 MILE SOUTH OF NORTH MOUNT SHASTA UNDERPASS. 2 R ROADWAY REHABILIATION - S | $65.8M | — | — – — |
| Department of Transportation | PROJECT TITLE: TULARE COUNTY IN AND NEAR TULARE FROM PROSPERITY AVENUE TO 1.2 MILES SOUTH OF AVENUE 280 OVERCROSSING WIDEN FREEWAY FROM FOUR TO SIX LANES :::: PROJECT DESCRIPTION: ON STATE ROUTE: 99. TULARE COUNTY IN AND NEAR TULARE FROM PROSPERITY AVENUE TO 1.2 MILES SOUTH OF AVENUE 280 OVERCROSSING WIDEN FREEWAY FROM FOUR TO SIX LANES | $65.8M | — | — – Dec 2026 |
| Department of Transportation | PROJECT TITLE: IN SAN JUAN CAPISTRANO AND MISSION VIEJO FROM ROUTE 73 TO OSO PARKWAY. ADD GENERAL PURPOSE LANE IN EACH DIRECTION AND RECONSTRUCT INTERCHANGES AT AVE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN SAN JUAN CAPISTRANO AND MISSION VIEJO FROM ROUTE 73 TO OSO PARKWAY. ADD GENERAL PURPOSE LANE IN EACH DIRECTION AND RECONSTRUCT INTERCHANGES AT AVERY PARKWAY. | $65.7M | — | — – — |
| Department of Transportation | I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 CONSTR | $65.6M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN RIVERSIDE AND SAN BERNARDINO COUNTIES FROM 1.2 MILE SOUTH OF CANTU-GALLEANO RANCH RD OVERCROSSING IN EASTVALE TO 1.0 MILE NORTH OF BASELINE AVE OV :::: PROJECT DESCRIPTION: ON STATE ROUTE: 15. IN RIVERSIDE AND SAN BERNARDINO COUNTIES FROM 1.2 MILE SOUTH OF CANTU-GALLEANO RANCH RD OVERCROSSING IN EASTVALE TO 1.0 MILE NORTH OF BASELINE AVE OVERCROSSING IN FONTANA ADD ONE TO TWO EXPRESS LANES IN EACH DIRECTION BETWEEN CANTU-GALLEANO RANCH ROAD AND FOOTHILL BOULEVARD, ONE AUXILIARY LANE IN EACH DIRECTION BETWEEN SR-60 AND I-10 | $65.1M | — | — – Jun 2029 |
| Department of Transportation | PROJECT TITLE: IN THE CITY OF CORONA AT THE JUNCTION OF SR-91 AND SR-71 NEAR THE ORANGE COUNTY LINE. REPLACE THE EB 91 TO NB 71 CONNECTOR WITH A DIRECT CONNECTOR AN :::: PROJECT DESCRIPTION: IN THE CITY OF CORONA AT THE JUNCTION OF SR-91 AND SR-71 NEAR THE ORANGE COUNTY LINE. REPLACE THE EB 91 TO NB 71 CONNECTOR WITH A DIRECT CONNECTOR AND RECONSTRUCT THE GREEN RIVER ROAD EB ON-RAMP | $65M | — | — – Dec 2030 |
| Department of Transportation | NEAR WINDSOR, FROM THE TOWN OF WINDSOR TO GEYSERVILLE. REHABILITATE ROADWAY (TC) | $64.7M | — | — – — |
| Department of Transportation | LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE, SCHYULER HEIM BRIDGE REPLACEMENT (TC) | $64.6M | FY2011 | Sep 2011 – — |
| Department of Transportation | PROJECT TITLE: IN VARIOUS CITIES, FROM ORANGE COUNTY LINE TO 0.1 MILE NORTH OF TELEGRAPH ROAD; ALSO ON ROUTE 91 FROM 0.2 MILE WEST OF ROUTE 605TO ROUTE 605 (PM R16. :::: PROJECT DESCRIPTION: ON STATE ROUTE: 605. IN VARIOUS CITIES, FROM ORANGE COUNTY LINE TO 0.1 MILE NORTH OF TELEGRAPH ROAD; ALSO ON ROUTE 91 FROM 0.2 MILE WEST OF ROUTE 605TO ROUTE 605 (PM R16.63/R16.83). PAVEMENT REHABILITATION CONSISTING OF FULL STRUCTURAL SECTION REPLACEMENT AND DAMAGED SLAB REPLACEMENT. COLD PLANE AND OVERLAY RUBBERIZED HOT MIX ASPHALT (RHMA-G) ON RIGHT SHOULDERS AND APPLY HIGH FRICTION SURFACE TREATMENT (HFST) ONRAMPS AND CONNECTORS. THE PURPOSE OF THIS PROJECT IS TO RESTORE THE FACILITY TO A STATE OF GOOD REPAIR BY REHABILITATING THE EXISTING PAVEMENT. FOR LANE REPLACEMENT, CONSTRUCTING A NEW PAVEMENT STRUCTURE WILL PROVIDE 40 YEARS OF SERVICE LIFE. REPLACING SLABS WILL PROVIDE 5 TO 10 YEARS OF SERVICE LIFE. | $64.6M | — | — – — |
| Department of Transportation | LA-005-45.4R/61.2R. IN AND NEAR SANTA CLARITA, FROM 0.5 MILES SOUTH OF I-5/SR-14 SEPARATION TO 1.7 MILES NORTH OF LAKE HUGHES ROAD UNDERCROSSING. RO | $64.3M | — | — – — |
| Department of Transportation | IN SAN BERNARDINO COUNTY *** , ROADWAY REHABILITATION | $64.1M | FY2008 | May 2008 – May 2009 |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 23/24 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 23/24 | $64.1M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MILE WEST OF CONVOY STREET OVERCROSSING TO 0.3 MILE EAST OF SANTO ROAD OVERCROSSING ROADWAY REHABILITATION :::: PROJECT DESCRIPTION: ON STATE ROUTE: 52. IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MILE WEST OF CONVOY STREET OVERCROSSING TO 0.3 MILE EAST OF SANTO ROAD OVERCROSSING ROADWAY REHABILITATION TO MITIGATE HIGHWAY SETTLEMENT, CONSTRUCT AUXILIARY LANE, TRANSPORTATION MANAGEMENT SYSTEM (TMS), LIGHTING, AND ROADSIDE SAFETY IMPROVEMENTS. | $64M | — | — – — |
| Department of Transportation | PROJECT TITLE: ON I-80 THROUGH THE CITIES OF FAIRFIELD AND VACAVILLE IN SOLANO COUNTY, FROM (PM) 10.4 TO 30.2 SOLANO COUNTY: I-8O FROM RED TOP RD TO I-505:CONVER :::: PROJECT DESCRIPTION: ON STATE ROUTE: 80. ON I-80 THROUGH THE CITIES OF FAIRFIELD AND VACAVILLE IN SOLANO COUNTY, FROM (PM) 10.4 TO 30.2 SOLANO COUNTY: I-8O FROM RED TOP RD TO I-505:CONVERT EXISTING HOV TO MANAGED LANE; I-80 FROM AIR BASE PARKWAY TO I-505: CONSTRUCT NEW MANAGED LANES. RTP IDS 17-10-0059, 17-10-0056 | $63.5M | — | — – Sep 2027 |
| Department of Transportation | PROJECT TITLE: IN SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD. REMOVE AND REPLACE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 99. IN SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD. REMOVE AND REPLACE COSUMNES RIVER AND COSUMNES RIVER OVERFLOW BRIDGES. | $62.9M | — | — – Nov 2027 |
| Department of Transportation | PROJECT TITLE: IN ALAMEDA COUNTY IN FREMONT AND NEWARK FROM SANTA CLARA COUNTY LINE TO 0.4 MILENORTH OF FREMONT BOULEVARD OVERCROSSING COLD PLANE PAVEMENT, OVERLAY :::: PROJECT DESCRIPTION: ON STATE ROUTE: 880. IN ALAMEDA COUNTY IN FREMONT AND NEWARK FROM SANTA CLARA COUNTY LINE TO 0.4 MILENORTH OF FREMONT BOULEVARD OVERCROSSING COLD PLANE PAVEMENT, OVERLAY WITH RHMA-G/RHMA-O | $62.9M | — | — – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 22/23 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 22/23 | $62.7M | — | — – Sep 2026 |
| Department of Transportation | ON I-205 AND I-580 FROM SAN JOAQUIN COUNTY LINE TO GREENVILLE ROAD OVERHEAD. RESURFACE AND RESTORE PAVEMENT ON THE MAINLINE AND RAMPS. (TC) | $62.3M | FY2016 | May 2016 – — |
| Department of Transportation | IN AND NEAR FREMONT, UNION CITY, HAYWARD, SAN LEANDRO, AND OAKLAND FROM 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING TO HIGH STREET SEPARATION AN | $61.9M | — | — – — |
| Department of Transportation | LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE SCHYULER HEIM BRIDGE REPLACEMENT (TC) | $61.9M | — | — – — |
| Department of Transportation | PROJECT TITLE: ON ROUTE 101, IN MARIN COUNTY, IN AND NEAR CITY OF NOVATO, FROM JUST SOUTH OF THE FRANKLIN AVENUE TO 0.3MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE. :::: PROJECT DESCRIPTION: ON STATE ROUTE: 101. ON ROUTE 101, IN MARIN COUNTY, IN AND NEAR CITY OF NOVATO, FROM JUST SOUTH OF THE FRANKLIN AVENUE TO 0.3MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE. WIDEN ROUTE 101 TO CONSTRUCT A SOUTHBOUND HOV LANE FROM 0.3 MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE TO JUST SOUTH OF THE FRANKLIN AVENUE OVERHEAD (6.0 MILES), AND A NORTHBOUND HOV LANE FROM 1.7 MILES NORTH OF THE ATHERTON AVENUE OVERCROSSING TO 0.3 MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE (3.5 MILES). THE PROJECT INCLUDES ROADWAY AND BRIDGE WIDENING FOR HOV LANES AND STANDARD SHOULDERS. THE PROJECT WILL ALSO UPGRADE THE HORIZONTAL AND VERTICAL ROADWAY ALIGNMENT (FOR A 70 MPH DESIGN SPEED), MODIFY THE REDWOOD LANDFILL INTERCHANGE RAMPS TO CONFORM WITH THE NEW ALIGNMENT, AND RESTRIPE A FRONTAGE ROAD (REDWOOD BOULEVARD) FOR CLASS II BIKE LANES IN NOVATO.) | $61.7M | — | — – — |
| Department of Transportation | IN SACRAMENTO AND WEST SACRAMENTO FROM 80/84 SEPARATION TO WATT AVENUE OVERCROSS, CONST. HOV LANES & REHAB. ROADWAY - (TC) | $60.5M | FY2010 | Sep 2010 – — |
| Department of Transportation | PROJECT TITLE: LA-057, IN LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION THE PROJECT IS LOCATED IN LOS ANG :::: PROJECT DESCRIPTION: ON STATE ROUTE: 57. LA-057, IN LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION THE PROJECT IS LOCATED IN LOS ANGELES COUNTY ON ROUTE 57 FROM ORANGE COUNTY LINE TO ROUTE 57/60 INTERCHANGE. THE PROJECT PROPOSES TO REPLACE FULL PAVEMENT STRUCTURE ON LANES 2 AND 3; REPLACE DISTRESSED INDIVIDUAL SLABS IN LANES 1, 4 AND HIGH OCCUPANCY VEHICLE (HOV); UPGRADE MEDIAN CONCRETE BARRIER TO TYPE 60; COLD PLANE AND OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (RHMA) AND HMA PAVEMENTS ON RAMPS AND RECONSTRUCT 3 OFF-RAMP TERMINI. OTHER IMPROVEMENTS INCLUDE: GUARDRAIL, SIGN STRUCTURES AND PANELS; UPGRADE AC DIKES; ADA RAMPS AND TRAFFIC LOOP DETECTORS; AND INSTALL 8 BEST MANAGEMENT PRACTICE (BMP) DEVICES RECOMMENDED BY THE CORRIDOR STORMWATER MANAGEMENT STUDY. | $59.8M | — | — – — |
| Department of Transportation | I-10 FROM RTE.605 TO PUENTE AVE. , CONS.ONE HOV LANE IN EACH DIRECTION | $59.8M | FY2008 | Sep 2008 – Sep 2009 |
| Department of Transportation | CITY OF BAKERSFIELD: CENTENNIAL CORRIDOR PROJECT: I-5 TO SR 58 AT COTTONWOOD RD., CONSTRUCT NEW 6-LANE FREEWAY | $59.4M | FY2013 | Nov 2012 – — |
| Department of Transportation | IN AND NEAR THE CITIES OF LOS ANGELES, CALABASAS AND AGOURA HILLS FROM SR170 TO, REHABILITATION PAVEMENT CONDITIONS (TC) | $59M | FY2014 | Sep 2014 – — |
| Department of Transportation | PROJECT TITLE: SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD. DREDGE, CONSTRUCT IN-WATER FOUNDATI :::: PROJECT DESCRIPTION: SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD. DREDGE, CONSTRUCT IN-WATER FOUNDATION. | $58.7M | — | — – — |
| Department of Transportation | STATE ROUTE 55 FROM INTERSTATE 405 TO INTERSTATE 5 ADD ONE MIXED-FLOW AND HIGH-OCCUPANCY LANE IN EACH DIRECTION AND FIX CHOKEPOINTS (TC) | $58.6M | — | — – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 24/25 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 24/25 | $57.9M | — | — – — |
| Department of Transportation | PROJECT TITLE: KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING REPLACE CONCRETE PAVEMENT LAN :::: PROJECT DESCRIPTION: KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING REPLACE CONCRETE PAVEMENT LANES WITH CONTINUOUSLY REINFORCED CONCRETE PAVEMENT. | $57.8M | — | — – Nov 2024 |
| Department of Transportation | IN ORANGE COUNTY ON RTE. 22/405 CONNECTOR , DIRECT HOV CONNECTORS & 2ND HOV LN* | $57.5M | FY2010 | Jan 2010 – — |
| Department of Transportation | PROJECT TITLE: IN SAN DIEGO COUNTY ON INTERSTATE 15 IN AND NEAR ESCONDIDO, FROM 0.2 MILE SOUTH OF ROUTE 15/78 SEPARATIONTO 0.5 MILE NORTH OF DEER SPRINGS ROAD OVERC :::: PROJECT DESCRIPTION: ON STATE ROUTE: 15. IN SAN DIEGO COUNTY ON INTERSTATE 15 IN AND NEAR ESCONDIDO, FROM 0.2 MILE SOUTH OF ROUTE 15/78 SEPARATIONTO 0.5 MILE NORTH OF DEER SPRINGS ROAD OVERCROSSING. REHABILITATE PAVEMENT BY REPLACING SECTIONS OF THE EXISTING PAVEMENT AND THE OUTSIDE SHOULDER WITH CONTINUOUSLY REINFORCED CONCRETE PAVEMENT (CRCP), PAVEMENT SLAB REPLACEMENT, BRIDGE APPROACH SLAB REPLACEMENT, BRIDGE JOINT SEAL WORK, AND SIGN PANEL REPLACEMENT. | $57.4M | — | — – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE - OWP 24/25 - CPG CONSOLIDATED PLANNING GRANT (CPG) PROJECT FOR OVERALL WORK PROGRAMS FOR FISCAL YEAR 2024/2025 (TC) :::: PROJECT DESCRIPTION: STATEWIDE - OWP 24/25 - CPG CONSOLIDATED PLANNING GRANT (CPG) PROJECT FOR OVERALL WORK PROGRAMS FOR FISCAL YEAR 2024/2025 (TC) | $57.4M | — | — – — |
| Department of Transportation | LA-005-45.4R/61.2R. IN AND NEAR SANTA CLARITA, FROM 0.5 MILES SOUTH OF I-5/SR-14 SEPARATION TO 1.7 MILES NORTH OF LAKE HUGHES ROAD UNDERCROSSING. RO | $57.1M | — | — – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 21/22 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 21/22 | $56.6M | — | — – — |
| Department of Transportation | SIXTH STREET VIADUCT OVER LA RIVER AND EAST SANTA ANNA FREEWAY, 53C1880, REPLACE STRUCT DEFICIENT VIADUCT WITH NEW (TC) | $56.2M | FY2012 | Apr 2012 – — |
| Department of Transportation | PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 19/20 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 19/20 | $56.1M | — | — – — |
| Department of Transportation | I-5 : FROM RTE 134 TO MAGNOLIA BLVD HOV LANES | $56M | FY2010 | May 2010 – — |
| Department of Transportation | STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2013-14 | $55.8M | FY2013 | Jun 2013 – — |
| Department of Transportation | PROJECT TITLE: NEAR CASTAIC, FROM NORTH OF LAKE HUGHES ROAD TO NORTH OF RESERVOIR HILL ROAD REHABILITATE PAVEMENT, UPGRADE GUARDRAIL, AND REPLACE OVERHEAD SIGN STRU :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. NEAR CASTAIC, FROM NORTH OF LAKE HUGHES ROAD TO NORTH OF RESERVOIR HILL ROAD REHABILITATE PAVEMENT, UPGRADE GUARDRAIL, AND REPLACE OVERHEAD SIGN STRUCTURE AND SIGN PANELS | $55.8M | FY2024 | Sep 2024 – May 2031 |
| Department of Transportation | PROJECT TITLE: SANTA BARBARA COUNTY NEAR GAVIOTA FROM 0.1 MILE NORTH OF GAVIOTA BEACH STATE PARKTO OLD COAST HIGHWAY REHABILITATE PAVEMENT :::: PROJECT DESCRIPTION: SANTA BARBARA COUNTY NEAR GAVIOTA FROM 0.1 MILE NORTH OF GAVIOTA BEACH STATE PARKTO OLD COAST HIGHWAY REHABILITATE PAVEMENT | $55.6M | — | — – Dec 2026 |
| Department of Transportation | ROUTE 71:ROUTE 10 TO SAN BERNARDINO COUNTY LINE-EXPRESSEAY TO FREEWAY CONVERSION- ADD 1 HOV LNE AND 1 MIXED FLOW LANE. ADD HOV LANE, AND 1 MIXED USE | $55.6M | — | — – — |
| Department of Transportation | PROJECT TITLE: KERN COUNTY, IN AND NEAR BAKERSFIELD, FROM 0.4 MILE SOUTH OF OLD US-99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING. RECONSTRUCT CONCRE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 99. KERN COUNTY, IN AND NEAR BAKERSFIELD, FROM 0.4 MILE SOUTH OF OLD US-99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING. RECONSTRUCT CONCRETE PAVEMENT WITH CRCP AND IMPROVE VERTICAL CLEARANCE AT OVERCROSSINGS. | $55.3M | — | — – Aug 2026 |
| Department of Transportation | I-10 CORRIDOR EXPRESS LANE WIDENING ON I-10 FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 | $55.2M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN THE CITIES OF LONG BEACH, LOS ANGELES, LOMITA, AND TORRANCE, FROM ORANGE COUNTY LINE TO PASEO DE LAS DELICIAS. UPGRADE AMERICANS WITH DISABILITIES :::: PROJECT DESCRIPTION: ON STATE ROUTE: 1. IN THE CITIES OF LONG BEACH, LOS ANGELES, LOMITA, AND TORRANCE, FROM ORANGE COUNTY LINE TO PASEO DE LAS DELICIAS. UPGRADE AMERICANS WITH DISABILITIES ACT (ADA) CURB RAMPS, ADD PEDESTRIAN AND BIKE IMPROVEMENTS AS COMPLETE STREETS ELEMENTS, UPGRADE GUARDRAIL, GRIND PAVEMENT, AND PLACE HOT MIX ASPHALT (HMA) AND RUBBERIZED HOT MIX ASPHALT (RHMA) PAVEMENT TO REHABILITATE PAVEMENT. | $55.1M | — | — – — |
| Department of Transportation | STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2013-14 | $55M | FY2013 | Jun 2013 – — |
| Department of Transportation | PROJECT TITLE: IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR :::: PROJECT DESCRIPTION: IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR GENERAL PURPOSE AND TWO EXPRESS LANES IN EACH DIRECTION WITH AUXILIARY LANES, WIDENING UNDER CROSSINGS, AND RECONSTRUCTION OF RAMPS AND LANE TRANSITIONS. (I-10 DESIGN BUILD CONTRACT 1). | $54.8M | — | — – — |
| Department of Transportation | PROJECT TITLE: KERN AND TULARE COUNTIES IN AND NEAR DELANO FROM 0.2 MILE SOUTH OF CECIL AVENUE OVERCROSSING TO 0.7 MILE NORTH OF AVENUE 100 OVERCROSSING REHABILITAT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 99. KERN AND TULARE COUNTIES IN AND NEAR DELANO FROM 0.2 MILE SOUTH OF CECIL AVENUE OVERCROSSING TO 0.7 MILE NORTH OF AVENUE 100 OVERCROSSING REHABILITATE ROADWAY, CONSTRUCT MEDIAN CONCRETE BARRIER, REPLACE SIGNS, REHABILITATE DRAINAGE SYSTEMS, UPGRADE TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS, AND REPLACE SIGNS. (G13 CONTINGENCY) WIDEN FROM 4-LANES TO 6-LANES. ALSO IN KERN COUNTY FROM 0.1 MILES SOUTH OF CECIL AVENUE OVERCROSSING TO COUNTY LINE RD. RESTRIPED THE NORTHBOUND LANES FROM LANES TO THREE LANES.) | $54.8M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN ORANGE COUNTY, IN BREA, FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING INTERCHANGE IMPROVEMENT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 57. IN ORANGE COUNTY, IN BREA, FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING INTERCHANGE IMPROVEMENT | $54.6M | — | — – Dec 2026 |
| Department of Transportation | PROJECT TITLE: IN SANTA CLARA COUNTY, IN CITY OF SAN JOSE, FROM ROUTE 85 TO WEST JULIAN STREET REHABILITATE ROADWAY, UPGRADE CONCRETE BARRIER, REPLACE DAMAGED SLABS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 87. IN SANTA CLARA COUNTY, IN CITY OF SAN JOSE, FROM ROUTE 85 TO WEST JULIAN STREET REHABILITATE ROADWAY, UPGRADE CONCRETE BARRIER, REPLACE DAMAGED SLABS, UPGRADE EXISTING ELECTRICAL SYSTEMS, REPAIR AREAS OF SETTLEMENT, UPGRADE GUARDRAILS & DRAINAGE, INSTALL RUMBLE STRIPS AND UPGRADE TRAFFIC SIGNS | $54.6M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN SACRAMENTO COUNTY ON ROUTE 50 FROM I-5 JUNCTION TO WATT AVE. ADD HIGH OCCUPANCY VEHICLE LANE AND PAVEMENT REHAB. :::: PROJECT DESCRIPTION: ON STATE ROUTE: 50. IN SACRAMENTO COUNTY ON ROUTE 50 FROM I-5 JUNCTION TO WATT AVE. ADD HIGH OCCUPANCY VEHICLE LANE AND PAVEMENT REHAB. | $54.5M | — | — – — |
| Department of Transportation | PROJECT TITLE: LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE SCHYULER HEIM BRIDGE REPLACEMENT (TC) :::: PROJECT DESCRIPTION: ON STATE ROUTE: 47. LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE SCHYULER HEIM BRIDGE REPLACEMENT (TC) | $54.5M | — | — – — |
| Department of Transportation | PROJECT TITLE: LOS ANGELES COUNTY, RTE 047, PM 0.4R/2.1. IN THE CITY OF LOS ANGELES, NEAR THE PORT OF LONG BEACH, AT VINCENT THOMAS BRIDGE NO. 53-1471. REPLACE BRID :::: PROJECT DESCRIPTION: ON STATE ROUTE: 47. LOS ANGELES COUNTY, RTE 047, PM 0.4R/2.1. IN THE CITY OF LOS ANGELES, NEAR THE PORT OF LONG BEACH, AT VINCENT THOMAS BRIDGE NO. 53-1471. REPLACE BRIDGE DECK AND SEISMIC SENSORS. THIS IS A CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC) PROJECT. REPLACE BRIDGE DECK AND SEISMIC SENSORS. | $54.3M | FY2026 | Dec 2025 – Aug 2033 |
| Department of Transportation | CONTRA COSTA, I680 FROM DUBLIN TO WALNUT CREEK, PAVEMENT REHAB/SOUTHBOUND HOV EXTENSION (TC) | $54.2M | FY2010 | Sep 2010 – — |
| Department of Transportation | PROJECT TITLE: NEVADA COUNTY NEAR GRASS VALLEY FROM 0.2 MILE SOUTH OF LA BARR MEADOWS ROAD TO 0.1 MILE NORTH OF MCKNIGHT WAY OVERCROSSING CONSTRUCT TWO-WAY LEFT-TUR :::: PROJECT DESCRIPTION: ON STATE ROUTE: 49. NEVADA COUNTY NEAR GRASS VALLEY FROM 0.2 MILE SOUTH OF LA BARR MEADOWS ROAD TO 0.1 MILE NORTH OF MCKNIGHT WAY OVERCROSSING CONSTRUCT TWO-WAY LEFT-TURN LANE, RIGHT-TURN LANES, 10-FOOT SHOULDERS, SLOW MOVING TRUCK LANE, ACCELERATION AND DECELERATION LANES AT THE DRIVEWAY TO THE NEVADA COUNTY TRANSIT OPERATION CENTER. | $53.6M | FY2025 | Aug 2025 – Jun 2030 |
| Department of Transportation | PROJECT TITLE: LA-010 - IN BALDWIN PARK AND WEST COVINA, FROM ROUTE 605 TO CITRUS AVENUE. REHABILITATE ROADWAY. THIS PROJECT WILL RESTORE THE EXISTING PAVEMENT ALON :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. LA-010 - IN BALDWIN PARK AND WEST COVINA, FROM ROUTE 605 TO CITRUS AVENUE. REHABILITATE ROADWAY. THIS PROJECT WILL RESTORE THE EXISTING PAVEMENT ALONG BOTH EASTBOUND (EB) AND WESTBOUND (WB) SIDES OF ROUTE 10 FROM EAST OF I-10/I-605 INTERCHANGE TO WEST OF SOUTH CITRUS STREET UNDERCROSSING (UC). | $53.3M | — | — – — |
| Department of Transportation | PROJECT TITLE: IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF UPGRADE 4-LANE FACILITY :::: PROJECT DESCRIPTION: ON STATE ROUTE: 101. IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF UPGRADE 4-LANE FACILITY | $53.1M | — | — – — |
Department of Transportation
$400M
PROJECT TITLE: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B DESIGN CM/GC PROJECT :::: PROJECT DESCRIPTION: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B DESIGN CM/GC PROJECT
Department of Transportation
$300M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25
Department of Transportation
$270.4M
IN SHA CO NR LAKEHEAD AT SACTO RVR,BR#06-0089 , REPLACE BRIDGE
Department of Transportation
$258.9M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2023-24 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2023-24
Department of Transportation
$254.5M
STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2011-16 (TC)
Department of Transportation
$243.8M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2022-23 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2022-23
Department of Transportation
$236.4M
SM CO NEAR PACIFIC ON RT 1 S/O LINDA MAR BLVD, CONSTRUCT TUNNELS, APPROACH RO
Department of Transportation
$235.5M
06/STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2014-15 (TC)
Department of Transportation
$225.1M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2021-22 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2021-22
Department of Transportation
$223.4M
STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2017-18 (TC)
Department of Transportation
$220M
IN THE CITY OF LONG BEACH AT THE GERALD DESMOND BRIDGE, BRIDGE REPLACEMENT
Department of Transportation
$194.5M
PROJECT TITLE: RIVERSIDE COUNTY ON ROUTE 10 NEAR COACHELLA FROM 1.8 MILES EAST OF DILLON ROAD UNDERCROSSING TO 0.53 MILES WEST OF EAST CACTUS CITY UNDERCROSSING. RE :::: PROJECT DESCRIPTION: RIVERSIDE COUNTY ON ROUTE 10 NEAR COACHELLA FROM 1.8 MILES EAST OF DILLON ROAD UNDERCROSSING TO 0.53 MILES WEST OF EAST CACTUS CITY UNDERCROSSING. REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS (DESIGN BUILD)
Department of Transportation
$189.9M
FROM PM 0.43 S/O LA-10 TO VENTURA BL. , WIDEN FOR HOV LANE
Department of Transportation
$189M
STATEWIDE , STATEWIDE PRELIM ENGINEERING SYS
Department of Transportation
$188.8M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26
Department of Transportation
$187.9M
STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2018-19
Department of Transportation
$184M
PROJECT TITLE: IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS.
Department of Transportation
$180.9M
PROJECT TITLE: LOS ANGELES COUNTY, ROUTE 14, POSTMILE R60.7/R77.0. IN AND NEAR PALMDALE AND LANDCASTER, FROM AVENUE P-8 TO THE KERN COUNTY LINE. REPLACE DISTRESSED :::: PROJECT DESCRIPTION: ON STATE ROUTE: 14. LOS ANGELES COUNTY, ROUTE 14, POSTMILE R60.7/R77.0. IN AND NEAR PALMDALE AND LANDCASTER, FROM AVENUE P-8 TO THE KERN COUNTY LINE. REPLACE DISTRESSED LANES/SHOULDERS, COLD PLANE AND OVERLAY RAMPS, UPGRADE GUARDRAIL, DIKES, SIGN PANELS, CURB RAMPS AND TRAFFIC LOOP DETECTORS REPLACE DISTRESSED SLABS WITH PRECAST CONCRETE PANELS. PLACE A BOND BREAKER BETWEEN THE UNDERLYING BASE AND NEW SLAB PAVEMENT. COLD PLANE AND OVERLAY ALONG THE TRAVEL LANES AND SHOULDERS. REPLACE ALL AFFECTED TRAFFIC LOOP DETECTORS. RECONSTRUCT GORE AREAS AND REMOVE EXISTING CURBED NOSES WITH THE SAME STRUCTURAL SECTION AS THE ADJACENT SHOULDER PAVEMENT. UPGRADE EXISTING CURB RAMPS TO CURRENT AMERICAN WITH DISABILITIES ACT (ADA) STANDARDS AND CONSTRUCT NEW ADA ACCESS AT ALL RAMP MODIFICATIONS WHERE PEDESTRIAN ACCESS EXITS. UPGRADE METAL BEAM GUARDRAIL AND END TREATMENTS THAT ARE SHORTER THAN 27 3/4 INCHES TALL TO THE NEW MIDWEST GUARDRAIL SYSTEM. REPLACE FADED ROADSIDE SIGNS WITH NEW SIGNS WHERE NEEDED AT MAINLINE AND RAMPS. UPGRADE EXISTING HIGHWAY LIGHTING SYSTEMS AND OVERHEAD SIGN LIGHTING WITH NEW ENERGY EFFICIENT LIGHTING AND THEFT-RESISTANCE PULL BOXES TO IMPROVE SYSTEM RELIABILITY.
Department of Transportation
$177.9M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2020-21 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2020-21
Department of Transportation
$177.1M
LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE, SCHYULER HEIM BRIDGE REPLACEMENT (TC)
Department of Transportation
$175.4M
PROJECT TITLE: ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HI :::: PROJECT DESCRIPTION: ON STATE ROUTE: 405. ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HIGHWAY WORKER SAFETY, UPGRADE SAFETY DEVICES, AND UPGRADE TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS. THIS IS A DESIGN-BUILD PROJECT.
Department of Transportation
$165M
IN AND THROUGH BAKERSFIELD FROM I-5 TO SR 58 AT COTTONWOOD - CENTENNIAL CORRIDOR, R/W AQUISITION (TC)
Department of Transportation
$163.3M
STATEWIDE , STATEWIDE PRELIM ENGINEERING SYS
Department of Transportation
$159.3M
RTE 5/10 SEPERATION TO 0.2 KM EAST OF RTE 605 , AC PAVEMENT, SHOULDERS, & RAMPS
Department of Transportation
$151.4M
PROJECT TITLE: IN SISKIYOU COUNTY AT AND NEAR DUNSMUIR FROM CENTRAL DUNSMUIR UNDERCROSSING TO BLACK BUTTE OVERHEAD. PAVEMENT REHABILITATION AND DECK REPLACEMENT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN SISKIYOU COUNTY AT AND NEAR DUNSMUIR FROM CENTRAL DUNSMUIR UNDERCROSSING TO BLACK BUTTE OVERHEAD. PAVEMENT REHABILITATION AND DECK REPLACEMENT
Department of Transportation
$148.7M
PROJECT TITLE: IN RIVERSIDE AND SAN BERNARDINO COUNTIES FROM 1.2 MILE SOUTH OF CANTU-GALLEANO RANCH RD OVERCROSSING IN EASTVALE TO 1.0 MILE NORTH OF BASELINE AVE OV :::: PROJECT DESCRIPTION: ON STATE ROUTE: 15. IN RIVERSIDE AND SAN BERNARDINO COUNTIES FROM 1.2 MILE SOUTH OF CANTU-GALLEANO RANCH RD OVERCROSSING IN EASTVALE TO 1.0 MILE NORTH OF BASELINE AVE OVERCROSSING IN FONTANA ADD ONE TO TWO EXPRESS LANES IN EACH DIRECTION BETWEEN CANTU-GALLEANO RANCH ROAD AND FOOTHILL BOULEVARD, ONE AUXILIARY LANE IN EACH DIRECTION BETWEEN SR-60 AND I-10
Department of Transportation
$148.6M
RT. 10 : FROM CITRUS AVE. TO RT. 57, CONSTRUCT HOV LANE IN BOTH DIRECTIONS
Department of Transportation
$134.9M
PROJECT TITLE: IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS
Department of Transportation
$134.9M
PROJECT TITLE: PLACER COUNTY ABOUT 9.4 MILES NORTH OF COLFAX FROM 0.5 MILES WEST OF MONTE VISTA OVERCROSSING TO 0.3 MILES EAST OF DRUM FOREBAY OVERCROSSING RDWY EXC :::: PROJECT DESCRIPTION: ON STATE ROUTE: 80. PLACER COUNTY ABOUT 9.4 MILES NORTH OF COLFAX FROM 0.5 MILES WEST OF MONTE VISTA OVERCROSSING TO 0.3 MILES EAST OF DRUM FOREBAY OVERCROSSING RDWY EXC,HMA,JPCP, ALT PIPELINER, STEEL SOLDIER PILE, MOD LTG SYSTEM.
Department of Transportation
$134.1M
STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2013-14
Department of Transportation
$130.2M
PROJECT TITLE: YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 50. YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE BEND) CRCP, HMA (TYPE A), RDWY EXC, CLASS 2 AB, FIVER OPTIC CABLE SYSTEMS.
Department of Transportation
$125.1M
PROJECT TITLE: IN HESPERIA AND VICTORVILLE FROM OAK HILL RD OC TO 0.1 MILE S/O BEAR VALLEY RD OC REHABILITATE EXISTING MAINLINE AND RAMP PAVEMENT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 15. IN HESPERIA AND VICTORVILLE FROM OAK HILL RD OC TO 0.1 MILE S/O BEAR VALLEY RD OC REHABILITATE EXISTING MAINLINE AND RAMP PAVEMENT
Department of Transportation
$124.6M
LA CO, IN LONG BEACH, CARSON, CPMT, PMT, LYNW , PAVING_REHABILITATION
Department of Transportation
$123M
ON STATE ROUTE 58 IN SAN BERNARDINO COUNTY A HENKLEY ***, RECONSTRUCTION (2 LANE TO 4 LANE EXPRESSWAY) (TC)
Department of Transportation
$123M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2019-20 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2019-20
Department of Transportation
$122.2M
STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2016-17 (TC)
Department of Transportation
$122.1M
SF ON RTE 101 FROM PM 8.8-9.2, DOYLE DR REPL , REPLACE/REHABILITATE ROADWAY
Department of Transportation
$122M
IN SAN BERNARDINO COUNTY NEAR DEVORE ON INTERSTATE ROUTE 15 ***, I-15 CAJON PASS DESIGN BUILD REHAB PROJEC (TC)
Department of Transportation
$119.4M
PROJECT TITLE: MOUNT VERNON AVENUE OVERHEAD AT THE BURLINGTON NORTHERN SANTA FE RAILROAD YARD FROM KING STREET TO 5TH STREET, BR. NO. 54C-0066 BRIDGE REPLACEMENT :::: PROJECT DESCRIPTION: MOUNT VERNON AVENUE OVERHEAD AT THE BURLINGTON NORTHERN SANTA FE RAILROAD YARD FROM KING STREET TO 5TH STREET, BR. NO. 54C-0066 BRIDGE REPLACEMENT
Department of Transportation
$119.1M
IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8 PARK PRESIDIO P3, DEPT DIRECTED CHANGES& SUPPT(TC)
Department of Transportation
$117.7M
PROJECT TITLE: IN SAN BERNARDINO FROM 0.4 MI W/O KERN CO LINE TO 7.5 MI E/O JCT 395 (KRAMER) CONSTRUCT 4-LANE DIVIDED EXPW ON NEW ALIGNMENT; SR 08/USR 395 IC & RR O :::: PROJECT DESCRIPTION: ON STATE ROUTE: 58. IN SAN BERNARDINO FROM 0.4 MI W/O KERN CO LINE TO 7.5 MI E/O JCT 395 (KRAMER) CONSTRUCT 4-LANE DIVIDED EXPW ON NEW ALIGNMENT; SR 08/USR 395 IC & RR OH BR(TC)
Department of Transportation
$117.2M
PROJECT TITLE: IN INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE. CONSTRUCT 4 LANE E :::: PROJECT DESCRIPTION: ON STATE ROUTE: 395. IN INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE. CONSTRUCT 4 LANE EXPRESSWAY.
Department of Transportation
$116M
STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2016-17 (TC)
Department of Transportation
$115.9M
IN AND NEAR GLENDALE & LA CANADA FLINTRIDGE FR DUNSMORE TO HAMPTON RD/FOOTHILL, PAVEMENT PRESERVATION (TC)
Department of Transportation
$114M
PROJECT TITLE: IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 11 AT 1.9 MILES EAST OF SANYO AVENUE UNDERCROSSING.PM 2.700/2.700 UNDERGROUND UTILITIES AND GRADING WORK :::: PROJECT DESCRIPTION: IN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 11 AT 1.9 MILES EAST OF SANYO AVENUE UNDERCROSSING.PM 2.700/2.700 UNDERGROUND UTILITIES AND GRADING WORK PACKAGE. FINE GRADING (INCLUDING IMPORTED BORROW), INSTALLATION OF SITE PERIMETER SECURITY FENCE, INSTALLATION OF WET AND DRY UTILITIES PIPE/CONDUITS, AND PROCUREMENT OF LONG LEAD ITEMS SUCH AS BORDER FENCE, HIGH MAST SITE LIGHTING, AND INSPECTION BOOTHS.
Department of Transportation
$111.8M
PROJECT TITLE: IN SAN JOAQUIN COUNTY, IN AND NEAR STOCKTON, FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE. REHABILITATE ROADWAY, UPGRAD :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN SAN JOAQUIN COUNTY, IN AND NEAR STOCKTON, FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE. REHABILITATE ROADWAY, UPGRADE LIGHTING, GUARDRAIL AND BRIDGE RAILING, INSTALL TRANSPORTATION MANAGEMENT SYSTEMS (TMS) ELEMENTS, REPLACE SIGNS, REHABILITATE DRAINAGE SYSTEMS, ENHANCE HIGHWAY WORKER SAFETY, AND UPGRADE FACILITIES TO AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS.
Department of Transportation
$111.3M
PROJECT TITLE: IN SAN DIEGO COUNTY ON ROUTE 78 FROM ROUTE 78/5 SEPARATION TO 0.3 MILE EAST OF ESCONDIDO BOULEVARD UNDERCROSSING REHABILITATE PAVEMENT, UPGRADE FACIL :::: PROJECT DESCRIPTION: ON STATE ROUTE: 78. IN SAN DIEGO COUNTY ON ROUTE 78 FROM ROUTE 78/5 SEPARATION TO 0.3 MILE EAST OF ESCONDIDO BOULEVARD UNDERCROSSING REHABILITATE PAVEMENT, UPGRADE FACILITIES TO AMERICANS WITH DISABILITIES ACT(ADA) STANDARDS, UPGRADE BRIDGE RAIL AND TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS REPLACE DAMAGED SIGN PANELS, MAKE OPERATIONAL IMPROVEMENTS TO REDUCE DELAY AND INSTALL FIBER OPTICS NETWORK.
Department of Transportation
$110.1M
PROJECT TITLE: IN LOS ANGELES CONUTY ON ROUTE 60 FROM 0.5 MILE WEST OF 60/710 SEPARATION TO ROUTE 60/605 SEPARATION AND ON ROUTE 710 FROM 0.5 MILE SOUTH OF 710/60 :::: PROJECT DESCRIPTION: ON STATE ROUTE: 60, 710. IN LOS ANGELES CONUTY ON ROUTE 60 FROM 0.5 MILE WEST OF 60/710 SEPARATION TO ROUTE 60/605 SEPARATION AND ON ROUTE 710 FROM 0.5 MILE SOUTH OF 710/60 SEPARATION. REHABILITATE PAVEMENT. FULL-DEPTH LANE REPLACMENT STRATEGY ON THE TWO OUTER PCC LANES, INSIDE AC LANE NEXT TO MEDIANSHOULDER, AND AUXILIARY LANES AT I-710/SR-60 INTERCHANGE. REPLACING DISTRESSED SLABS ON THE TOW INNER PCC LANES ON THE MAINLINE AND ON CONNECTORS AT I-710 AND SR-60 INTERCHANGE. COLD PLANNING/OVERLAYING AUXILIARY LANES AND SELECTED RAMPS AND SHOULDERS, REMOVING AND REPLACING APPROACH/DEPARTURE SLABS AND UPGRADING SAFETY FEATURES TO CURRENT STANDARDS.
Department of Transportation
$106.6M
STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2017-18 (TC)
Department of Transportation
$105.5M
STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2011-16 (TC)
Department of Transportation
$105.2M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2019-20 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2019-20
Department of Transportation
$105.1M
STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2017-18 (TC)
Department of Transportation
$104.3M
PROJECT TITLE: IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, IN :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, INCORPORATING AN ADDITIONAL NORTHBOUND TRUCK CLIMBING LANE FROM SR-14 TO CALGROVE BOULEVARD AND AN ADDITIONAL SOUTHBOUND TRUCK CLIMBING LANE FROM PICO CANYON ROAD/LYONS AVENUE TO SR-14. INCLUDES CONSTRUCTION OF ITS HUB ON ROUTE 5, PM 41.4 TO 43.8. EXTEND HOV LANES, ADD TRUCK CLIMBING LANES AND CONSTRUCT ITS HUB.
Department of Transportation
$104.3M
PROJECT TITLE: IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR :::: PROJECT DESCRIPTION: IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR GENERAL PURPOSE AND TWO EXPRESS LANES IN EACH DIRECTION WITH AUXILIARY LANES, WIDENING UNDER CROSSINGS, AND RECONSTRUCTION OF RAMPS AND LANE TRANSITIONS. (I-10 DESIGN BUILD CONTRACT 1).
Department of Transportation
$103.6M
GARVEE DEBT SER ($783,683,245.45) 2004A BONDS, 8 PROJECTS (SEE SEQ 7 SCOMMENT
Department of Transportation
$103.6M
IN SD CO IN SD ON RTE 5 AND 805 , DIRECT ACCESS RAMP & HOV LANES
Department of Transportation
$103.6M
PROJECT TITLE: IN SAN LUIS OBISPO COUNTY NEAR SHANDON FROM 0.2 MILE EAST OF SHANDON SAFETY ROADSIDEREST AREA TO 0.1 MILE WEST OF DAVIS ROAD CONVERT TO A FOUR LANE E :::: PROJECT DESCRIPTION: ON STATE ROUTE: 46. IN SAN LUIS OBISPO COUNTY NEAR SHANDON FROM 0.2 MILE EAST OF SHANDON SAFETY ROADSIDEREST AREA TO 0.1 MILE WEST OF DAVIS ROAD CONVERT TO A FOUR LANE EXPRESSWAY
Department of Transportation
$103.2M
IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS ALONG 1-5 FROM LOMAS SANTA FE DR. TO 0.5 MILE SOUTH OF PALOMAR AIRPORT RD. TO REPLACE THE SAN ELIJO LAGOON B
Department of Transportation
$102.9M
SM CO NEAR PACIFIC ON RT 1 S/O LINDA MAR BLVD , CONSTRUCT TUNNELS, APPROACH ROADS A
Department of Transportation
$101.1M
PROJECT TITLE: CONST BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERC :::: PROJECT DESCRIPTION: CONST BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1
Department of Transportation
$100.1M
I-5 CARPOOL LANE-ORANGE COUNTY LINE TO I-605 (SEGMENT 2) IN LA MIRADA WIDEN HOV LOCATION DETAILS SEGMENT 2.: IN LA MIRADA FROM ARTESIA BL TO NOR
Department of Transportation
$100M
CA - STATEWIDE ROLLING STOCK ACQUISITION
Department of Transportation
$100M
PROJECT TITLE: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B1 - CONSTRUCTION :::: PROJECT DESCRIPTION: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B1 - CONSTRUCTION
Department of Transportation
$100M
PROJECT TITLE: IN LOS ANGELES COUNT ON ROUTE 605 FROM TELEGRAPH ROAD TO ROUTE 10 (POSTMILES R10.2 TO 20.2). REHABILITATE ROADWAY, APPLY HIGH FRICTION SURFACE TREAT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 605. IN LOS ANGELES COUNT ON ROUTE 605 FROM TELEGRAPH ROAD TO ROUTE 10 (POSTMILES R10.2 TO 20.2). REHABILITATE ROADWAY, APPLY HIGH FRICTION SURFACE TREATMENT (HFST), UPGRADE FACILITIES TO AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS, UPGRADE GUARDRAIL, UPGRADE SIGNS, ENHANCE HIGHWAY WORKER SAFETY, AND REHABILITATE LANDSCAPING PAVEMENT REHABILITATION ON ROUTE 605 FROM TELEGRAPH ROAD TO ROUTE 10
Department of Transportation
$99M
PROJECT TITLE: IN LOS ANGELES COUNTY. ROUTE 57/60 CONFLUENCE CHOKEPOINT RELIEF PROGRAM. RECONSTRUCT GRAND AVENUE OVERCROSSING. RECONSTRUCT NORTHBOUND SR-57 CONNECTO :::: PROJECT DESCRIPTION: IN LOS ANGELES COUNTY. ROUTE 57/60 CONFLUENCE CHOKEPOINT RELIEF PROGRAM. RECONSTRUCT GRAND AVENUE OVERCROSSING. RECONSTRUCT NORTHBOUND SR-57 CONNECTOR TO EASTBOUND SR-60. CONSTRUCT EASTBOUND SR-60 BYPASS OFF-RAMP TO GRAND AVENUE. CONSTRUCT SOUTHBOUND INTERCHANGE MODIFICATIONS, INCLUDING AUXILIARY LANES AND THREE NEW BRIDGES
Department of Transportation
$97.4M
STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2018-19
Department of Transportation
$96.9M
PROJECT TITLE: (MCP CC3) MID COUNTY PARKWAY CONSTRUCTION CONTRACT #3MCP ALIGNMENT BETWEEN APPROX. ONE MILE EAST OF RIDER STREET TO WARREN ROAD ALONG RAMONA EXPRESSW :::: PROJECT DESCRIPTION: (MCP CC3) MID COUNTY PARKWAY CONSTRUCTION CONTRACT #3MCP ALIGNMENT BETWEEN APPROX. ONE MILE EAST OF RIDER STREET TO WARREN ROAD ALONG RAMONA EXPRESSWAY CONSTRUCT 2 ADDITIONAL LANES, MEDIAN BARRIERS, NEW BRIDGE OVER THE SAN JACINTO RIVER & TRAFFIC SIGNAL
Department of Transportation
$96.2M
RTE 24 - ALA 5.3/6.2(PM) AND CC 0.01/1.3(PM) , CONSTRUCT NEW 2-LANE BORE
Department of Transportation
$96.2M
RTE 24 - ALA 5.3/6.2(PM) AND CC 0.01/1.3(PM) , CONSTRUCT NEW 2-LANE BORE
Department of Transportation
$95.2M
IN L.A. COUNTY ON RTE. 05 FROM VISTA DEL LAGO TO KERN COUNTY LINE, REHABILITATE ROADWAY AND WIDEN MEDIAN SHLDRS (TC)
Department of Transportation
$94.9M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2023-24 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2023-24
Department of Transportation
$94.5M
PROJECT TITLE: IN THE CITIES OF SAN DIEGO, CHULA VISTA, AND NATIONAL CITY FROM CAMINO DE LA PLAZA TO 0.3 MILE SOUTH OF VIA DE LA VALLE. SD-005-R0.3/R36, REHABILITAT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN THE CITIES OF SAN DIEGO, CHULA VISTA, AND NATIONAL CITY FROM CAMINO DE LA PLAZA TO 0.3 MILE SOUTH OF VIA DE LA VALLE. SD-005-R0.3/R36, REHABILITATE PAVEMENT, DRAINAGE, AND SIGNS, UPGRADE TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS, AND UPGRADE FACILITIES TO AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS.
Department of Transportation
$93.6M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2021-22 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2021-22
Department of Transportation
$92M
06/STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2014-15 (TC)
Department of Transportation
$91.6M
KERN COUNTY IN BAKERSFIELD FROM BEARDSLEY CANAL BRIDGE TO RTE 46/99 SEPARATION, REPL #2 & #3 LANES W/CRCP & PLACE 10' JPCP OS (TC)
Department of Transportation
$91.4M
PROJECT TITLE: IN BELL, VERNON, COMMERCE AND EAST LOS ANGELES, FROM 0.2 MILES SOUTH OF SLAUSON AVENUE OVERCROSSING TO 0.1 MILES NORTH OF 3RD STREET OVERCROSSING, . :::: PROJECT DESCRIPTION: ON STATE ROUTE: 710. IN BELL, VERNON, COMMERCE AND EAST LOS ANGELES, FROM 0.2 MILES SOUTH OF SLAUSON AVENUE OVERCROSSING TO 0.1 MILES NORTH OF 3RD STREET OVERCROSSING, . REHABILITATE ROADWAY INCLUDING WIDENING MEDIAN, TRAVEL LANES, AND SHOULDERS TO MEET CURRENT STANDARDS. REHABILITATE EXISTING PAVEMENT. UPGRADE TRAVEL LANES AND SHOULDERS AND MEDIA BARRIERS TO CURRENT STANDARDS. (TC)
Department of Transportation
$90.6M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25
Department of Transportation
$90.2M
PROJECT TITLE: RIVERSIDE COUNTY FROM PENNSYLVANIA AVENUE UNDERCROSSING TO ROUTE 10/111 SEPARATION PAVEMENT REPLACEMENT, OVERLAY, CONCRETE SLAB, CURB RAMPS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. RIVERSIDE COUNTY FROM PENNSYLVANIA AVENUE UNDERCROSSING TO ROUTE 10/111 SEPARATION PAVEMENT REPLACEMENT, OVERLAY, CONCRETE SLAB, CURB RAMPS
Department of Transportation
$90.1M
PROJECT TITLE: IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS
Department of Transportation
$89.9M
PROJECT TITLE: IN PLUMAS COUNTY AT AND NEAR CROMBERG FROM GILL RANCH ROAD TO 0.2 MILE WEST OF BIG GRIZZLY CREEK BRIDGE. 3R ROADWAY REHABILITATION :::: PROJECT DESCRIPTION: ON STATE ROUTE: 70. IN PLUMAS COUNTY AT AND NEAR CROMBERG FROM GILL RANCH ROAD TO 0.2 MILE WEST OF BIG GRIZZLY CREEK BRIDGE. 3R ROADWAY REHABILITATION
Department of Transportation
$88.5M
GERALD DESMOND BRIDGE BR# 53C0065, BRIDGE REPLACEMENT
Department of Transportation
$88.5M
PROJECT TITLE: SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 WIDEN 2-LANE HIGHWAY TO 4-LANE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 156. SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 WIDEN 2-LANE HIGHWAY TO 4-LANE CONTROLLED ACCESS HIGHWAY
Department of Transportation
$88.5M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2020-21 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2020-21
Department of Transportation
$88.4M
I-215 CORRIDOR NORTH, SEGMENTS 1 AND 2 , HOV AND MIXED FLOW LANES
Department of Transportation
$87.8M
PROJECT TITLE: IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.3 MILE SOUTH OF SMITH RIVER BRIDGE TO 0.4 MILE NORTH OF SMITH RIVER BRIDGE REPLACE BRIDGE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 101. IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.3 MILE SOUTH OF SMITH RIVER BRIDGE TO 0.4 MILE NORTH OF SMITH RIVER BRIDGE REPLACE BRIDGE
Department of Transportation
$86.2M
PROJECT TITLE: GLENN COUNTY AT BUTTE CITY FROM ROUTE 45 TO 0.1 MILE EAST OF MCDOUGAL STREET REPLACE BRIDGE 11-0017 & VIADUCT APPROACH, RECONSTRUCT ROADWAY :::: PROJECT DESCRIPTION: ON STATE ROUTE: 162. GLENN COUNTY AT BUTTE CITY FROM ROUTE 45 TO 0.1 MILE EAST OF MCDOUGAL STREET REPLACE BRIDGE 11-0017 & VIADUCT APPROACH, RECONSTRUCT ROADWAY
Department of Transportation
$86M
PROJECT TITLE: YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 50. YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE BEND) CRCP, HMA (TYPE A), RDWY EXC, CLASS 2 AB, FIVER OPTIC CABLE SYSTEMS.
Department of Transportation
$86M
IN LMRD FR ARTESIA BL / COYOTE CK OC, ROADWAY WIDENING (TC)
Department of Transportation
$85.9M
PROJECT TITLE: I-80 AND US 50 IN SOLANO, YOLO, AND SACRAMENTO COUNTIES ON I-80 FROM THE I-80/KIDWELL ROAD INTERCHANGE IN SOLANO COUNTY, THROUGH YOLO COUNTY, TO THE :::: PROJECT DESCRIPTION: I-80 AND US 50 IN SOLANO, YOLO, AND SACRAMENTO COUNTIES ON I-80 FROM THE I-80/KIDWELL ROAD INTERCHANGE IN SOLANO COUNTY, THROUGH YOLO COUNTY, TO THE I-80/US 50 INTERCHANGE: CONSTRUCT IMPROVEMENTS CONSISTING OF MANAGED LANES IN EACH DIRECTION, PEDESTRIAN/BICYCLE IMPROVEMENTS, AND INTELLIGENT TRANSPORTATION SYSTEM (ITS) ELEMENTS (TC).
Department of Transportation
$85.8M
PROJECT TITLE: IN SAN DIEGO COUNTY IN SAN DIEGO FROM ROUTE 805/15 SEPARATION TO 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION. UPGRADE TMS ELEMENTS, CONCRETE PAVEMENT R :::: PROJECT DESCRIPTION: ON STATE ROUTE: 805. IN SAN DIEGO COUNTY IN SAN DIEGO FROM ROUTE 805/15 SEPARATION TO 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION. UPGRADE TMS ELEMENTS, CONCRETE PAVEMENT REHAB, DRAINAGE AND SIGNS
Department of Transportation
$85.5M
ON ROUTE 15 IN SAN BERNARDINO COUNTY IN RANCHO CUCAMONGA, ***, ROADWAY REHABILITAION (TC)
Department of Transportation
$85.2M
PROJECT TITLE: KERN COUNTY NEAR GRAPEVINE FROM 0.3 MILE SOUTH OF GRAPEVINE CREEK BRIDGE TO 0.5 MILE NORTH OF GRAPEVINE ROAD UNDERCROSSING REHABILITATE ROADWAY IN NO :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. KERN COUNTY NEAR GRAPEVINE FROM 0.3 MILE SOUTH OF GRAPEVINE CREEK BRIDGE TO 0.5 MILE NORTH OF GRAPEVINE ROAD UNDERCROSSING REHABILITATE ROADWAY IN NORTHBOUND DIRECTION WITH CONTINUOUSLY REINFORCED CONCRETE PAVEMENT AND JOINTED PLAIN CONCRETE, REPLACE SIGNS, UPGRADE GUARDRAIL AND TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS, AND REHABILITATE DRAINAGE SYSTEMS AND LIGHTING.
Department of Transportation
$85.1M
PROJECT TITLE: IN SAN LUIS OBISPO COUNTY AT AND NEAR CHOLAME ON ROUTE 41 FROM ROUTE 41/46 SEPARATION TO 0.8 MILE NORTH OF ROUTE 41/46 SEPARATION AND ON ROUTE 46 FRO :::: PROJECT DESCRIPTION: ON STATE ROUTE: 46. IN SAN LUIS OBISPO COUNTY AT AND NEAR CHOLAME ON ROUTE 41 FROM ROUTE 41/46 SEPARATION TO 0.8 MILE NORTH OF ROUTE 41/46 SEPARATION AND ON ROUTE 46 FROM 0.8 MILE WEST OF DAVIS ROAD TO 0.5 MILE WEST OF ANTELOPE ROAD. CONVERT TO A 4-LANE EXPRESSWAY AND CONSTRUCT NEW CONNECTORS.
Department of Transportation
$84.1M
IN IMPERIAL COUNTY NEAR EL CENTRO FROM 0.5 MILE WEST OF ROUTE 8/111 SEPARATION TO 0.6 MILE WEST OF ANDERHOLT ROAD OVERCROSSING AND FROM 0.5 MILE EAST
Department of Transportation
$83.9M
IN SAN BERNARDINO COUNTY NEAR DEVORE ON INTERSTATE ROUTES 15 AND 215 *, 1-15/1-215 DEVORE INTERCHANGE IMPROVEMENT ** (TC)
Department of Transportation
$83M
PROJECT TITLE: MONTEREY COUNTY, NEAR GORDA, 0.9 MILE NORTH OF VILLA CREEK BRIDGE TO 1.7 MILES NORTH OF RAIN ROCKS SIDEHILL VIADUCT. EMERGENCY RELIEF / OPENING - REM :::: PROJECT DESCRIPTION: ON STATE ROUTE: 1. MONTEREY COUNTY, NEAR GORDA, 0.9 MILE NORTH OF VILLA CREEK BRIDGE TO 1.7 MILES NORTH OF RAIN ROCKS SIDEHILL VIADUCT. EMERGENCY RELIEF / OPENING - REMOVE SLIDE DEBRIS AND RECONSTRUCT HIGHWAY.
Department of Transportation
$82.5M
PROJECT TITLE: SANTA BARBARA COUNTY IN AND NEAR CARPINTERIA AND AT SUMMERLAND FROM 0.9 MILE SOUTH OF SOUTH PADARO LANE UNDERCROSSING TO 0.6 MILE NORTH OF PADARO LANE :::: PROJECT DESCRIPTION: SANTA BARBARA COUNTY IN AND NEAR CARPINTERIA AND AT SUMMERLAND FROM 0.9 MILE SOUTH OF SOUTH PADARO LANE UNDERCROSSING TO 0.6 MILE NORTH OF PADARO LANE CONSTRUCT HOV LANES AND REHABILITATE ROADWAY
Department of Transportation
$82.2M
IN STA CO IN & NEAR TURLOCK, CERES, AND MODESTO FROM SJ CO LINE TO STA CO LINE, HIGHWAY REHABILITATION (TC)
Department of Transportation
$82.1M
PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 2025-27 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 2025-27
Department of Transportation
$82M
PROJECT TITLE: MONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE CONSTRUCT CONTINUOUS REINFORCED CONCRETE P :::: PROJECT DESCRIPTION: MONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE CONSTRUCT CONTINUOUS REINFORCED CONCRETE PAVEMENT, BRIDGE REHABILITATION AND MEDIAN BARRIER.
Department of Transportation
$81.7M
PROJECT TITLE: PLACER AND NEVADA COUNTIES NEAR KINGVALE FROM 0.3 MILE WEST OF TROY UNDERCROSSING TO 0.2 MILE EAST OF SODA SPRINGS OVERCROSSING. RDWAY EXC, PLACE HMA :::: PROJECT DESCRIPTION: ON STATE ROUTE: 80. PLACER AND NEVADA COUNTIES NEAR KINGVALE FROM 0.3 MILE WEST OF TROY UNDERCROSSING TO 0.2 MILE EAST OF SODA SPRINGS OVERCROSSING. RDWAY EXC, PLACE HMA & JPCP, SLAB REPLACEMENT & POLYESTER CONC OVERLAY
Department of Transportation
$81.5M
GERALD DESMOND BRIDGE BR# 53C0065 ., BRIDGE REPLACEMENT
Department of Transportation
$81.1M
PROJECT TITLE: ALAMEDA AND CONTRA COSTA COUNTIES AT SUNOL AND IN SAN RAMON FROM KOOPMANN ROADUNDERCROSSING TO 0.9 MILE NORTH OF ALCOSTA BOULEVARD OVERCROSSING PRECA :::: PROJECT DESCRIPTION: ON STATE ROUTE: 680. ALAMEDA AND CONTRA COSTA COUNTIES AT SUNOL AND IN SAN RAMON FROM KOOPMANN ROADUNDERCROSSING TO 0.9 MILE NORTH OF ALCOSTA BOULEVARD OVERCROSSING PRECAST CONC PVMT, ELECTRONIC TOLL SYSTEM, JPCP, CB & STRUCTURAL CONC. (TC)
Department of Transportation
$79.9M
IN SAN FRANCISCO ROUTE 101 POSTMILE 8.3 TO 9.8
Department of Transportation
$79.4M
PROJECT TITLE: CONST BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERC :::: PROJECT DESCRIPTION: ON STATE ROUTE: 55. CONST BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1
Department of Transportation
$78.7M
PROJECT TITLE: IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM ROUTE 10/177 SEPARATION TO 1.1 MILES WEST OF WILEY'S WELL ROAD OC REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS
Department of Transportation
$78.6M
SAN FRANCISCO - OAKLAND BAY BRIDGE REPLACE SFOBB EAST SPAN
Department of Transportation
$78.5M
PROJECT TITLE: I-5 NORTH COAST CORRIDOR HOV EXTENSION - PHASE 1 - ENCINITAS HOV (SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. I-5 NORTH COAST CORRIDOR HOV EXTENSION - PHASE 1 - ENCINITAS HOV (SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE NORTH OF PALOMAR AIRPORT ROAD OVERCROSSING). CONSTRUCT HOV LANES, SOUNDWALLS, CULVERT REHAB, ITS, AND BIKE TRAIL (CMGC).
Department of Transportation
$77.2M
PROJECT TITLE: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 5 SOLICITATION AS PART OF THE APPROVED FTIP INSTALLING AND OPERATING DIRECT CURRENT F :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 5 SOLICITATION AS PART OF THE APPROVED FTIP INSTALLING AND OPERATING DIRECT CURRENT FAST CHARGERS PRIMARILY SERVING MEDIUM- AND HEAVY-DUTY VEHICLES IN SPECIFIED REGIONS OF THE STATE NEAR DESIGNATED ALTERNATIVE FUEL CORRIDORS AS LISTED IN THE NEVI SOLICITATION 5 MANUAL AND IN THE FSTIP BACK-UP LIST.
Department of Transportation
$75.5M
PROJECT TITLE: IN RIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD CONSTRUCT SHOULDERS & RUMBLE STRIP :::: PROJECT DESCRIPTION: ON STATE ROUTE: 79. IN RIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD CONSTRUCT SHOULDERS & RUMBLE STRIP
Department of Transportation
$75.5M
PROJECT TITLE: ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN PRECAST CONCRETE PAVEMENT AND HMA :::: PROJECT DESCRIPTION: ON STATE ROUTE: 680. ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN PRECAST CONCRETE PAVEMENT AND HMA
Department of Transportation
$74.7M
PROJECT TITLE: IN RIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE FROM MONTE VISTA STREET TO GRAND AVENUE WIDEN ROADWAY TO STANDARD 12' LANES, ADD 2' MEDIAN BUFFER & 4' :::: PROJECT DESCRIPTION: ON STATE ROUTE: 74. IN RIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE FROM MONTE VISTA STREET TO GRAND AVENUE WIDEN ROADWAY TO STANDARD 12' LANES, ADD 2' MEDIAN BUFFER & 4' OUTSIDE SHOULDERS, INSTALL RUMBLE STRIPS, UPGRADE GUARDRAIL & REGRADE SIDE SLOPES
Department of Transportation
$73.9M
IN SD 1.2 KM E/O 805/905 TO 0.8KM E/O BRI. OC , CON
Department of Transportation
$73.7M
LA CO. FR 605/60 INTERCHANGE TO DIAMOND BAR UC, REHABILITATION PAVEMENT, PAVEMENT REHABILITATION (TC)
Department of Transportation
$73.6M
PROJECT TITLE: ALAMEDA AND CONTRA COSTA COUNTIES IN ALBANY AND CROCKETT FROM 0.4 MILE SOUTH OF ALAMEDA COUNTY LINE TO 0.2 MILE RHMA (OGFC), LIGHTING SYSTEM, AND CON :::: PROJECT DESCRIPTION: ON STATE ROUTE: 80. ALAMEDA AND CONTRA COSTA COUNTIES IN ALBANY AND CROCKETT FROM 0.4 MILE SOUTH OF ALAMEDA COUNTY LINE TO 0.2 MILE RHMA (OGFC), LIGHTING SYSTEM, AND CONCRETE BARRIER
Department of Transportation
$73.5M
ROUTE 10: PUENTE TO CITRUS, HOV LANES FROM 8 TO 10 LANES AND SOUNDWALLS(TC)
Department of Transportation
$72.9M
IN SAN BERNARDINO FROM 0.4 MI W/O KERN CO LINE TO 7.5 MI E/O JCT 395 (KRAMER) CONSTRUCT 4-LANE DIVIDED EXPW ON NEW ALIGNMENT; SR 08/USR 395 IC & RR O
Department of Transportation
$72.6M
IN BKERSFIELS SR58:FROM W/O SR99 TO COTTONWOOD RD. & SR99: WILSON RD TO MING AVE, OPERATIONAL INPROVEMENT/ INCLUDES AUXILLARY LANE
Department of Transportation
$72.3M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25
Department of Transportation
$72M
PROJECT TITLE: SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD REPLACE BRIDGE DECK, WIDEN CAL EXPO :::: PROJECT DESCRIPTION: ON STATE ROUTE: 51. SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD REPLACE BRIDGE DECK, WIDEN CAL EXPO UC, INSTALL BIKE PATH ON BRIDGE.
Department of Transportation
$71.9M
SIXTH STREET VIADUCT OVER LA RIVER, US 101, AND UPRR, BNSF, AMTRACK, LACMTA AND METROLINK TRACKS BRIDGE # 53C-1880 AND STATE BRIDGE # 53-0595 THIS
Department of Transportation
$71.8M
GARVEE DEBT SER ($783,683,245.45) 2004A BONDS , 8 PROJECTS (SEE SEQ 7 SCOMMENT) ***
Department of Transportation
$71.8M
PROJECT TITLE: I-15 FROM CAJALCO ROAD IN THE CITY OF CORONA TO STATE ROUTE 74 IN THE CITY OF LAKE ELSINORE EXTEND TOLL EXPRESS LANES SOUTH IN EACH TRAVEL DIRECTION :::: PROJECT DESCRIPTION: I-15 FROM CAJALCO ROAD IN THE CITY OF CORONA TO STATE ROUTE 74 IN THE CITY OF LAKE ELSINORE EXTEND TOLL EXPRESS LANES SOUTH IN EACH TRAVEL DIRECTION (TC)
Department of Transportation
$71.5M
PROJECT TITLE: FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING. RECONSTRUCT CONCRETE PA :::: PROJECT DESCRIPTION: ON STATE ROUTE: 99. FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING. RECONSTRUCT CONCRETE PAVEMENT AND OTHER REHABILITATION IMPROVEMENTS.
Department of Transportation
$71.3M
GARVEE DEBT SER ($783,683,245.45) 2004A BONDS, 8 PROJECTS (SEE SEQ 7 SCOMMENT
Department of Transportation
$71.2M
GARVEE DEBT SER ($783,683,245.45) 2004A BONDS, 8 PROJECTS (SEE SEQ 7 SCOMMENT
Department of Transportation
$71M
IN LA FR RTE 10 / RTE 101 , WIDEN FOR HOV LANE
Department of Transportation
$70.9M
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2022-23 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2022-23
Department of Transportation
$69.9M
STATEWIDE, STATEWIDE PRELIMINARY ENG SVCS
Department of Transportation
$69.9M
NEAR DESERT CENTER FROM 1.9 MI E/O CACTUS CITY REST AREA TO 0.4 MI E/O STATE RTE 177 JCT REHABILITATE PAVEMENT (TC)
Department of Transportation
$69.8M
IN AND NEAR SACRAMENTO FROM SAN JOAQUIN COUNTY LINE TO FLORIN ROAD OVERCROSSING, PAVEMENT REHABILITATION - (TC)
Department of Transportation
$69.7M
CONSOLIDATED PLANNING GRANT
Department of Transportation
$69.5M
PROJECT TITLE: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 4 SOLICITATION AS PART OF THE APPROVED FTIP. INSTALLING AND OPERATING DIRECT CURRENT :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 4 SOLICITATION AS PART OF THE APPROVED FTIP. INSTALLING AND OPERATING DIRECT CURRENT FAST CHARGERS PRIMARILY SERVING MEDIUM- AND HEAVY-DUTY VEHICLES IN SPECIFIED REGIONS OF THE STATE NEAR DESIGNATED ALTERNATIVE FUEL CORRIDORS AS LISTED IN THE NEVI SOLICITATION 4 MANUAL AND IN THE FSTIP BACK-UP LIST.
Department of Transportation
$69.2M
NORTH OAKLAND AERIAL STRUCTURES , SEISMIC RETROFIT
Department of Transportation
$68.6M
PROJECT TITLE: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 6 SOLICITATION AS PART OF THE APPROVED FTIP. INSTALLING AND OPERATING DIRECT CURRENT :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 6 SOLICITATION AS PART OF THE APPROVED FTIP. INSTALLING AND OPERATING DIRECT CURRENT FAST CHARGERS NEAR ALTERNATIVE FUEL CORRIDORS AS SPECIFIED IN THE NEVI SOLICITATION 6 MANUAL AND IN THE FSTIP BACK-UP LIST.
Department of Transportation
$67.7M
STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2016-17 (TC)
Department of Transportation
$67.7M
IN SHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING. WIDENING TO 6 LANES, BRIDGE REP
Department of Transportation
$67.5M
PROJECT TITLE: SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD REPLACE BRIDGE DECK, WIDEN CAL EXPO :::: PROJECT DESCRIPTION: ON STATE ROUTE: 51. SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD REPLACE BRIDGE DECK, WIDEN CAL EXPO UC, INSTALL BIKE PATH ON BRIDGE.
Department of Transportation
$66.8M
CA - STATEWIDE ROLLING STOCK ACQUISITION
Department of Transportation
$66.5M
PROJECT TITLE: STATEWIDE - OWP 25/26 - CPG CONSOLIDATED PLANNING GRANT (CPG) PROJECT FOR OVERALL WORK PROGRAMS FOR FISCAL YEAR 2025/2026 (TC) :::: PROJECT DESCRIPTION: STATEWIDE - OWP 25/26 - CPG CONSOLIDATED PLANNING GRANT (CPG) PROJECT FOR OVERALL WORK PROGRAMS FOR FISCAL YEAR 2025/2026 (TC)
Department of Transportation
$66.4M
PROJECT TITLE: IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM LOMAS SANTA FE DRIVE UNDERCROSSING TO 0.2 MILE NORTH OF OCEANSIDE BOULEVARD UNDERCROSSING I-5 NORTH COA :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM LOMAS SANTA FE DRIVE UNDERCROSSING TO 0.2 MILE NORTH OF OCEANSIDE BOULEVARD UNDERCROSSING I-5 NORTH COAST CORRIDOR HOV EXTENSION, PHASE 1, CARLSBAD SEG, PACKAGE 3. CONSTRUCT COMMUNITY ENHANCEMENTS; PLANT ESTABLISHMENT. CONSTRUCT SB AUX LANE.
Department of Transportation
$66.4M
IN THE CITY OF LONG BEACH AT THE GERALD DESMOND BRIDGE, BRIDGE REPLACEMENT
Department of Transportation
$65.9M
PROJECT TITLE: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 3 SOLICITATION INSTALLING AND OPERATING DIRECT CURRENT FAST CHARGERS ALONG SPECIFIED :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS - SEE BACK-UP LISTING ATTACHED FOR NEVI ROUND 3 SOLICITATION INSTALLING AND OPERATING DIRECT CURRENT FAST CHARGERS ALONG SPECIFIED CORRIDOR SEGMENTS OF ALTERNATIVE FUEL CORRIDORS LISTED IN THE NEVI SOLICITATION 3 MANUAL AND IN THE FSTIP BACK-UP LIST.
Department of Transportation
$65.8M
IN SISKIYOU COUNTY IN AND NEAR DUNSMUIR FROM SACRAMENTO RIVER BRIDGE TO 0.6 MILE SOUTH OF NORTH MOUNT SHASTA UNDERPASS. 2 R ROADWAY REHABILIATION - S
Department of Transportation
$65.8M
PROJECT TITLE: TULARE COUNTY IN AND NEAR TULARE FROM PROSPERITY AVENUE TO 1.2 MILES SOUTH OF AVENUE 280 OVERCROSSING WIDEN FREEWAY FROM FOUR TO SIX LANES :::: PROJECT DESCRIPTION: ON STATE ROUTE: 99. TULARE COUNTY IN AND NEAR TULARE FROM PROSPERITY AVENUE TO 1.2 MILES SOUTH OF AVENUE 280 OVERCROSSING WIDEN FREEWAY FROM FOUR TO SIX LANES
Department of Transportation
$65.7M
PROJECT TITLE: IN SAN JUAN CAPISTRANO AND MISSION VIEJO FROM ROUTE 73 TO OSO PARKWAY. ADD GENERAL PURPOSE LANE IN EACH DIRECTION AND RECONSTRUCT INTERCHANGES AT AVE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN SAN JUAN CAPISTRANO AND MISSION VIEJO FROM ROUTE 73 TO OSO PARKWAY. ADD GENERAL PURPOSE LANE IN EACH DIRECTION AND RECONSTRUCT INTERCHANGES AT AVERY PARKWAY.
Department of Transportation
$65.6M
I-10 CORRIDOR EXPRESS LANE WIDENING FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1 CONSTR
Department of Transportation
$65.1M
PROJECT TITLE: IN RIVERSIDE AND SAN BERNARDINO COUNTIES FROM 1.2 MILE SOUTH OF CANTU-GALLEANO RANCH RD OVERCROSSING IN EASTVALE TO 1.0 MILE NORTH OF BASELINE AVE OV :::: PROJECT DESCRIPTION: ON STATE ROUTE: 15. IN RIVERSIDE AND SAN BERNARDINO COUNTIES FROM 1.2 MILE SOUTH OF CANTU-GALLEANO RANCH RD OVERCROSSING IN EASTVALE TO 1.0 MILE NORTH OF BASELINE AVE OVERCROSSING IN FONTANA ADD ONE TO TWO EXPRESS LANES IN EACH DIRECTION BETWEEN CANTU-GALLEANO RANCH ROAD AND FOOTHILL BOULEVARD, ONE AUXILIARY LANE IN EACH DIRECTION BETWEEN SR-60 AND I-10
Department of Transportation
$65M
PROJECT TITLE: IN THE CITY OF CORONA AT THE JUNCTION OF SR-91 AND SR-71 NEAR THE ORANGE COUNTY LINE. REPLACE THE EB 91 TO NB 71 CONNECTOR WITH A DIRECT CONNECTOR AN :::: PROJECT DESCRIPTION: IN THE CITY OF CORONA AT THE JUNCTION OF SR-91 AND SR-71 NEAR THE ORANGE COUNTY LINE. REPLACE THE EB 91 TO NB 71 CONNECTOR WITH A DIRECT CONNECTOR AND RECONSTRUCT THE GREEN RIVER ROAD EB ON-RAMP
Department of Transportation
$64.7M
NEAR WINDSOR, FROM THE TOWN OF WINDSOR TO GEYSERVILLE. REHABILITATE ROADWAY (TC)
Department of Transportation
$64.6M
LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE, SCHYULER HEIM BRIDGE REPLACEMENT (TC)
Department of Transportation
$64.6M
PROJECT TITLE: IN VARIOUS CITIES, FROM ORANGE COUNTY LINE TO 0.1 MILE NORTH OF TELEGRAPH ROAD; ALSO ON ROUTE 91 FROM 0.2 MILE WEST OF ROUTE 605TO ROUTE 605 (PM R16. :::: PROJECT DESCRIPTION: ON STATE ROUTE: 605. IN VARIOUS CITIES, FROM ORANGE COUNTY LINE TO 0.1 MILE NORTH OF TELEGRAPH ROAD; ALSO ON ROUTE 91 FROM 0.2 MILE WEST OF ROUTE 605TO ROUTE 605 (PM R16.63/R16.83). PAVEMENT REHABILITATION CONSISTING OF FULL STRUCTURAL SECTION REPLACEMENT AND DAMAGED SLAB REPLACEMENT. COLD PLANE AND OVERLAY RUBBERIZED HOT MIX ASPHALT (RHMA-G) ON RIGHT SHOULDERS AND APPLY HIGH FRICTION SURFACE TREATMENT (HFST) ONRAMPS AND CONNECTORS. THE PURPOSE OF THIS PROJECT IS TO RESTORE THE FACILITY TO A STATE OF GOOD REPAIR BY REHABILITATING THE EXISTING PAVEMENT. FOR LANE REPLACEMENT, CONSTRUCTING A NEW PAVEMENT STRUCTURE WILL PROVIDE 40 YEARS OF SERVICE LIFE. REPLACING SLABS WILL PROVIDE 5 TO 10 YEARS OF SERVICE LIFE.
Department of Transportation
$64.3M
LA-005-45.4R/61.2R. IN AND NEAR SANTA CLARITA, FROM 0.5 MILES SOUTH OF I-5/SR-14 SEPARATION TO 1.7 MILES NORTH OF LAKE HUGHES ROAD UNDERCROSSING. RO
Department of Transportation
$64.1M
IN SAN BERNARDINO COUNTY *** , ROADWAY REHABILITATION
Department of Transportation
$64.1M
PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 23/24 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 23/24
Department of Transportation
$64M
PROJECT TITLE: IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MILE WEST OF CONVOY STREET OVERCROSSING TO 0.3 MILE EAST OF SANTO ROAD OVERCROSSING ROADWAY REHABILITATION :::: PROJECT DESCRIPTION: ON STATE ROUTE: 52. IN SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 MILE WEST OF CONVOY STREET OVERCROSSING TO 0.3 MILE EAST OF SANTO ROAD OVERCROSSING ROADWAY REHABILITATION TO MITIGATE HIGHWAY SETTLEMENT, CONSTRUCT AUXILIARY LANE, TRANSPORTATION MANAGEMENT SYSTEM (TMS), LIGHTING, AND ROADSIDE SAFETY IMPROVEMENTS.
Department of Transportation
$63.5M
PROJECT TITLE: ON I-80 THROUGH THE CITIES OF FAIRFIELD AND VACAVILLE IN SOLANO COUNTY, FROM (PM) 10.4 TO 30.2 SOLANO COUNTY: I-8O FROM RED TOP RD TO I-505:CONVER :::: PROJECT DESCRIPTION: ON STATE ROUTE: 80. ON I-80 THROUGH THE CITIES OF FAIRFIELD AND VACAVILLE IN SOLANO COUNTY, FROM (PM) 10.4 TO 30.2 SOLANO COUNTY: I-8O FROM RED TOP RD TO I-505:CONVERT EXISTING HOV TO MANAGED LANE; I-80 FROM AIR BASE PARKWAY TO I-505: CONSTRUCT NEW MANAGED LANES. RTP IDS 17-10-0059, 17-10-0056
Department of Transportation
$62.9M
PROJECT TITLE: IN SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD. REMOVE AND REPLACE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 99. IN SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD. REMOVE AND REPLACE COSUMNES RIVER AND COSUMNES RIVER OVERFLOW BRIDGES.
Department of Transportation
$62.9M
PROJECT TITLE: IN ALAMEDA COUNTY IN FREMONT AND NEWARK FROM SANTA CLARA COUNTY LINE TO 0.4 MILENORTH OF FREMONT BOULEVARD OVERCROSSING COLD PLANE PAVEMENT, OVERLAY :::: PROJECT DESCRIPTION: ON STATE ROUTE: 880. IN ALAMEDA COUNTY IN FREMONT AND NEWARK FROM SANTA CLARA COUNTY LINE TO 0.4 MILENORTH OF FREMONT BOULEVARD OVERCROSSING COLD PLANE PAVEMENT, OVERLAY WITH RHMA-G/RHMA-O
Department of Transportation
$62.7M
PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 22/23 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 22/23
Department of Transportation
$62.3M
ON I-205 AND I-580 FROM SAN JOAQUIN COUNTY LINE TO GREENVILLE ROAD OVERHEAD. RESURFACE AND RESTORE PAVEMENT ON THE MAINLINE AND RAMPS. (TC)
Department of Transportation
$61.9M
IN AND NEAR FREMONT, UNION CITY, HAYWARD, SAN LEANDRO, AND OAKLAND FROM 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING TO HIGH STREET SEPARATION AN
Department of Transportation
$61.9M
LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE SCHYULER HEIM BRIDGE REPLACEMENT (TC)
Department of Transportation
$61.7M
PROJECT TITLE: ON ROUTE 101, IN MARIN COUNTY, IN AND NEAR CITY OF NOVATO, FROM JUST SOUTH OF THE FRANKLIN AVENUE TO 0.3MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE. :::: PROJECT DESCRIPTION: ON STATE ROUTE: 101. ON ROUTE 101, IN MARIN COUNTY, IN AND NEAR CITY OF NOVATO, FROM JUST SOUTH OF THE FRANKLIN AVENUE TO 0.3MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE. WIDEN ROUTE 101 TO CONSTRUCT A SOUTHBOUND HOV LANE FROM 0.3 MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE TO JUST SOUTH OF THE FRANKLIN AVENUE OVERHEAD (6.0 MILES), AND A NORTHBOUND HOV LANE FROM 1.7 MILES NORTH OF THE ATHERTON AVENUE OVERCROSSING TO 0.3 MILES SOUTH OF THE MARIN/SONOMA COUNTY LINE (3.5 MILES). THE PROJECT INCLUDES ROADWAY AND BRIDGE WIDENING FOR HOV LANES AND STANDARD SHOULDERS. THE PROJECT WILL ALSO UPGRADE THE HORIZONTAL AND VERTICAL ROADWAY ALIGNMENT (FOR A 70 MPH DESIGN SPEED), MODIFY THE REDWOOD LANDFILL INTERCHANGE RAMPS TO CONFORM WITH THE NEW ALIGNMENT, AND RESTRIPE A FRONTAGE ROAD (REDWOOD BOULEVARD) FOR CLASS II BIKE LANES IN NOVATO.)
Department of Transportation
$60.5M
IN SACRAMENTO AND WEST SACRAMENTO FROM 80/84 SEPARATION TO WATT AVENUE OVERCROSS, CONST. HOV LANES & REHAB. ROADWAY - (TC)
Department of Transportation
$59.8M
PROJECT TITLE: LA-057, IN LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION THE PROJECT IS LOCATED IN LOS ANG :::: PROJECT DESCRIPTION: ON STATE ROUTE: 57. LA-057, IN LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION THE PROJECT IS LOCATED IN LOS ANGELES COUNTY ON ROUTE 57 FROM ORANGE COUNTY LINE TO ROUTE 57/60 INTERCHANGE. THE PROJECT PROPOSES TO REPLACE FULL PAVEMENT STRUCTURE ON LANES 2 AND 3; REPLACE DISTRESSED INDIVIDUAL SLABS IN LANES 1, 4 AND HIGH OCCUPANCY VEHICLE (HOV); UPGRADE MEDIAN CONCRETE BARRIER TO TYPE 60; COLD PLANE AND OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (RHMA) AND HMA PAVEMENTS ON RAMPS AND RECONSTRUCT 3 OFF-RAMP TERMINI. OTHER IMPROVEMENTS INCLUDE: GUARDRAIL, SIGN STRUCTURES AND PANELS; UPGRADE AC DIKES; ADA RAMPS AND TRAFFIC LOOP DETECTORS; AND INSTALL 8 BEST MANAGEMENT PRACTICE (BMP) DEVICES RECOMMENDED BY THE CORRIDOR STORMWATER MANAGEMENT STUDY.
Department of Transportation
$59.8M
I-10 FROM RTE.605 TO PUENTE AVE. , CONS.ONE HOV LANE IN EACH DIRECTION
Department of Transportation
$59.4M
CITY OF BAKERSFIELD: CENTENNIAL CORRIDOR PROJECT: I-5 TO SR 58 AT COTTONWOOD RD., CONSTRUCT NEW 6-LANE FREEWAY
Department of Transportation
$59M
IN AND NEAR THE CITIES OF LOS ANGELES, CALABASAS AND AGOURA HILLS FROM SR170 TO, REHABILITATION PAVEMENT CONDITIONS (TC)
Department of Transportation
$58.7M
PROJECT TITLE: SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD. DREDGE, CONSTRUCT IN-WATER FOUNDATI :::: PROJECT DESCRIPTION: SACRAMENTO COUNTY IN SACRAMENTO FROM 0.4 MILE SOUTH OF ELVAS UNDERPASS TO 0.1 MILE NORTH OF EXPOSITION BOULEVARD. DREDGE, CONSTRUCT IN-WATER FOUNDATION.
Department of Transportation
$58.6M
STATE ROUTE 55 FROM INTERSTATE 405 TO INTERSTATE 5 ADD ONE MIXED-FLOW AND HIGH-OCCUPANCY LANE IN EACH DIRECTION AND FIX CHOKEPOINTS (TC)
Department of Transportation
$57.9M
PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 24/25 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 24/25
Department of Transportation
$57.8M
PROJECT TITLE: KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING REPLACE CONCRETE PAVEMENT LAN :::: PROJECT DESCRIPTION: KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING REPLACE CONCRETE PAVEMENT LANES WITH CONTINUOUSLY REINFORCED CONCRETE PAVEMENT.
Department of Transportation
$57.5M
IN ORANGE COUNTY ON RTE. 22/405 CONNECTOR , DIRECT HOV CONNECTORS & 2ND HOV LN*
Department of Transportation
$57.4M
PROJECT TITLE: IN SAN DIEGO COUNTY ON INTERSTATE 15 IN AND NEAR ESCONDIDO, FROM 0.2 MILE SOUTH OF ROUTE 15/78 SEPARATIONTO 0.5 MILE NORTH OF DEER SPRINGS ROAD OVERC :::: PROJECT DESCRIPTION: ON STATE ROUTE: 15. IN SAN DIEGO COUNTY ON INTERSTATE 15 IN AND NEAR ESCONDIDO, FROM 0.2 MILE SOUTH OF ROUTE 15/78 SEPARATIONTO 0.5 MILE NORTH OF DEER SPRINGS ROAD OVERCROSSING. REHABILITATE PAVEMENT BY REPLACING SECTIONS OF THE EXISTING PAVEMENT AND THE OUTSIDE SHOULDER WITH CONTINUOUSLY REINFORCED CONCRETE PAVEMENT (CRCP), PAVEMENT SLAB REPLACEMENT, BRIDGE APPROACH SLAB REPLACEMENT, BRIDGE JOINT SEAL WORK, AND SIGN PANEL REPLACEMENT.
Department of Transportation
$57.4M
PROJECT TITLE: STATEWIDE - OWP 24/25 - CPG CONSOLIDATED PLANNING GRANT (CPG) PROJECT FOR OVERALL WORK PROGRAMS FOR FISCAL YEAR 2024/2025 (TC) :::: PROJECT DESCRIPTION: STATEWIDE - OWP 24/25 - CPG CONSOLIDATED PLANNING GRANT (CPG) PROJECT FOR OVERALL WORK PROGRAMS FOR FISCAL YEAR 2024/2025 (TC)
Department of Transportation
$57.1M
LA-005-45.4R/61.2R. IN AND NEAR SANTA CLARITA, FROM 0.5 MILES SOUTH OF I-5/SR-14 SEPARATION TO 1.7 MILES NORTH OF LAKE HUGHES ROAD UNDERCROSSING. RO
Department of Transportation
$56.6M
PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 21/22 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 21/22
Department of Transportation
$56.2M
SIXTH STREET VIADUCT OVER LA RIVER AND EAST SANTA ANNA FREEWAY, 53C1880, REPLACE STRUCT DEFICIENT VIADUCT WITH NEW (TC)
Department of Transportation
$56.1M
PROJECT TITLE: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 19/20 :::: PROJECT DESCRIPTION: STATEWIDE STATE PLANNING AND RESEARCH PROGRAM, PART I FY 19/20
Department of Transportation
$56M
I-5 : FROM RTE 134 TO MAGNOLIA BLVD HOV LANES
Department of Transportation
$55.8M
STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2013-14
Department of Transportation
$55.8M
PROJECT TITLE: NEAR CASTAIC, FROM NORTH OF LAKE HUGHES ROAD TO NORTH OF RESERVOIR HILL ROAD REHABILITATE PAVEMENT, UPGRADE GUARDRAIL, AND REPLACE OVERHEAD SIGN STRU :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. NEAR CASTAIC, FROM NORTH OF LAKE HUGHES ROAD TO NORTH OF RESERVOIR HILL ROAD REHABILITATE PAVEMENT, UPGRADE GUARDRAIL, AND REPLACE OVERHEAD SIGN STRUCTURE AND SIGN PANELS
Department of Transportation
$55.6M
PROJECT TITLE: SANTA BARBARA COUNTY NEAR GAVIOTA FROM 0.1 MILE NORTH OF GAVIOTA BEACH STATE PARKTO OLD COAST HIGHWAY REHABILITATE PAVEMENT :::: PROJECT DESCRIPTION: SANTA BARBARA COUNTY NEAR GAVIOTA FROM 0.1 MILE NORTH OF GAVIOTA BEACH STATE PARKTO OLD COAST HIGHWAY REHABILITATE PAVEMENT
Department of Transportation
$55.6M
ROUTE 71:ROUTE 10 TO SAN BERNARDINO COUNTY LINE-EXPRESSEAY TO FREEWAY CONVERSION- ADD 1 HOV LNE AND 1 MIXED FLOW LANE. ADD HOV LANE, AND 1 MIXED USE
Department of Transportation
$55.3M
PROJECT TITLE: KERN COUNTY, IN AND NEAR BAKERSFIELD, FROM 0.4 MILE SOUTH OF OLD US-99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING. RECONSTRUCT CONCRE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 99. KERN COUNTY, IN AND NEAR BAKERSFIELD, FROM 0.4 MILE SOUTH OF OLD US-99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING. RECONSTRUCT CONCRETE PAVEMENT WITH CRCP AND IMPROVE VERTICAL CLEARANCE AT OVERCROSSINGS.
Department of Transportation
$55.2M
I-10 CORRIDOR EXPRESS LANE WIDENING ON I-10 FROM SAN ANTONIO AVENUE IN THE CITY OF POMONA TO THE I-10/I-15 INTERCHANGE IN THE CITY OF ONTARIO, PHASE 1
Department of Transportation
$55.1M
PROJECT TITLE: IN THE CITIES OF LONG BEACH, LOS ANGELES, LOMITA, AND TORRANCE, FROM ORANGE COUNTY LINE TO PASEO DE LAS DELICIAS. UPGRADE AMERICANS WITH DISABILITIES :::: PROJECT DESCRIPTION: ON STATE ROUTE: 1. IN THE CITIES OF LONG BEACH, LOS ANGELES, LOMITA, AND TORRANCE, FROM ORANGE COUNTY LINE TO PASEO DE LAS DELICIAS. UPGRADE AMERICANS WITH DISABILITIES ACT (ADA) CURB RAMPS, ADD PEDESTRIAN AND BIKE IMPROVEMENTS AS COMPLETE STREETS ELEMENTS, UPGRADE GUARDRAIL, GRIND PAVEMENT, AND PLACE HOT MIX ASPHALT (HMA) AND RUBBERIZED HOT MIX ASPHALT (RHMA) PAVEMENT TO REHABILITATE PAVEMENT.
Department of Transportation
$55M
STATEWIDE, STATEWIDE PRELIMINARY ENGINEERING 2013-14
Department of Transportation
$54.8M
PROJECT TITLE: IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR :::: PROJECT DESCRIPTION: IN SAN BERNARDINO COUNTY ON INTERSTATE 10 BETWEEN SAN ANTONIO AVENUE AND ROUTE 15. IMPLEMENT TWO EXPRESS LANES IN EACH DIRECTION FOR A TOTAL OF FOUR GENERAL PURPOSE AND TWO EXPRESS LANES IN EACH DIRECTION WITH AUXILIARY LANES, WIDENING UNDER CROSSINGS, AND RECONSTRUCTION OF RAMPS AND LANE TRANSITIONS. (I-10 DESIGN BUILD CONTRACT 1).
Department of Transportation
$54.8M
PROJECT TITLE: KERN AND TULARE COUNTIES IN AND NEAR DELANO FROM 0.2 MILE SOUTH OF CECIL AVENUE OVERCROSSING TO 0.7 MILE NORTH OF AVENUE 100 OVERCROSSING REHABILITAT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 99. KERN AND TULARE COUNTIES IN AND NEAR DELANO FROM 0.2 MILE SOUTH OF CECIL AVENUE OVERCROSSING TO 0.7 MILE NORTH OF AVENUE 100 OVERCROSSING REHABILITATE ROADWAY, CONSTRUCT MEDIAN CONCRETE BARRIER, REPLACE SIGNS, REHABILITATE DRAINAGE SYSTEMS, UPGRADE TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS, AND REPLACE SIGNS. (G13 CONTINGENCY) WIDEN FROM 4-LANES TO 6-LANES. ALSO IN KERN COUNTY FROM 0.1 MILES SOUTH OF CECIL AVENUE OVERCROSSING TO COUNTY LINE RD. RESTRIPED THE NORTHBOUND LANES FROM LANES TO THREE LANES.)
Department of Transportation
$54.6M
PROJECT TITLE: IN ORANGE COUNTY, IN BREA, FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING INTERCHANGE IMPROVEMENT :::: PROJECT DESCRIPTION: ON STATE ROUTE: 57. IN ORANGE COUNTY, IN BREA, FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING INTERCHANGE IMPROVEMENT
Department of Transportation
$54.6M
PROJECT TITLE: IN SANTA CLARA COUNTY, IN CITY OF SAN JOSE, FROM ROUTE 85 TO WEST JULIAN STREET REHABILITATE ROADWAY, UPGRADE CONCRETE BARRIER, REPLACE DAMAGED SLABS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 87. IN SANTA CLARA COUNTY, IN CITY OF SAN JOSE, FROM ROUTE 85 TO WEST JULIAN STREET REHABILITATE ROADWAY, UPGRADE CONCRETE BARRIER, REPLACE DAMAGED SLABS, UPGRADE EXISTING ELECTRICAL SYSTEMS, REPAIR AREAS OF SETTLEMENT, UPGRADE GUARDRAILS & DRAINAGE, INSTALL RUMBLE STRIPS AND UPGRADE TRAFFIC SIGNS
Department of Transportation
$54.5M
PROJECT TITLE: IN SACRAMENTO COUNTY ON ROUTE 50 FROM I-5 JUNCTION TO WATT AVE. ADD HIGH OCCUPANCY VEHICLE LANE AND PAVEMENT REHAB. :::: PROJECT DESCRIPTION: ON STATE ROUTE: 50. IN SACRAMENTO COUNTY ON ROUTE 50 FROM I-5 JUNCTION TO WATT AVE. ADD HIGH OCCUPANCY VEHICLE LANE AND PAVEMENT REHAB.
Department of Transportation
$54.5M
PROJECT TITLE: LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE SCHYULER HEIM BRIDGE REPLACEMENT (TC) :::: PROJECT DESCRIPTION: ON STATE ROUTE: 47. LOS ANGELES COUNTY LONG BEACH - SCHUYLER HEIM BRIDGE #53-2618 - REPLACE BRIDGE SCHYULER HEIM BRIDGE REPLACEMENT (TC)
Department of Transportation
$54.3M
PROJECT TITLE: LOS ANGELES COUNTY, RTE 047, PM 0.4R/2.1. IN THE CITY OF LOS ANGELES, NEAR THE PORT OF LONG BEACH, AT VINCENT THOMAS BRIDGE NO. 53-1471. REPLACE BRID :::: PROJECT DESCRIPTION: ON STATE ROUTE: 47. LOS ANGELES COUNTY, RTE 047, PM 0.4R/2.1. IN THE CITY OF LOS ANGELES, NEAR THE PORT OF LONG BEACH, AT VINCENT THOMAS BRIDGE NO. 53-1471. REPLACE BRIDGE DECK AND SEISMIC SENSORS. THIS IS A CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CMGC) PROJECT. REPLACE BRIDGE DECK AND SEISMIC SENSORS.
Department of Transportation
$54.2M
CONTRA COSTA, I680 FROM DUBLIN TO WALNUT CREEK, PAVEMENT REHAB/SOUTHBOUND HOV EXTENSION (TC)
Department of Transportation
$53.6M
PROJECT TITLE: NEVADA COUNTY NEAR GRASS VALLEY FROM 0.2 MILE SOUTH OF LA BARR MEADOWS ROAD TO 0.1 MILE NORTH OF MCKNIGHT WAY OVERCROSSING CONSTRUCT TWO-WAY LEFT-TUR :::: PROJECT DESCRIPTION: ON STATE ROUTE: 49. NEVADA COUNTY NEAR GRASS VALLEY FROM 0.2 MILE SOUTH OF LA BARR MEADOWS ROAD TO 0.1 MILE NORTH OF MCKNIGHT WAY OVERCROSSING CONSTRUCT TWO-WAY LEFT-TURN LANE, RIGHT-TURN LANES, 10-FOOT SHOULDERS, SLOW MOVING TRUCK LANE, ACCELERATION AND DECELERATION LANES AT THE DRIVEWAY TO THE NEVADA COUNTY TRANSIT OPERATION CENTER.
Department of Transportation
$53.3M
PROJECT TITLE: LA-010 - IN BALDWIN PARK AND WEST COVINA, FROM ROUTE 605 TO CITRUS AVENUE. REHABILITATE ROADWAY. THIS PROJECT WILL RESTORE THE EXISTING PAVEMENT ALON :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. LA-010 - IN BALDWIN PARK AND WEST COVINA, FROM ROUTE 605 TO CITRUS AVENUE. REHABILITATE ROADWAY. THIS PROJECT WILL RESTORE THE EXISTING PAVEMENT ALONG BOTH EASTBOUND (EB) AND WESTBOUND (WB) SIDES OF ROUTE 10 FROM EAST OF I-10/I-605 INTERCHANGE TO WEST OF SOUTH CITRUS STREET UNDERCROSSING (UC).
Department of Transportation
$53.1M
PROJECT TITLE: IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF UPGRADE 4-LANE FACILITY :::: PROJECT DESCRIPTION: ON STATE ROUTE: 101. IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF UPGRADE 4-LANE FACILITY
Source: Federal Audit Clearinghouse (fac.gov)
No federal single audit records found for this organization.
Single audits are required for entities expending $750,000+ in federal awards annually.
Tax Year 2024 · Source: IRS e-Filed Form 990
Individuals serving as officers, directors, or trustees of the organization.
| Name | Title | Hrs/Wk | Compensation | Related Orgs | Other |
|---|
Source: IRS Publication 78, Auto-Revocation List & e-Postcard Data
Tax-deductible contributions: Not confirmed
No additional tax-exempt status records found in ReconForce's database.
Sources: IRS e-Filed Form 990 (XML) & ProPublica Nonprofit Explorer
Scroll →
| Year | Revenue | Contributions | Expenses | Assets | Net Assets |
|---|---|---|---|---|---|
| 2024IRS e-File | $814.9K | $802.5K | $628.2K | $750.5K | $750.5K |
| 2023 | $415.1K | $400K | $364K | $563.8K | $563.8K |
| 2022 | $401K | $400K | $321.9K | $512.7K | $512.7K |
| 2021 | $378K | $377.5K |
Sources: ProPublica Nonprofit Explorer & IRS e-File Index
| Tax Year | Form Type | Source | Documents |
|---|---|---|---|
| 2024 | 990 | IRS e-File | PDF not yet published by IRSView Filing → |
| 2023 | 990 | DataIRS e-File | |
| 2022 | 990 | DataIRS e-File |
Financial data: IRS e-Filed Form 990 (Tax Year 2024)
Leadership & compensation: IRS e-Filed Form 990, Part VII (Tax Year 2024)
Federal grants: USAspending.gov (live)
Organization info: IRS Business Master File
| Total |
|---|
| Kiana Valentine | Executive Director | 15 | $0 | $0 | $0 | $0 |
| Steve Clark | Chair | 2 | $0 | $0 | $0 | $0 |
| Steve Agor | Treasurer | 1 | $0 | $0 | $0 | $0 |
| Joseph Cruz | Secretary | 1 | $0 | $0 | $0 | $0 |
| Matt Cremins | Director | 1 | $0 | $0 | $0 | $0 |
Kiana Valentine
Executive Director
$0
Hrs/Wk
15
Compensation
$0
Related Orgs
$0
Other
$0
Steve Clark
Chair
$0
Hrs/Wk
2
Compensation
$0
Related Orgs
$0
Other
$0
Steve Agor
Treasurer
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
Joseph Cruz
Secretary
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
Matt Cremins
Director
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
Members of the governing board. Board members often serve without compensation.
| Name | Title | Hrs/Wk | Compensation | Related Orgs | Other | Total |
|---|---|---|---|---|---|---|
| Ernesto Ordonez | Director | 1 | $0 | $0 | $0 | $0 |
| James Halloran | Director | 1 | $0 | $0 | $0 | $0 |
| Jamie Angus | Director | 1 | $0 | $0 | $0 | $0 |
| Jay Bradshaw | Director | 1 | $0 | $0 | $0 | $0 |
| Jeff Turner | Director | 1 | $0 | $0 | $0 | $0 |
| Jon Preciado | Director | 1 |
Ernesto Ordonez
Director
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
James Halloran
Director
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
Jamie Angus
Director
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
| $251.1K |
| $433.6K |
| $433.6K |
| 2020 | $333K | $332.5K | $275.2K | $306.7K | $306.7K |
| 2019 | $326.1K | $325.8K | $292.4K | $248.9K | $248.9K |
| 2018 | $657.9K | $557.2K | $784.1K | $215.2K | $215.2K |
| 2017 | $683.5K | $683.4K | $535.4K | $341.4K | $341.4K |
| 2015 | $486.7K | $486.7K | $417.5K | $211.2K | $211.2K |
| 2014 | $504.8K | $502.5K | $591.7K | $142K | $142K |
| 2013 | $821K | $821K | $624.9K | $229K | $229K |
| 2012 | $423.5K | $423.5K | $497.1K | $32.9K | $32.9K |
| 2011 | $591.5K | $591.5K | $529K | $106.5K | $106.5K |
| 2021 | 990 | Data |
| 2020 | 990 | Data |
| 2019 | 990 | Data |
| 2018 | 990 | Data |
| 2017 | 990 | Data | PDF not yet published by IRS |
| 2015 | 990 | Data |
| 2014 | 990 | Data |
| 2013 | 990 | Data |
| 2012 | 990 | Data |
| 2011 | 990 | Data |
| 2010 | 990 | — |
| 2009 | 990-EZ | — |
| 2008 | 990-EZ | — |
| 2007 | 990 | — |
| 2006 | 990 | — |
| 2005 | 990 | — |
| $0 |
| $0 |
| $0 |
| $0 |
| Rich Gates | Director | 1 | $0 | $0 | $0 | $0 |
| Ron Rowlett | Director | 1 | $0 | $0 | $0 | $0 |
Jay Bradshaw
Director
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
Jeff Turner
Director
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
Jon Preciado
Director
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
Rich Gates
Director
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
Ron Rowlett
Director
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0